Building record · BIN 3024655

90 8 Avenue

90 8 Avenue, Brooklyn, NY 11215

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3024655

90 8 Avenue

Park Slope, Brooklyn

A consolidated public-record view · updated Sep 25, 2026

DOB filings
20
Active-status
13
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings20
Open or active-status records13
First included filingAug 26, 2019
Latest recorded changeSep 25, 2026

The lot

What is already here?

The lot holds a 11-story elevator apartment building built in 1927, with 57 homes, on a 11,286 sq ft lot.

  1. Floors 2–11Homes57 homes are recorded on this lot — about 6 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes57 recorded on the lot
  • Above the southern skylineFrom about floor 13 — the tallest thing within 60 m to the south is 38.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 48.3 m over 11 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1927
Floors
11
Residential units
57
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7B
Lot area
11,286 sq ft
Building area
73,400 sq ft
Historic district
Park Slope Historic District

What it sold for

8 apartments on this tax block changed hands in the year the city last published, at a median of $845,000, from 440,000 to 2,450,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

853-855 PRESIDENT LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 28 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3024655. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 20 alteration filing. Its latest status categories are 1 under review, 7 recorded as completed, 12 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 26, 2019
Latest recorded change
Sep 25, 2026
Highest proposed story count
11 stories
Highest proposed unit count
57 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 90 8 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Hereby filing minor plumbing work to apartment 4d as per plans filed herewith. Filing B00200003-I1.

    01
  2. Alteration approved

    Filing B00200003-I1 reached an approved status.

    02
  3. Alteration filed

    Hereby filing for the interior renovation of apartment 7d on the seventh floor (plumbing work). no change in use, egress or occupancy. Filing B00261569-I1.

    03
  4. Alteration approved

    Filing B00261569-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B00261569-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Relocate plumbing fixtures in kitchen, laundry and bathroom in conjunction with interior renovation. general construction filed under separate DOB application. no change in use, occupancy or egress. Filing B00190559-I1.

    06
  7. Alteration approved

    Filing B00190559-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00190559-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00200003-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Removal and installation of plumbing fixtures as per plans submitted as relate to interior renovation of existing 3rd floor apartment no. 3a. Filing B00322944-P1.

    010
  11. Alteration approved

    Filing B00322944-P1 reached an approved status.

    011
  12. Alteration filed

    Removal and installation of plumbing fixtures as per plans submitted as relate to interior renovation of existing 3rd floor apartment no. 3a. Filing B00322944-P2.

    012
  13. Alteration approved

    Filing B00322944-P2 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for B00261569-I1 is “Permit Entire.”

    014
  15. Alteration now approved

    The latest status recorded for B00322944-P1 is “Approved.”

    015
  16. Alteration now approved

    The latest status recorded for B00322944-P2 is “Approved.”

    016
  17. Alteration filed

    Modify plumbing fixtures, no change yo egress, occupancy or use. Filing B00478007-I1.

    017
  18. Alteration approved

    Filing B00478007-I1 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for B00478007-I1. That is not by itself confirmation of activity on site.

    019
  20. Alteration filed

    Relocate plumbing fixtures in kitchen, laundry and bathroom in conjunction with interior renovation. general construction filed under separate DOB application. no change in use, occupancy or egress. Filing B00190559-P2.

    020
  21. Alteration approved

    Filing B00190559-P2 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for B00190559-P2 is “Approved.”

    022
  23. Alteration filed

    Facade Repair. Filing B00535569-I1.

    023
  24. Alteration approved

    Filing B00535569-I1 reached an approved status.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for B00535569-I1. That is not by itself confirmation of activity on site.

    025
  26. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00613008-I1.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for B00613008-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration signed off

    DOB recorded a sign-off for B00190559-I1.

    028
  29. Alteration now completed

    The latest status recorded for B00190559-I1 is “LOC Issued.”

    029
  30. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00613008-P1.

    030
  31. Alteration approved

    Filing B00613008-P1 reached an approved status.

    031
  32. Alteration now approved

    The latest status recorded for B00613008-P1 is “Approved.”

