Building record · BIN 3002006

128 Pierrepont Street

128 Pierrepont Street, Brooklyn, NY 11201

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3002006

128 Pierrepont Street

Brooklyn Heights, Brooklyn

A consolidated public-record view · updated Sep 8, 2026

DOB filings
3
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings3
Open or active-status records1
First included filingFeb 3, 2023
Latest recorded changeSep 8, 2026

The lot

What is already here?

The lot holds a 5-story place of public assembly built in 1878, on a 7,500 sq ft lot.

Built
1878
Last altered
2012
Floors
5
Residential units
0
Building type
Place of public assembly
Land use
Public facilities and institutions
Zoning district
C5-2A
Lot area
7,500 sq ft
Building area
31,294 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 26 notices on file; the most recent was issued Nov 8, 2019.

  • Low pressure boiler

    Issued Nov 8, 2019 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT

  • Local law 10/81 -

    Issued Jan 13, 1997

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3002006. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 alteration filing. Its latest status categories are 2 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 3, 2023
Latest recorded change
Sep 8, 2026
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 128 Pierrepont Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Provide chiller make up water service meter, back flow preventer-rpzvalves and associated piping in compliance with dep requirements. Filing B00802633-I1.

    01
  2. Alteration approved

    Filing B00802633-I1 reached an approved status.

    02
  3. Alteration filed

    Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valves, dampers, BIMS system upgrade. Filing B00802156-I1.

    03
  4. Alteration approved

    Filing B00802156-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B00802156-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00802633-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valves, dampers, BIMS system upgrade. Filing B00802156-P1.

    07
  8. Alteration now under review

    The latest status recorded for B00802156-P1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    08
  9. Alteration signed off

    DOB recorded a sign-off for B00802633-I1.

    09
  10. Alteration now completed

    The latest status recorded for B00802633-I1 is “LOC Issued.”

    010
  11. Alteration signed off

    DOB recorded a sign-off for B00802156-I1.

    011
  12. Alteration now completed

    The latest status recorded for B00802156-I1 is “LOC Issued.”

    012