DOB filing B01159199-I1
Alteration filing at 225 Eastern Parkway
Building record · BIN 3029651
225 Eastern Parkway, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3029651
225 Eastern Parkway
Crown Heights (North), Brooklyn
A consolidated public-record view · updated Sep 23, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story condominium built in 2006, with 56 homes, on a 24,000 sq ft lot.
Housing violations
15 violations are open against this address under the Housing Maintenance Code. 9 of them are the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
The apartments
292 condominium apartments are assessed on this block, and the typical one is 1,255 sq ft (117 m²). They run from 51 to 190 m².
The city values the typical one at $168,533. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
2 apartments on this tax block changed hands in the year the city last published, at a median of $1,425,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
HV 263 EP LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
2 homes at this address are currently listed for sale by Coldwell Banker and Corcoran. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.
| Unit | Rooms | Size | Price | Per sq ft | Listed by |
|---|---|---|---|---|---|
| Unit 5FFor sale | Price not read | Coldwell Banker | |||
| Unit 5FFor sale | Price not read | Corcoran |
Read from the brokerages’ own published listings on October 7, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.
Violation record
The Department of Buildings has 10 open notices on record for this building, out of 56 notices on file; the most recent was issued Jun 20, 2023.
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Issued Dec 29, 2017
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3029651. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 9 alteration filing. Its latest status categories are 4 recorded as completed, 5 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 225 Eastern Parkway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Temporary placement of tubular steel scaffold structure as shown on plans. installation shall comply with bsa-362-44-sm, ll-33/91 and chapter 33 of 2014 bc. no change in egress, occupancy or use associated with this permit. Filing B00041811-I1.
DOB lists a first permit date for B00041811-I1. That is not by itself confirmation of activity on site.
Hereby filing for the removal, replacement, relocation and installation of plumbing fixtures in conjunction with renovation of apartment 6c located on the 6th floor. no change to use occupancy or egress. Filing B00251441-I1.
DOB lists a first permit date for B00251441-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00041811-I1 is “Permit Entire.”
DOB recorded a sign-off for B00251441-I1.
The latest status recorded for B00251441-I1 is “LOC Issued.”
Removing toilet partition wall/closet wall/ bedroom wall, adding kitchen counter top, replaced toilet floor and wall tiles as per indicated on plan for apt # 4c ( 4th floor ). there will be no change in the use, egress, or occupancy. Filing B00597330-I1.
Filing B00597330-I1 reached an approved status.
DOB lists a first permit date for B00597330-I1. That is not by itself confirmation of activity on site.
Existing bathroom fixtures will be changed and add one new bath tub at existing bathroom in 225 eastern parkway, brooklyn , apt # 4c, 4th floor. there will be no change in the use, egress, or occupancy. Filing B00614275-I1.
Filing B00614275-I1 reached an approved status.
DOB lists a first permit date for B00614275-I1. That is not by itself confirmation of activity on site.
Removing toilet partition wall/closet wall/ bedroom wall, adding kitchen counter top, replaced toilet floor and wall tiles as per indicated on plan for apt # 4c ( 4th floor ). there will be no change in the use, egress, or occupancy. Filing B00597330-P1.
Filing B00597330-P1 reached an approved status.
The latest status recorded for B00597330-P1 is “Approved.”
Removing toilet partition wall/closet wall/ bedroom wall, adding kitchen counter top, replaced toilet floor and wall tiles as per indicated on plan for apt # 4c ( 4th floor ). there will be no change in the use, egress, or occupancy. Filing B00597330-P2.
Filing B00597330-P2 reached an approved status.
The latest status recorded for B00597330-P2 is “Approved.”
Existing bathroom fixtures will be changed and add one new bath tub at existing bathroom in 225 eastern parkway, brooklyn , apt # 4c, 4th floor. there will be no change in the use, egress, or occupancy. Filing B00614275-P1.
Filing B00614275-P1 reached an approved status.
The latest status recorded for B00614275-P1 is “Approved.”
DOB recorded a sign-off for B00597330-I1.
The latest status recorded for B00597330-I1 is “LOC Issued.”
DOB recorded a sign-off for B00614275-I1.
The latest status recorded for B00614275-I1 is “LOC Issued.”
Demolition and installation of interior partitions to eliminate, create and re arrange closets. Filing B01159199-I1.
Replacing 2 shower, 1 lavatory, 1 sink and 1 dishwasher with new on existing location. Filing B01159199-S1.
Filing B01159199-I1 reached an approved status.
Filing B01159199-S1 reached an approved status.
DOB lists a first permit date for B01159199-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01159199-S1. That is not by itself confirmation of activity on site.
The latest status recorded for B01159199-S1 is “Permit Entire.”
DOB recorded a sign-off for B01159199-I1.
The latest status recorded for B01159199-I1 is “LOC Issued.”