Building record · BIN 3024793

115 8 Avenue

115 8 Avenue, Brooklyn, NY 11215

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3024793

115 8 Avenue

Park Slope, Brooklyn

A consolidated public-record view · updated Jul 6, 2022

DOB filings
4
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records1
First included filingJul 23, 2019
Latest recorded changeJul 6, 2022

The lot

What is already here?

The lot holds a 3.5-story walk-up apartment building built in 1888, with 12 homes, on a 2,520 sq ft lot.

Built
1888
Floors
3.5
Residential units
12
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7B
Lot area
2,520 sq ft
Building area
5,780 sq ft
Historic district
Park Slope Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3024793. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 3 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jul 23, 2019
Latest recorded change
Jul 6, 2022
Highest proposed story count
Not stated
Highest proposed unit count
12 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 115 8 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of temporary heavy duty sidewalk shed and 52' high pipe scaffold originating (off shed) for facade repair work as per plan. no changein use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00198016-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00198016-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Associated capping of existing ventilation ductwork and placement of new ventilation ductwork in relation to relocation of existing bathroom. Refer to related architectural application for more information. Filing B00215888-I1.

    03
  4. Alteration filed

    Relocation of existing bathroom and replacement of existing fixtures & finishes to second bathroom in relation to combination of apartments 1 & 2. Refer to related architectural application for more information. Filing B00214209-I1.

    04
  5. Alteration approved

    Filing B00214209-I1 reached an approved status.

    05
  6. Alteration approved

    Filing B00215888-I1 reached an approved status.

    06
  7. Alteration signed off

    DOB recorded a sign-off for B00198016-I1.

    07
  8. Alteration now completed

    The latest status recorded for B00198016-I1 is “LOC Issued.”

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00215888-I1. That is not by itself confirmation of activity on site.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00214209-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Relocation of existing bathroom and replacement of existing fixtures & finishes to second bathroom in relation to combination of apartments 1 & 2. Refer to related architectural application for more information. Filing B00214209-P2.

    011
  12. Alteration approved

    Filing B00214209-P2 reached an approved status.

    012
  13. Alteration now approved

    The latest status recorded for B00214209-P2 is “Approved.”

    013
  14. Alteration signed off

    DOB recorded a sign-off for B00214209-I1.

    014
  15. Alteration now completed

    The latest status recorded for B00214209-I1 is “LOC Issued.”

    015
  16. Alteration signed off

    DOB recorded a sign-off for B00215888-I1.

    016
  17. Alteration now completed

    The latest status recorded for B00215888-I1 is “LOC Issued.”

    017