DOB filing B01119163-P2
Alteration filing at 295 Front Street
Building record · BIN 3000116
295 Front Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3000116
295 Front Street
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Sep 10, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story office building built in 1913, on a 13,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 80 notices on file; the most recent was issued Jan 13, 1997.
Issued Jan 13, 1997
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3000116. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 13 alteration filing. Its latest status categories are 2 under review, 10 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 295 Front Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mechanical work being filed in conjunction with Alteration application for interior renovation throughout. No change to use, egress or occupancy. Filing B00486149-I1.
Filing B00486149-I1 reached an approved status.
Filing for interior renovation through-out. No change to use, egress or occupancy. Filing B00484854-I1.
Plumbing and Sprinkler work being filed in conjunction with Alteration application for interior renovation throughout. No change to use, egress or occupancy. Filing B00485267-I1.
Filing B00485267-I1 reached an approved status.
Filing for interior renovation through-out. No change to use, egress or occupancy. Filing B00484854-S1.
Filing B00484854-S1 reached an approved status.
DOB lists a first permit date for B00484854-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00486149-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00485267-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00485267-I1 is “Permit Entire.”
Filing B00484854-I1 reached an approved status.
The latest status recorded for B00484854-I1 is “Approved.”
Foundation work as shown on the plans. Filing B01119163-S6.
Structural work as shown on the plans. Filing B01119163-S5.
Interior general construction as shown on the plans. Filing B01119163-I1.
Exterior work as shown on the plans. Filing B01119163-S1.
Plumbing work as shown on the plans. Filing B01119163-S3.
Mechanical work as shown on the plans. Filing B01119163-S2.
Sprinkler work as shown on the plans. Filing B01119163-S4.
Filing B01119163-S4 reached an approved status.
Filing B01119163-S6 reached an approved status.
Filing B01119163-S5 reached an approved status.
Filing B01119163-I1 reached an approved status.
Filing B01119163-S1 reached an approved status.
DOB recorded a sign-off for B00486149-I1.
The latest status recorded for B00486149-I1 is “LOC Issued.”
Filing B01119163-S2 reached an approved status.
Filing B01119163-S3 reached an approved status.
The latest status recorded for B00484854-S1 is “Permit Entire.”
DOB lists a first permit date for B01119163-S6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01119163-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01119163-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01119163-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01119163-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01119163-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01119163-S4. That is not by itself confirmation of activity on site.
The latest status recorded for B01119163-I1 is “Permit Entire.”
The latest status recorded for B01119163-S1 is “Permit Entire.”
The latest status recorded for B01119163-S3 is “Permit Entire.”
The latest status recorded for B01119163-S2 is “Permit Entire.”
The latest status recorded for B01119163-S4 is “Permit Entire.”
Plumbing work as shown on the plans. Filing B01119163-P2.
Mechanical work as shown on the plans. Filing B01119163-P1.
The latest status recorded for B01119163-S6 is “Permit Entire.”
The latest status recorded for B01119163-S5 is “Permit Entire.”
The latest status recorded for B01119163-P2 is “Plan Examiner Review.”
The latest status recorded for B01119163-P1 is “Plan Examiner Review.”