DOB filing B00128174-I1
Alteration filing at 143 Summit Street
Building record · BIN 3004903
143 Summit Street, Brooklyn, NY 11231
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3004903
143 Summit Street
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Dec 28, 2020
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3004903. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 5 alteration filing. Its latest status categories are 3 recorded as completed, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 143 Summit Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00128174-I1.
DOB lists a first permit date for B00128174-I1. That is not by itself confirmation of activity on site.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00128174-P1.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00131944-I1.
Filing B00128174-P1 reached an approved status.
DOB lists a first permit date for B00131944-I1. That is not by itself confirmation of activity on site.
Temporary plywood fence associated with alteration i 321517710. no change to the use, egress or occupancy. Filing B00178258-I1.
Filing B00178258-I1 reached an approved status.
DOB lists a first permit date for B00178258-I1. That is not by itself confirmation of activity on site.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00131944-P1.
Filing B00131944-P1 reached an approved status.
DOB recorded a sign-off for B00131944-I1.
DOB recorded a sign-off for B00128174-I1.
DOB recorded a sign-off for B00178258-I1.
The latest status recorded for B00131944-P1 is “Approved.”
The latest status recorded for B00178258-I1 is “LOC Issued.”
The latest status recorded for B00128174-I1 is “LOC Issued.”
The latest status recorded for B00128174-P1 is “Approved.”
The latest status recorded for B00131944-I1 is “LOC Issued.”