DOB filing B01398578-S3
Alteration filing at 98 Montague Street
Building record · BIN 3002054
98 Montague Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3002054
98 Montague Street
Brooklyn Heights, Brooklyn
A consolidated public-record view · updated Sep 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 12-story hotel built in 1909, on a 15,600 sq ft lot.
The apartments
12 condominium apartments are assessed on this block, and the typical one is 683 sq ft (63 m²). They run from 63 to 63 m².
The city values the typical one at $460,217. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
1 apartment on this tax block changed hands in the year the city last published, at a median of $4,500,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
FOXBORO REAL ESTATE INC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 39 open notices on record for this building, out of 119 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
36 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3002054. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 9 alteration filing. Its latest status categories are 8 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 98 Montague Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install new steam fired water heaters for Hotel. No Change to use , egress or occupancy. Filing B00337978-I1.
Filing B00337978-I1 reached an approved status.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00379221-I1.
Filing B00379221-I1 reached an approved status.
DOB lists a first permit date for B00379221-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00337978-I1 is “Approved.”
The latest status recorded for B00379221-I1 is “Permit Entire.”
Installation of temporary sidewalk shed canopy as per plans. no change in use, egress or occupancy. Filing B01307508-I1.
Filing B01307508-I1 reached an approved status.
DOB lists a first permit date for B01307508-I1. That is not by itself confirmation of activity on site.
Install temporary dry standpipe system with air pressurized alarm system during renovation of the building. Related job number, B01398578-I1. Filing B01398667-I1.
Mechanical means submitted for use of mechanical equipment at the time of demolition in conjunction with the interior demo application. Filing B01398578-S3.
Filing B01398667-I1 reached an approved status.
DOB lists a first permit date for B01398667-I1. That is not by itself confirmation of activity on site.
Filing B01398578-S3 reached an approved status.
Install temporary dry standpipe system with air pressurized alarm system during renovation of the building. Related job number, B01398578-I1. Filing B01398667-P1.
Sprinkler modification throughout building as per plans. No change in use, egress or occupancy. Filing B01398578-S4.
Filing B01398578-S4 reached an approved status.
File suspended scaffold outrigger systems for facade restoration and inspection. Filing B01449430-I1.
Filing B01398667-P1 reached an approved status.
The latest status recorded for B01398667-I1 is “Permit Entire.”
The latest status recorded for B01398667-P1 is “Approved.”
The latest status recorded for B01449430-I1 is “Pending Plan Examiner Assignment.”
The latest status recorded for B01307508-I1 is “Permit Entire.”
File-supported pipe scaffold as shown on the plan. no change in use, egress, or occupancy under this application. Filing B01449424-I1.
DOB lists a first permit date for B01449424-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01449424-I1 is “Permit Entire.”
DOB lists a first permit date for B01398578-S4. That is not by itself confirmation of activity on site.
The latest status recorded for B01398578-S4 is “Permit Entire.”
DOB lists a first permit date for B01398578-S3. That is not by itself confirmation of activity on site.
The latest status recorded for B01398578-S3 is “Permit Entire.”