DOB filing B00353901-I1
Alteration filing at 145 Henry Street
Building record · BIN 3001884
145 Henry Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3001884
145 Henry Street
Brooklyn Heights, Brooklyn
A consolidated public-record view · updated May 13, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story elevator apartment building built in 1921, with 42 homes, on a 9,250 sq ft lot.
What it sold for
5 apartments on this tax block changed hands in the year the city last published, at a median of $799,000, from 385,000 to 1,925,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
ONE MONROE LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 31 notices on file; the most recent was issued Aug 16, 1993.
Issued Aug 16, 1993
Issued Jun 6, 1992
Issued Mar 19, 1991 — DEVICE #3P701
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3001884. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 5 alteration filing. Its latest status categories are 2 recorded as completed, 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 145 Henry Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work to include the installation of fixtures and associated piping in apartments 2c, 2d, 2e, 3c, 4d, 4e, 5d and 5e as per plans filed herewith. no change to occupancy, use or egress. Filing B00236564-I1.
Filing B00236564-I1 reached an approved status.
Plumbing modifications to include installation, replacement on existing roughing and relocation of fixtures and associated piping to include the conversion of gas stoves to electrical as per plans filed herewith. No change to occupancy, use or egress. Filing B00299054-I1.
DOB lists a first permit date for B00236564-I1. That is not by itself confirmation of activity on site.
Plumbing modifications to include installation, replacement on existing roughing and relocation of fixtures and associated piping to include the conversion of gas stoves to electrical as per plans filed herewith. No change to occupancy, use or egress. Filing B00325886-I1.
Filing B00299054-I1 reached an approved status.
DOB lists a first permit date for B00299054-I1. That is not by itself confirmation of activity on site.
Filing B00325886-I1 reached an approved status.
DOB lists a first permit date for B00325886-I1. That is not by itself confirmation of activity on site.
Plumbing modification including replacement & installation of fixtures, conversion of gas stoves to electric stoves & removal of associated gas meters in conjunction with the apartment renovations as per plans filed. No change to occupancy, use or egress. Filing B00353901-I1.
Filing B00353901-I1 reached an approved status.
DOB lists a first permit date for B00353901-I1. That is not by itself confirmation of activity on site.
Installation of heavyduty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 NYC building code. Filing B00401656-I1.
DOB lists a first permit date for B00401656-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00401656-I1 is “Permit Entire.”
The latest status recorded for B00299054-I1 is “Permit Entire.”
DOB recorded a sign-off for B00236564-I1.
The latest status recorded for B00236564-I1 is “LOC Issued.”
The latest status recorded for B00325886-I1 is “Permit Entire.”
DOB recorded a sign-off for B00353901-I1.
The latest status recorded for B00353901-I1 is “LOC Issued.”