DOB filing B00211676-I1
Alteration filing at 200 Montague Street
Building record · BIN 3002107
200 Montague Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 18 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3002107
200 Montague Street
Brooklyn Heights, Brooklyn
A consolidated public-record view · updated Mar 27, 2023
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 20-story elevator apartment building built in 2021, with 121 homes, on a 10,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 25 open notices on record for this building, out of 133 notices on file; the most recent was issued Sep 6, 2006.
Issued Sep 6, 2006
Issued Sep 5, 2006
Issued Sep 5, 2006
22 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3002107. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 18 alteration filing. Its latest status categories are 9 recorded as completed, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 200 Montague Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 18 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of temporary construction plywood fence as per plans during construction. no change in use, egress or occupancy. fence to comply with chapter 33 of NYC building code of 2014. Filing B00211676-I1.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00219971-I1.
DOB lists a first permit date for B00219971-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00219975-I1.
DOB lists a first permit date for B00219975-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00211676-I1. That is not by itself confirmation of activity on site.
Boiler work in conjunction with NB $ 321387352. Filing B00334604-I1.
Filing B00334604-I1 reached an approved status.
Installation of temporary fence as per plans. no change in use, egress or occupancy. Filing B00382400-I1.
Filing B00382400-I1 reached an approved status.
DOB lists a first permit date for B00382400-I1. That is not by itself confirmation of activity on site.
Installation of temporary fence as per plans. no change in use, egress or occupancy. Filing B00408216-I1.
DOB lists a first permit date for B00408216-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00219971-I1.
The latest status recorded for B00219971-I1 is “LOC Issued.”
DOB recorded a sign-off for B00219975-I1.
The latest status recorded for B00219975-I1 is “LOC Issued.”
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy. Filing B00475912-I1.
DOB lists a first permit date for B00475912-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00482181-I1.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. Filing B00482190-I1.
DOB lists a first permit date for B00482181-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00482190-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00334604-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00482181-P1.
Filing B00482181-P1 reached an approved status.
The latest status recorded for B00482181-P1 is “Approved.”
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. Filing B00482190-P1.
Filing B00482190-P1 reached an approved status.
The latest status recorded for B00482190-P1 is “Approved.”
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00482181-P2.
Filing B00482181-P2 reached an approved status.
The latest status recorded for B00482181-P2 is “Approved.”
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00482181-P3.
Filing B00482181-P3 reached an approved status.
The latest status recorded for B00482181-P3 is “Approved.”
Boiler work in conjunction with NB $ 321387352. Filing B00334604-P1.
Filing B00334604-P1 reached an approved status.
The latest status recorded for B00334604-P1 is “Approved.”
Boiler work in conjunction with NB $ 321387352. Filing B00334604-P2.
Filing B00334604-P2 reached an approved status.
The latest status recorded for B00334604-P2 is “Approved.”
DOB recorded a sign-off for B00475912-I1.
The latest status recorded for B00475912-I1 is “LOC Issued.”
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00482181-P4.
Filing B00482181-P4 reached an approved status.
The latest status recorded for B00482181-P4 is “Approved.”
Installation of temporary fence as per plans. no change in use, egress or occupancy. Filing B00408216-P1.
Filing B00408216-P1 reached an approved status.
The latest status recorded for B00408216-P1 is “Approved.”
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00482181-P5.
Filing B00482181-P5 reached an approved status.
The latest status recorded for B00482181-P5 is “Approved.”
DOB recorded a sign-off for B00334604-I1.
The latest status recorded for B00334604-I1 is “LOC Issued.”
DOB recorded a sign-off for B00408216-I1.
The latest status recorded for B00408216-I1 is “LOC Issued.”
DOB recorded a sign-off for B00482181-I1.
The latest status recorded for B00482181-I1 is “LOC Issued.”
DOB recorded a sign-off for B00482190-I1.
The latest status recorded for B00482190-I1 is “LOC Issued.”
DOB recorded a sign-off for B00382400-I1.
The latest status recorded for B00382400-I1 is “LOC Issued.”
DOB recorded a sign-off for B00211676-I1.
The latest status recorded for B00211676-I1 is “LOC Issued.”