DOB filing B01440581-I1
Alteration filing at 74 Second Place
Building record · BIN 3005276
74 Second Place, Brooklyn, NY 11231
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3005276
74 Second Place
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Sep 3, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story condominium built in 1922, with 10 homes, on a 5,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 9, 2026. They describe the tax lot, not any single filing.
Violation record
No open violations are recorded for this building. 3 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3005276. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 8 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 74 Second Place.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of temporary 66' high pipe scaffold originating (off grade) for remedial repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00225877-I1.
Filing B00225877-I1 reached an approved status.
DOB lists a first permit date for B00225877-I1. That is not by itself confirmation of activity on site.
Plumbing work filed in conjunction with #340775824, renovation of unit 1a. Filing B00417429-I1.
Mechanical work filed in conjunction with #340775824. install new mini split ac system. Filing B00417433-I1.
Filing B00417433-I1 reached an approved status.
Filing B00417429-I1 reached an approved status.
DOB lists a first permit date for B00417429-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00225877-I1 is “Permit Entire.”
DOB lists a first permit date for B00417433-I1. That is not by itself confirmation of activity on site.
Plumbing work filed in conjunction with #340775824, renovation of unit 1a. Filing B00417429-P1.
Filing B00417429-P1 reached an approved status.
The latest status recorded for B00417429-P1 is “Approved.”
Plumbing work filed in conjunction with #340775824, renovation of unit 1a. Filing B00417429-P2.
Filing B00417429-P2 reached an approved status.
The latest status recorded for B00417429-P2 is “Approved.”
Plumbing work filed in conjunction with #340775824, renovation of unit 1a. Filing B00417429-P3.
Filing B00417429-P3 reached an approved status.
The latest status recorded for B00417429-P3 is “Approved.”
Mechanical work filed in conjunction with #340775824. install new mini split ac system. Filing B00417433-P1.
Filing B00417433-P1 reached an approved status.
The latest status recorded for B00417433-P1 is “Approved.”
DOB recorded a sign-off for B00417433-I1.
The latest status recorded for B00417433-I1 is “LOC Issued.”
DOB recorded a sign-off for B00417429-I1.
The latest status recorded for B00417429-I1 is “LOC Issued.”
Renovation of apartment. Filing B01325125-S2.
Filing B01325125-S2 reached an approved status.
DOB lists a first permit date for B01325125-S2. That is not by itself confirmation of activity on site.
Mechanical dunnage installation as per plans. work shall include placement and anchoring of new beams and masonry repairs. no change in use, egress or occupancy. Filing B01440581-I1.
The latest status recorded for B01325125-S2 is “Permit Entire.”
Renovation of apartment. Filing B01325125-P4.
Filing B01325125-P4 reached an approved status.
The latest status recorded for B01325125-P4 is “Approved.”
Filing B01440581-I1 reached an approved status.
DOB lists a first permit date for B01440581-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01440581-I1 is “Permit Entire.”