DOB filing B01231458-P3
Alteration filing at 90 8 Avenue
Building record · BIN 3024655
90 8 Avenue, Brooklyn, NY 11215
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3024655
90 8 Avenue
Park Slope, Brooklyn
A consolidated public-record view · updated Sep 25, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 11-story elevator apartment building built in 1927, with 57 homes, on a 11,286 sq ft lot.
What it sold for
8 apartments on this tax block changed hands in the year the city last published, at a median of $845,000, from 440,000 to 2,450,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
853-855 PRESIDENT LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 28 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3024655. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 20 alteration filing. Its latest status categories are 1 under review, 7 recorded as completed, 12 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 90 8 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Hereby filing minor plumbing work to apartment 4d as per plans filed herewith. Filing B00200003-I1.
Filing B00200003-I1 reached an approved status.
Hereby filing for the interior renovation of apartment 7d on the seventh floor (plumbing work). no change in use, egress or occupancy. Filing B00261569-I1.
Filing B00261569-I1 reached an approved status.
DOB lists a first permit date for B00261569-I1. That is not by itself confirmation of activity on site.
Relocate plumbing fixtures in kitchen, laundry and bathroom in conjunction with interior renovation. general construction filed under separate DOB application. no change in use, occupancy or egress. Filing B00190559-I1.
Filing B00190559-I1 reached an approved status.
DOB lists a first permit date for B00190559-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00200003-I1. That is not by itself confirmation of activity on site.
Removal and installation of plumbing fixtures as per plans submitted as relate to interior renovation of existing 3rd floor apartment no. 3a. Filing B00322944-P1.
Filing B00322944-P1 reached an approved status.
Removal and installation of plumbing fixtures as per plans submitted as relate to interior renovation of existing 3rd floor apartment no. 3a. Filing B00322944-P2.
Filing B00322944-P2 reached an approved status.
The latest status recorded for B00261569-I1 is “Permit Entire.”
The latest status recorded for B00322944-P1 is “Approved.”
The latest status recorded for B00322944-P2 is “Approved.”
Modify plumbing fixtures, no change yo egress, occupancy or use. Filing B00478007-I1.
Filing B00478007-I1 reached an approved status.
DOB lists a first permit date for B00478007-I1. That is not by itself confirmation of activity on site.
Relocate plumbing fixtures in kitchen, laundry and bathroom in conjunction with interior renovation. general construction filed under separate DOB application. no change in use, occupancy or egress. Filing B00190559-P2.
Filing B00190559-P2 reached an approved status.
The latest status recorded for B00190559-P2 is “Approved.”
Facade Repair. Filing B00535569-I1.
Filing B00535569-I1 reached an approved status.
DOB lists a first permit date for B00535569-I1. That is not by itself confirmation of activity on site.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00613008-I1.
DOB lists a first permit date for B00613008-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00190559-I1.
The latest status recorded for B00190559-I1 is “LOC Issued.”
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00613008-P1.
Filing B00613008-P1 reached an approved status.
The latest status recorded for B00613008-P1 is “Approved.”
DOB recorded a sign-off for B00200003-I1.
The latest status recorded for B00200003-I1 is “LOC Issued.”
Facade Repair. Filing B00535569-P1.
Filing B00535569-P1 reached an approved status.
The latest status recorded for B00535569-P1 is “Approved.”
DOB recorded a sign-off for B00478007-I1.
The latest status recorded for B00478007-I1 is “LOC Issued.”
DOB recorded a sign-off for B00613008-I1.
The latest status recorded for B00613008-I1 is “LOC Issued.”
Installation of suspended scaffold for facade work or inspection. Filing B01079298-I1.
Filing B01079298-I1 reached an approved status.
DOB lists a first permit date for B01079298-I1. That is not by itself confirmation of activity on site.
Facade Repair. Filing B00535569-P2.
Filing B00535569-P2 reached an approved status.
The latest status recorded for B00535569-P2 is “Approved.”
Interior Renovation of an existing bathroom in apartment 5D on the 5th Floor. No change in use, or occupancy under this application. Filing B01103661-I1.
General Construction consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-I1.
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-S1.
Filing B01231458-I1 reached an approved status.
DOB lists a first permit date for B01231458-I1. That is not by itself confirmation of activity on site.
Filing B01231458-S1 reached an approved status.
DOB lists a first permit date for B01231458-S1. That is not by itself confirmation of activity on site.
Filing B01103661-I1 reached an approved status.
DOB lists a first permit date for B01103661-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00535569-I1.
The latest status recorded for B00535569-I1 is “LOC Issued.”
Facade Repair. Filing B00535569-P3.
Filing B00535569-P3 reached an approved status.
The latest status recorded for B00535569-P3 is “Approved.”
General Construction consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-P1.
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-P2.
The latest status recorded for B01231458-I1 is “Permit Entire.”
Filing B01231458-P1 reached an approved status.
The latest status recorded for B01231458-P1 is “Approved.”
DOB recorded a sign-off for B01079298-I1.
The latest status recorded for B01079298-I1 is “LOC Issued.”
Filing B01231458-P2 reached an approved status.
The latest status recorded for B01231458-P2 is “Approved.”
The latest status recorded for B01231458-S1 is “Permit Entire.”
DOB recorded a sign-off for B01103661-I1.
The latest status recorded for B01103661-I1 is “LOC Issued.”
Mechanical ventilation as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-P3.
The latest status recorded for B01231458-P3 is “Plan Examiner Review.”