DOB filing B00353901-I1
Alteration filing at 145 Henry Street
Building record · BIN 3001884
145 Henry Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story elevator apartment building built in 1921, with 42 homes, on a 9,250 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3001884. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 2 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 145 Henry Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work to include the installation of fixtures and associated piping in apartments 2c, 2d, 2e, 3c, 4d, 4e, 5d and 5e as per plans filed herewith. no change to occupancy, use or egress. Filing B00236564-I1.
Filing B00236564-I1 reached an approved status.
DOB lists a first permit date for B00236564-I1. That is not by itself confirmation of activity on site.
Plumbing modifications to include installation, replacement on existing roughing and relocation of fixtures and associated piping to include the conversion of gas stoves to electrical as per plans filed herewith. No change to occupancy, use or egress. Filing B00325886-I1.
Filing B00325886-I1 reached an approved status.
DOB lists a first permit date for B00325886-I1. That is not by itself confirmation of activity on site.
Plumbing modification including replacement & installation of fixtures, conversion of gas stoves to electric stoves & removal of associated gas meters in conjunction with the apartment renovations as per plans filed. No change to occupancy, use or egress. Filing B00353901-I1.
Filing B00353901-I1 reached an approved status.
DOB lists a first permit date for B00353901-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00236564-I1.
The latest status recorded for B00236564-I1 is “LOC Issued.”
The latest status recorded for B00325886-I1 is “Permit Entire.”
DOB recorded a sign-off for B00353901-I1.
The latest status recorded for B00353901-I1 is “LOC Issued.”