DOB filing B01252046-S2
Alteration filing at 186 Jay Street
Building record · BIN 3000182
186 Jay Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3000182
186 Jay Street
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Sep 24, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 1-story educational building built in 1971, on a 38,565 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 45 open notices on record for this building, out of 146 notices on file; the most recent was issued Jun 30, 2023.
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
42 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3000182. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing. Its latest status categories are 6 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 186 Jay Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Demolition and installation of ducts and exhaust fans. Filing B00274112-I1.
Bathroom renovations on floors cellar, 1, 2 ,4-8 to provide ADA access including fixture and piping replacement. Filing B00274115-I1.
Filing B00274112-I1 reached an approved status.
Filing B00274115-I1 reached an approved status.
DOB lists a first permit date for B00274115-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00274112-I1. That is not by itself confirmation of activity on site.
Structural work to accommodate installation of new HVAC units as per the plans filed herewith. no change to use, egress or occupancy. Filing B08032312-I1.
Filing B08032312-I1 reached an approved status.
Bathroom renovations on floors cellar, 1, 2 ,4-8 to provide ADA access including fixture and piping replacement. Filing B00274115-P1.
Demolition and installation of ducts and exhaust fans. Filing B00274112-P1.
Filing B00274115-P1 reached an approved status.
The latest status recorded for B00274115-P1 is “Approved.”
Filing B00274112-P1 reached an approved status.
The latest status recorded for B00274112-P1 is “Approved.”
Plumbing work for Temporary and Permanent Gas Piping in conjunction with HVAC Upgrade as per the plans filed herewith. No change to the use, egress or occupancy. Filing B01201517-I1.
Filing B01201517-I1 reached an approved status.
DOB lists a first permit date for B01201517-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B08032312-I1. That is not by itself confirmation of activity on site.
Interior renovations of existing classrooms and computer labs as per plans. minor partition changes. no change of use, egress or occupancy under this application. Filing B01229925-I1.
DOB recorded a sign-off for B00274115-I1.
The latest status recorded for B00274115-I1 is “LOC Issued.”
Application filed to installed split system A/C unit as per plans. Filing B01252046-S2.
DOB recorded a sign-off for B00274112-I1.
The latest status recorded for B00274112-I1 is “LOC Issued.”
Filing B01229925-I1 reached an approved status.
Filing B01252046-S2 reached an approved status.
DOB lists a first permit date for B01229925-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01229925-I1 is “Permit Entire.”
The latest status recorded for B08032312-I1 is “Permit Entire.”
The latest status recorded for B01201517-I1 is “Permit Entire.”
DOB lists a first permit date for B01252046-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B01252046-S2 is “Permit Entire.”