Building record · BIN 3027889

601 Bergen Street

601 Bergen Street, Brooklyn, NY 11238

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3027889

601 Bergen Street

Prospect Heights, Brooklyn

A consolidated public-record view · updated Nov 15, 2024

DOB filings
11
Active-status
4
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings11
Open or active-status records4
First included filingAug 12, 2021
Latest recorded changeNov 15, 2024

The lot

What is already here?

The lot holds a 1-story office building built in 1950, on a 2,219 sq ft lot.

  1. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 5 — the tallest thing within 60 m to the south is 14.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 6.7 m over 1 floor, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1950
Floors
1
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
M1-1
Lot area
2,219 sq ft
Building area
2,231 sq ft

What it sold for

2 apartments on this tax block changed hands in the year the city last published, at a median of $1,812,500.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3027889. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 11 alteration filing. Its latest status categories are 7 recorded as completed, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 12, 2021
Latest recorded change
Nov 15, 2024
Highest proposed story count
1 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 601 Bergen Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Plumbing work filed in conjuction with building conversion from manufacturing to office. install all new plumbing fixtures and related piping. filed in conjunction with alt-co job b00515668. Filing B00515842-I1.

    01
  2. Alteration approved

    Filing B00515842-I1 reached an approved status.

    02
  3. Alteration filed

    Mechanical work filed in conjunction with building renovation and conversion to offices. install new split ac system, toilet exhaust, radiant floor heating system and related components. filed in conjunction with alt-co job b00515668. Filing B00515821-I1.

    03
  4. Alteration approved

    Filing B00515821-I1 reached an approved status.

    04
  5. Alteration filed

    Modification of sprinkler system in conjunction with building renovation and conversion from manufacturing to offices. sprinkler new cellar and mezzanine. filed in conjunction with alt-co job b00515668. Filing B00515853-I1.

    05
  6. Alteration approved

    Filing B00515853-I1 reached an approved status.

    06
  7. Alteration filed

    Install new gas boiler in conjunction with building conversion to office. Filing B00575049-I1.

    07
  8. Alteration filed

    Temporary construction fence in conjunction with building renovation and construction of new partial cellar and mezzanine. filed in conjunction with alt-co job b00515668-i1. Filing B00551813-I1.

    08
  9. Alteration approved

    Filing B00551813-I1 reached an approved status.

    09
  10. Alteration approved

    Filing B00575049-I1 reached an approved status.

    010
  11. Alteration filed

    STRUCTURAL AND FOUNDATION WORK IN CONJUCTION WITH RENOVATION OF EXISTING BUILDING. EXCAVATE FOR NEW PARTIAL CELLAR. FRAMING FOR NEW 1st FLOOR MEZZANINE. FILED IN CONJUNCTION WITH ALT-CO JOB B00515668. Filing B00551806-I1.

    011
  12. Alteration filed

    Soe and excavation design only for proposed foundation system in conjunction with renovation of existing building filed under alt/co job # b00515668. all structural, foundation, and underpinning is filed and approved separately under DOB #b00551806-i1. Filing B00596257-I1.

    012
  13. Alteration approved

    Filing B00551806-I1 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00551813-I1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00551806-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration approved

    Filing B00596257-I1 reached an approved status.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for B00596257-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    STRUCTURAL AND FOUNDATION WORK IN CONJUCTION WITH RENOVATION OF EXISTING BUILDING. EXCAVATE FOR NEW PARTIAL CELLAR. FRAMING FOR NEW 1st FLOOR MEZZANINE. FILED IN CONJUNCTION WITH ALT-CO JOB B00515668. Filing B00551806-P1.

    018
  19. Alteration filed

    Soe and excavation design only for proposed foundation system in conjunction with renovation of existing building filed under alt/co job # b00515668. all structural, foundation, and underpinning is filed and approved separately under DOB #b00551806-i1. Filing B00596257-P1.

    019
  20. Alteration approved

    Filing B00596257-P1 reached an approved status.

    020
  21. Alteration now approved

    The latest status recorded for B00596257-P1 is “Approved.”

    021
  22. Alteration approved

    Filing B00551806-P1 reached an approved status.

    022
  23. Alteration now approved

    The latest status recorded for B00551806-P1 is “Approved.”

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B00515821-I1. That is not by itself confirmation of activity on site.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for B00515842-I1. That is not by itself confirmation of activity on site.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B00515853-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration filed

    Modification of sprinkler system in conjunction with building renovation and conversion from manufacturing to offices. sprinkler new cellar and mezzanine. filed in conjunction with alt-co job b00515668. Filing B00515853-P1.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for B00575049-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration signed off

    DOB recorded a sign-off for B00551813-I1.

    029
  30. Alteration now completed

    The latest status recorded for B00551813-I1 is “LOC Issued.”

    030
  31. Alteration signed off

    DOB recorded a sign-off for B00596257-I1.

    031
  32. Alteration now completed

    The latest status recorded for B00596257-I1 is “LOC Issued.”

    032
  33. Alteration filed

    STRUCTURAL AND FOUNDATION WORK IN CONJUCTION WITH RENOVATION OF EXISTING BUILDING. EXCAVATE FOR NEW PARTIAL CELLAR. FRAMING FOR NEW 1st FLOOR MEZZANINE. FILED IN CONJUNCTION WITH ALT-CO JOB B00515668. Filing B00551806-P2.

    033
  34. Alteration approved

    Filing B00551806-P2 reached an approved status.

    034
  35. Alteration now approved

    The latest status recorded for B00551806-P2 is “Approved.”

    035
  36. Alteration approved

    Filing B00515853-P1 reached an approved status.

    036
  37. Alteration now approved

    The latest status recorded for B00515853-P1 is “Approved.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for B00575049-I1.

    038
  39. Alteration now completed

    The latest status recorded for B00575049-I1 is “LOC Issued.”

    039
  40. Alteration signed off

    DOB recorded a sign-off for B00551806-I1.

    040
  41. Alteration now completed

    The latest status recorded for B00551806-I1 is “LOC Issued.”

    041
  42. Alteration signed off

    DOB recorded a sign-off for B00515853-I1.

    042
  43. Alteration now completed

    The latest status recorded for B00515853-I1 is “LOC Issued.”

    043
  44. Alteration signed off

    DOB recorded a sign-off for B00515821-I1.

    044
  45. Alteration now completed

    The latest status recorded for B00515821-I1 is “LOC Issued.”

    045
  46. Alteration signed off

    DOB recorded a sign-off for B00515842-I1.

    046
  47. Alteration now completed

    The latest status recorded for B00515842-I1 is “LOC Issued.”

    047