DOB filing B00299105-I1
Alteration filing at 824 Classon Avenue
Building record · BIN 3029557
824 Classon Avenue, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3029557
824 Classon Avenue
Prospect Heights, Brooklyn
A consolidated public-record view · updated Jan 26, 2023
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story walk-up apartment building built in 1920, with 10 homes, on a 2,500 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3029557. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 9 alteration filing. Its latest status categories are 5 recorded as completed, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 824 Classon Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00292945-I1.
DOB lists a first permit date for B00292945-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00292959-I1.
DOB lists a first permit date for B00292959-I1. That is not by itself confirmation of activity on site.
Sprinkler specifications filed in conjunction with alt1 # 320889990. Filing B00299074-I1.
Plumbing specifications filed in conjunction with alt 320889990. Filing B00299088-I1.
Mechanical specification filed in conjunction with alt1 #320889990. new split system for heating and cooling & new ventilation systems for 5th and 6th fl. Filing B00299105-I1.
Filing B00299088-I1 reached an approved status.
Filing B00299105-I1 reached an approved status.
Filing B00299074-I1 reached an approved status.
DOB lists a first permit date for B00299105-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00299088-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00299074-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00292945-I1.
The latest status recorded for B00292945-I1 is “LOC Issued.”
DOB recorded a sign-off for B00292959-I1.
The latest status recorded for B00292959-I1 is “LOC Issued.”
Sprinkler specifications filed in conjunction with alt1 # 320889990. Filing B00299074-P1.
Sprinkler specifications filed in conjunction with alt1 # 320889990. Filing B00299074-P2.
Filing B00299074-P1 reached an approved status.
The latest status recorded for B00299074-P1 is “Approved.”
Filing B00299074-P2 reached an approved status.
The latest status recorded for B00299074-P2 is “Approved.”
Plumbing specifications filed in conjunction with alt 320889990. Filing B00299088-P2.
Filing B00299088-P2 reached an approved status.
The latest status recorded for B00299088-P2 is “Approved.”
DOB recorded a sign-off for B00299074-I1.
The latest status recorded for B00299074-I1 is “LOC Issued.”
DOB recorded a sign-off for B00299088-I1.
The latest status recorded for B00299088-I1 is “LOC Issued.”
Mechanical specification filed in conjunction with alt1 #320889990. new split system for heating and cooling & new ventilation systems for 5th and 6th fl. Filing B00299105-P1.
Filing B00299105-P1 reached an approved status.
The latest status recorded for B00299105-P1 is “Approved.”
DOB recorded a sign-off for B00299105-I1.
The latest status recorded for B00299105-I1 is “LOC Issued.”