Building record · BIN 3005967

270 Bergen Street

270 Bergen Street, Brooklyn, NY 11217

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3005967

270 Bergen Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Oct 22, 2026

DOB filings
13
Active-status
12
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings13
Open or active-status records12
First included filingSep 30, 2019
Latest recorded changeOct 22, 2026

The lot

What is already here?

The lot holds a vacant land on a 14,750 sq ft lot.

Last altered
2024
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R7A
Lot area
14,750 sq ft

What it sold for

1 apartment on this tax block changed hands in the year the city last published, at a median of $580,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

BERGEN ST EQUITY LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 63 notices on file; the most recent was issued Nov 14, 2025.

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3005967. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 new building, 8 alteration filing. Its latest status categories are 1 under review, 11 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 30, 2019
Latest recorded change
Oct 22, 2026
Highest proposed story count
11 stories
Highest proposed unit count
99 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 270 Bergen Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Replace existing gas line from locked lubricated plug valve to existing gas boiler on 1st floor and 3 existing suspended furnaces at 1st floor ceiling and existing cooling unit on the 1st floor roof. Filing B00232275-I1.

    01
  2. Alteration approved

    Filing B00232275-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00232275-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration signed off

    DOB recorded a sign-off for B00232275-I1.

    04
  5. Alteration now completed

    The latest status recorded for B00232275-I1 is “LOC Issued.”

    05
  6. New building filed

    11 Story + Cellar Residential building. Filing B01172199-I1.

    06
  7. New building filed

    Support of Excavation drawings filed in conjunction with NB application # B01172199-I1. Filing B01172199-S1.

    07
  8. New building filed

    Underpinning filed in conjunction to application B01172199-S1. Filing B01172199-S3.

    08
  9. New building approved

    Filing B01172199-S1 reached an approved status.

    09
  10. New building approved

    Filing B01172199-S3 reached an approved status.

    010
  11. Alteration filed

    Filing for installation of engineered enclosure system per 3309.17. Filing B01242687-I1.

    011
  12. Alteration approved

    Filing B01242687-I1 reached an approved status.

    012
  13. New building filed

    Mechanical System filed in conjunction to NB application # B01172199-I1. Filing B01172199-S6.

    013
  14. New building approved

    Filing B01172199-I1 reached an approved status.

    014
  15. Permit recorded for new building

    DOB lists a first permit date for B01172199-S1. That is not by itself confirmation of activity on site.

    015
  16. Permit recorded for new building

    DOB lists a first permit date for B01172199-S3. That is not by itself confirmation of activity on site.

    016
  17. New building approved

    Filing B01172199-S6 reached an approved status.

    017
  18. Permit recorded for new building

    DOB lists a first permit date for B01172199-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Installation of 300 psf sidewalk shed overhead protection plywood fence and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing B01438621-I1.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for B01438621-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Installation of pipe scaffolding engineered enclosure and needle beams as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application. Filing B01447654-I1.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for B01447654-I1. That is not by itself confirmation of activity on site.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for B01242687-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration now approved

    The latest status recorded for B01242687-I1 is “Permit Entire.”

    024
  25. Alteration filed

    Installation of 300 psf sidewalk shed overhead protection plywood fence and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing B01438621-P1.

    025
  26. Alteration filed

    Installation and use of temporary material platforms as per plans filed herewith. no change in use, egress or occupancy. Filing B01454815-I1.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for B01454815-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration now approved

    The latest status recorded for B01454815-I1 is “Permit Entire.”

    028
  29. Alteration approved

    Filing B01438621-P1 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for B01438621-P1 is “Approved.”

    030
  31. Alteration now approved

    The latest status recorded for B01438621-I1 is “Permit Entire.”

    031
  32. Permit recorded for new building

    DOB lists a first permit date for B01172199-S6. That is not by itself confirmation of activity on site.

    032
  33. New building now approved

    The latest status recorded for B01172199-S6 is “Permit Entire.”

    033
  34. Alteration filed

    Installation of temporary personnel hoist as per plans. no change in use, egress or occupancy. Filing B01459494-I1.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for B01459494-I1. That is not by itself confirmation of activity on site.

    035
  36. Alteration now approved

    The latest status recorded for B01459494-I1 is “Permit Entire.”

    036
  37. Alteration filed

    Installation of pipe scaffolding engineered enclosure and needle beams as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application. Filing B01447654-P1.

    037
  38. Alteration approved

    Filing B01447654-P1 reached an approved status.

    038
  39. Alteration now approved

    The latest status recorded for B01447654-P1 is “Approved.”

    039
  40. Alteration now approved

    The latest status recorded for B01447654-I1 is “Permit Entire.”

    040
  41. New building filed

    11 Story + Cellar Residential building. Filing B01172199-P6.

    041
  42. New building now approved

    The latest status recorded for B01172199-I1 is “Permit Entire.”

    042
  43. New building now approved

    The latest status recorded for B01172199-S3 is “Permit Entire.”

    043
  44. New building now under review

    The latest status recorded for B01172199-P6 is “Plan Examiner Review.”

    044
  45. New building now approved

    The latest status recorded for B01172199-S1 is “Permit Entire.”

    045