DOB filing B00680917-I1
New building at 175 3 Street
Building record · BIN 3020885
175 3 Street, Brooklyn, NY 11215
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3020885
175 3 Street
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 1-story garage or fuel station built in 1973, on a 120,793 sq ft lot.
Owner of record
GOWANUS 3RD STREET OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3020885. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 new building. Its latest status categories are 9 approved, 3 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 175 3 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
New 27-story mixed use building as shown on plans. Filing B00680917-I1.
Foundation work, as shown on plans. Filing B00680917-S1.
Filing B00680917-S1 reached an approved status.
Soe work as shown on plans. Filing B00680917-S3.
DOB lists a first permit date for B00680917-S1. That is not by itself confirmation of activity on site.
Filing B00680917-S3 reached an approved status.
DOB lists a first permit date for B00680917-S3. That is not by itself confirmation of activity on site.
Foundation work, as shown on plans. Filing B00680917-P2.
Soe work as shown on plans. Filing B00680917-P3.
Filing B00680917-P3 reached an approved status.
The latest status recorded for B00680917-P3 is “Approved.”
Mechanical work for new building. Filing B00680917-S8.
Sprinkler/standpipe work for new building. Filing B00680917-Z1.
Plumbing work for new building. Filing B00680917-S9.
Temporary standpipe during new building construction. Filing B00680917-Z2.
Structural work for new building. Filing B00680917-S7.
Filing B00680917-Z1 reached an approved status.
The latest status recorded for B00680917-Z1 is “Approved.”
Filing B00680917-Z2 reached an approved status.
The latest status recorded for B00680917-Z2 is “Approved.”
The latest status recorded for B00680917-S7 is “Objections.”
Filing B00680917-P2 reached an approved status.
The latest status recorded for B00680917-P2 is “Approved.”
Soe work as shown on plans. Filing B00680917-P4.
Filing B00680917-P4 reached an approved status.
The latest status recorded for B00680917-P4 is “Approved.”
The latest status recorded for B00680917-S9 is “Objections.”
The latest status recorded for B00680917-S8 is “Objections.”
Installation of fuel oil storage tank connected to emergency generator. Generator filed under mechanical application B00680917-S8. Filing B00680917-Z3.
Filing B00680917-Z3 reached an approved status.
The latest status recorded for B00680917-Z3 is “Approved.”
The latest status recorded for B00680917-S1 is “Permit Entire.”
The latest status recorded for B00680917-S3 is “Permit Entire.”
Filing B00680917-I1 reached an approved status.
DOB lists a first permit date for B00680917-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00680917-I1 is “Permit Entire.”