DOB filing B01307619-P1
Alteration filing at 329 Jay Street
Building record · BIN 3000265
6 Metrotech Center, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3000265
6 Metrotech Center
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 8-story condominium built in 1920, on a 46,024 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 43 open notices on record for this building, out of 54 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
40 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3000265. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 1 under review, 5 recorded as completed, 6 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 6 Metrotech Center.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of heavy duty sidewalk shed during building alteration, filed separately. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00021405-I1.
DOB lists a first permit date for B00021405-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00099471-I1.
DOB lists a first permit date for B00099471-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold as per plans. No change in use, egress, or occupancy. Filing B00106715-I1.
DOB lists a first permit date for B00106715-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00107676-I1.
DOB lists a first permit date for B00107676-I1. That is not by itself confirmation of activity on site.
Installation of system scaffold as per drawings. system scaffold shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00117950-I1.
DOB lists a first permit date for B00117950-I1. That is not by itself confirmation of activity on site.
Installation of system scaffold as per drawings. scaffold shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00158415-I1.
DOB lists a first permit date for B00158415-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00099471-I1.
DOB recorded a sign-off for B00107676-I1.
DOB recorded a sign-off for B00117950-I1.
DOB recorded a sign-off for B00158415-I1.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00432018-I1.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00432027-I1.
DOB lists a first permit date for B00432018-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00432027-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00158415-I1 is “LOC Issued.”
The latest status recorded for B00021405-I1 is “Permit Entire.”
The latest status recorded for B00099471-I1 is “LOC Issued.”
The latest status recorded for B00106715-I1 is “Permit Entire.”
The latest status recorded for B00107676-I1 is “LOC Issued.”
The latest status recorded for B00117950-I1 is “LOC Issued.”
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00432018-P1.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00432027-P1.
Filing B00432018-P1 reached an approved status.
The latest status recorded for B00432018-P1 is “Approved.”
Filing B00432027-P1 reached an approved status.
The latest status recorded for B00432027-P1 is “Approved.”
The latest status recorded for B00432018-I1 is “Permit Entire.”
The latest status recorded for B00432027-I1 is “Permit Entire.”
Interior Renovation of the 5th Floor for installation of temporary core sprinkler protection with 35 amount of heads. Filing B01314831-I1.
Filing B01314831-I1 reached an approved status.
DOB lists a first permit date for B01314831-I1. That is not by itself confirmation of activity on site.
Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan. Filing B01307619-P1.
DOB recorded a sign-off for B01314831-I1.
The latest status recorded for B01314831-I1 is “LOC Issued.”
The latest status recorded for B01307619-P1 is “Objections.”