DOB filing B01396721-S3
Alteration filing at 595 Clinton Street
Building record · BIN 3008517
595 Clinton Street, Brooklyn, NY 11231
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3008517
595 Clinton Street
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Sep 2, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story health facility built in 1971, on a 14,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 7 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3008517. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing. Its latest status categories are 4 under review, 3 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 595 Clinton Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install non-illuminated double faced banner sign on wall (strong place day care). Filing B00182519-I1.
Filing B00182519-I1 reached an approved status.
Install non-illuminated double faced banner sign on wall (strong place day care). Filing B00182569-I1.
Install non-illuminated wall sign (strong place daycare). Filing B00182597-I1.
Filing B00182597-I1 reached an approved status.
Filing B00182569-I1 reached an approved status.
DOB lists a first permit date for B00182519-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00182569-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00182597-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00182519-I1.
DOB recorded a sign-off for B00182569-I1.
DOB recorded a sign-off for B00182597-I1.
The latest status recorded for B00182519-I1 is “LOC Issued.”
The latest status recorded for B00182569-I1 is “LOC Issued.”
The latest status recorded for B00182597-I1 is “LOC Issued.”
Roof replacement including Masonry/Facade work. Filing B01396721-I1.
Reinforcement of cmu parapet walls, steel lintel/relieving angle replacementwhere required, and structural work to support new rooftop mep units on new dunnage including and new openings in existing slab and reinforcement of existing roof framing. Filing B01396721-S3.
Removal and replacement of mechanical equipment and associated piping. Filing B01396721-S1.
Removal and replacement of roof drain assemblies & pressure wash and clear all roof drains, test drains and drain pipes. Removal and relocation of existing vents and provide vent extensions. Removal and replacement of plumbing fixtures on second floor. Filing B01396721-S2.
The latest status recorded for B01396721-S3 is “Plan Examiner Review.”
The latest status recorded for B01396721-S1 is “Plan Examiner Review.”
The latest status recorded for B01396721-S2 is “Plan Examiner Review.”
The latest status recorded for B01396721-I1 is “Plan Examiner Review.”