DOB filing B00222879-I1
Alteration filing at 131 Remsen Street
Building record · BIN 3002069
131 Remsen Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3002069
131 Remsen Street
Brooklyn Heights, Brooklyn
A consolidated public-record view · updated Nov 29, 2022
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3002069. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 11 alteration filing. Its latest status categories are 4 recorded as completed, 7 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 131 Remsen Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Structural work proposed for brooklyn height synagogue -framing proposed. Filing B00220947-I1.
Plumbing work proposed for brooklyn heights synagogue. Filing B00222879-I1.
Removal of existing mechanical equipment and duct work. installation of new mechanical equipment (new HVAC system) and associated duct work and refrigerant lines. Filing B00220975-I1.
Modification to an existing sprinkler system proposed as per plans. Filing B00223458-I1.
Filing B00222879-I1 reached an approved status.
Filing B00220947-I1 reached an approved status.
Filing B00220975-I1 reached an approved status.
Plumbing work proposed for brooklyn heights synagogue. Filing B00222879-P1.
Structural work proposed for brooklyn height synagogue -framing proposed. Filing B00220947-P1.
Removal of existing mechanical equipment and duct work. installation of new mechanical equipment (new HVAC system) and associated duct work and refrigerant lines. Filing B00220975-P1.
Filing B00222879-P1 reached an approved status.
Filing B00220975-P1 reached an approved status.
DOB lists a first permit date for B00220947-I1. That is not by itself confirmation of activity on site.
Filing B00220947-P1 reached an approved status.
DOB lists a first permit date for B00220975-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00222879-I1. That is not by itself confirmation of activity on site.
Filing B00223458-I1 reached an approved status.
Plumbing work proposed for brooklyn heights synagogue. Filing B00222879-P2.
Filing B00222879-P2 reached an approved status.
DOB lists a first permit date for B00223458-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00220975-P1 is “Approved.”
The latest status recorded for B00220947-P1 is “Approved.”
The latest status recorded for B00222879-P1 is “Approved.”
The latest status recorded for B00222879-P2 is “Approved.”
Plumbing work proposed for brooklyn heights synagogue. Filing B00222879-P3.
Filing B00222879-P3 reached an approved status.
The latest status recorded for B00222879-P3 is “Approved.”
Plumbing work proposed for brooklyn heights synagogue. Filing B00222879-P5.
Filing B00222879-P5 reached an approved status.
The latest status recorded for B00222879-P5 is “Approved.”
Removal of existing mechanical equipment and duct work. installation of new mechanical equipment (new HVAC system) and associated duct work and refrigerant lines. Filing B00220975-P2.
Filing B00220975-P2 reached an approved status.
The latest status recorded for B00220975-P2 is “Approved.”
DOB recorded a sign-off for B00220975-I1.
The latest status recorded for B00220975-I1 is “LOC Issued.”
DOB recorded a sign-off for B00223458-I1.
The latest status recorded for B00223458-I1 is “LOC Issued.”
DOB recorded a sign-off for B00220947-I1.
The latest status recorded for B00220947-I1 is “LOC Issued.”
DOB recorded a sign-off for B00222879-I1.
The latest status recorded for B00222879-I1 is “LOC Issued.”