Building record · BIN 3005545

538 Clinton Street

538 Clinton Street, Brooklyn, NY 11231

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3005545

538 Clinton Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Jun 22, 2022

DOB filings
6
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings6
Open or active-status records2
First included filingApr 18, 2019
Latest recorded changeJun 22, 2022

The lot

What is already here?

The lot holds a 3-story condominium built in 1899, with 5 homes, on a 2,250 sq ft lot.

  1. Floors 2–3Homes5 homes are recorded on this lot — about 3 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as walk-up apartments.
  • Street levelWalk-up apartments
  • Homes5 recorded on the lot
  • Above the southern skylineFrom about floor 16 — the tallest thing within 60 m to the south is 47.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 11 m over 3 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1899
Floors
3
Residential units
5
Building type
Condominium
Land use
Walk-up apartments
Zoning district
R6B
Lot area
2,250 sq ft
Building area
6,191 sq ft

What it sold for

6 apartments on this tax block changed hands in the year the city last published, at a median of $1,476,463, from 745,000 to 2,573,269.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 5 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3005545. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 6 alteration filing. Its latest status categories are 4 recorded as completed, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 18, 2019
Latest recorded change
Jun 22, 2022
Highest proposed story count
Not stated
Highest proposed unit count
3 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 538 Clinton Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Construct new 12 foot curb cut in conjunction with alt 1 #321744519. Filing B00085294-I1.

    01
  2. Alteration filed

    Fence filed in conjunction with application # 321744519. Filing B00169238-I1.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00169238-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration approved

    Filing B00085294-I1 reached an approved status.

    04
  5. Alteration filed

    Installation of temporary heavy duty sidewalk shed and temporary construction fence as per plans. no change in use, egress or occupancy.sidewalk shed and construction fence shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00198773-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00198773-I1. That is not by itself confirmation of activity on site.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B00085294-I1. That is not by itself confirmation of activity on site.

    07
  8. Alteration filed

    Installation of temporary heavy duty sidewalk shed and temporary construction fence as per plans. no change in use, egress or occupancy.sidewalk shed and construction fence shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00198773-P1.

    08
  9. Alteration approved

    Filing B00198773-P1 reached an approved status.

    09
  10. Alteration filed

    Installation of temporary 36' high pipe scaffold originating (off shed) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00335594-I1.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00335594-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration filed

    Installation of temporary 36' high pipe scaffold originating (off shed) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00335594-P1.

    012
  13. Alteration approved

    Filing B00335594-P1 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for B00198773-P1 is “Approved.”

    014
  15. Alteration now approved

    The latest status recorded for B00335594-P1 is “Approved.”

    015
  16. Alteration signed off

    DOB recorded a sign-off for B00335594-I1.

    016
  17. Alteration now completed

    The latest status recorded for B00335594-I1 is “LOC Issued.”

    017
  18. Alteration signed off

    DOB recorded a sign-off for B00198773-I1.

    018
  19. Alteration now completed

    The latest status recorded for B00198773-I1 is “LOC Issued.”

    019
  20. Alteration signed off

    DOB recorded a sign-off for B00085294-I1.

    020
  21. Alteration now completed

    The latest status recorded for B00085294-I1 is “LOC Issued.”

    021
  22. Alteration signed off

    DOB recorded a sign-off for B00169238-I1.

    022
  23. Alteration now completed

    The latest status recorded for B00169238-I1 is “LOC Issued.”

    023