    032
  33. Alteration signed off

    DOB recorded a sign-off for B00200003-I1.

    033
  34. Alteration now completed

    The latest status recorded for B00200003-I1 is “LOC Issued.”

    034
  35. Alteration filed

    Facade Repair. Filing B00535569-P1.

    035
  36. Alteration approved

    Filing B00535569-P1 reached an approved status.

    036
  37. Alteration now approved

    The latest status recorded for B00535569-P1 is “Approved.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for B00478007-I1.

    038
  39. Alteration now completed

    The latest status recorded for B00478007-I1 is “LOC Issued.”

    039
  40. Alteration signed off

    DOB recorded a sign-off for B00613008-I1.

    040
  41. Alteration now completed

    The latest status recorded for B00613008-I1 is “LOC Issued.”

    041
  42. Alteration filed

    Installation of suspended scaffold for facade work or inspection. Filing B01079298-I1.

    042
  43. Alteration approved

    Filing B01079298-I1 reached an approved status.

    043
  44. Permit recorded for alteration

    DOB lists a first permit date for B01079298-I1. That is not by itself confirmation of activity on site.

    044
  45. Alteration filed

    Facade Repair. Filing B00535569-P2.

    045
  46. Alteration approved

    Filing B00535569-P2 reached an approved status.

    046
  47. Alteration now approved

    The latest status recorded for B00535569-P2 is “Approved.”

    047
  48. Alteration filed

    Interior Renovation of an existing bathroom in apartment 5D on the 5th Floor. No change in use, or occupancy under this application. Filing B01103661-I1.

    048
  49. Alteration filed

    General Construction consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-I1.

    049
  50. Alteration filed

    Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-S1.

    050
  51. Alteration approved

    Filing B01231458-I1 reached an approved status.

    051
  52. Permit recorded for alteration

    DOB lists a first permit date for B01231458-I1. That is not by itself confirmation of activity on site.

    052
  53. Alteration approved

    Filing B01231458-S1 reached an approved status.

    053
  54. Permit recorded for alteration

    DOB lists a first permit date for B01231458-S1. That is not by itself confirmation of activity on site.

    054
  55. Alteration approved

    Filing B01103661-I1 reached an approved status.

    055
  56. Permit recorded for alteration

    DOB lists a first permit date for B01103661-I1. That is not by itself confirmation of activity on site.

    056
  57. Alteration signed off

    DOB recorded a sign-off for B00535569-I1.

    057
  58. Alteration now completed

    The latest status recorded for B00535569-I1 is “LOC Issued.”

    058
  59. Alteration filed

    Facade Repair. Filing B00535569-P3.

    059
  60. Alteration approved

    Filing B00535569-P3 reached an approved status.

    060
  61. Alteration now approved

    The latest status recorded for B00535569-P3 is “Approved.”

    061
  62. Alteration filed

    General Construction consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-P1.

    062
  63. Alteration filed

    Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-P2.

    063
  64. Alteration now approved

    The latest status recorded for B01231458-I1 is “Permit Entire.”

    064
  65. Alteration approved

    Filing B01231458-P1 reached an approved status.

    065
  66. Alteration now approved

    The latest status recorded for B01231458-P1 is “Approved.”

    066
  67. Alteration signed off

    DOB recorded a sign-off for B01079298-I1.

    067
  68. Alteration now completed

    The latest status recorded for B01079298-I1 is “LOC Issued.”

    068
  69. Alteration approved

    Filing B01231458-P2 reached an approved status.

    069
  70. Alteration now approved

    The latest status recorded for B01231458-P2 is “Approved.”

    070
  71. Alteration now approved

    The latest status recorded for B01231458-S1 is “Permit Entire.”

    071
  72. Alteration signed off

    DOB recorded a sign-off for B01103661-I1.

    072
  73. Alteration now completed

    The latest status recorded for B01103661-I1 is “LOC Issued.”

    073
  74. Alteration filed

    Mechanical ventilation as per plans filed herewith. No change to use, egress or occupancy. Filing B01231458-P3.

    074
  75. Alteration now under review

    The latest status recorded for B01231458-P3 is “Plan Examiner Review.”

    075