DOB filing B00351087-I1
Alteration filing at 86 Second Place
Building record · BIN 3005281
86 Second Place, Brooklyn, NY 11231
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3005281
86 Second Place
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Dec 27, 2020
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3005281. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 86 Second Place.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed new bathroom at basement level unit. Filing B00351148-I1.
Filing B00351148-I1 reached an approved status.
DOB lists a first permit date for B00351148-I1. That is not by itself confirmation of activity on site.
Installation of ventilation fan for new bathroom. Filing B00351087-I1.
Filing B00351087-I1 reached an approved status.
DOB lists a first permit date for B00351087-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00351087-I1 is “Permit Entire.”
The latest status recorded for B00351148-I1 is “Permit Entire.”