DOB filing B00480418-I1
Alteration filing at 1180 President Street
Building record · BIN 3033530
1180 President Street, Brooklyn, NY 11225
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3033530
1180 President Street
Crown Heights (South), Brooklyn
A consolidated public-record view · updated May 27, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 4-story walk-up apartment building built in 1915, with 19 homes, on a 6,387 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 9 open notices on record for this building, out of 29 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
6 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3033530. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 17 alteration filing. Its latest status categories are 4 recorded as completed, 13 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1180 President Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Renovation of building for rearrange partition walls, remove oil tank, replacement of windows & door, new roof membrane, and interior finishes as per plans. See comment#24. Filing B00480418-I1.
Install new hot water boiler and remove existing oil tank. Filing B00480418-S2.
New plumbing roughing work is to be done throughout the building (floors 1-4), excluding occupied units 8, 9 & 11".install a new direct water heater with an expansion tank and new gas service. Filing B00480418-S3.
Install new CPVC Flue at boiler room. Filing B00480418-S1.
Filing B00480418-S2 reached an approved status.
Filing B00480418-S1 reached an approved status.
Filing B00480418-I1 reached an approved status.
Filing B00480418-S3 reached an approved status.
DOB lists a first permit date for B00480418-I1. That is not by itself confirmation of activity on site.
Install new direct water heater with expansion tank; new gas service. Filing B00480418-P1.
Filing B00480418-P1 reached an approved status.
The latest status recorded for B00480418-P1 is “Approved.”
Renovation of building for rearrange partition walls, remove oil tank, replacement of windows & door, new roof membrane, and interior finishes as per plans. See comment#24. Filing B00480418-P2.
Install new direct water heater with expansion tank; new gas service. See comment#24. Filing B00480418-P3.
Filing B00480418-P2 reached an approved status.
The latest status recorded for B00480418-P2 is “Approved.”
Filing B00480418-P3 reached an approved status.
The latest status recorded for B00480418-P3 is “Approved.”
Renovation of building for rearrange partition walls, remove oil tank, replacement of windows & door, new roof membrane, and interior finishes as per plans. See comment#24. Filing B00480418-P4.
Filing B00480418-P4 reached an approved status.
The latest status recorded for B00480418-P4 is “Approved.”
Renovation of building for rearrange partition walls, remove oil tank, replacement of windows & door, new roof membrane, and interior finishes as per plans. See comment#24. Filing B00480418-P6.
Install new hot water boiler and remove existing oil tank. Filing B00480418-P8.
Install new CPVC Flue at boiler room. Filing B00480418-P7.
Install new direct water heater with expansion tank; new gas service. See comment#24. Filing B00480418-P5.
Filing B00480418-P5 reached an approved status.
The latest status recorded for B00480418-P5 is “Approved.”
Filing B00480418-P7 reached an approved status.
The latest status recorded for B00480418-P7 is “Approved.”
Filing B00480418-P8 reached an approved status.
The latest status recorded for B00480418-P8 is “Approved.”
Filing B00480418-P6 reached an approved status.
The latest status recorded for B00480418-P6 is “Approved.”
DOB lists a first permit date for B00480418-S3. That is not by itself confirmation of activity on site.
New plumbing roughing work is to be done throughout the building (floors 1-4), excluding occupied units 8, 9 & 11".install a new direct water heater with an expansion tank and new gas service. Filing B00480418-P9.
Filing B00480418-P9 reached an approved status.
The latest status recorded for B00480418-P9 is “Approved.”
Install new hot water boiler and remove existing oil tank. Filing B00480418-A1.
Filing B00480418-A1 reached an approved status.
The latest status recorded for B00480418-A1 is “Approved.”
DOB lists a first permit date for B00480418-S2. That is not by itself confirmation of activity on site.
Install new hot water boiler and remove existing oil tank. Filing B00480418-A2.
Filing B00480418-A2 reached an approved status.
The latest status recorded for B00480418-A2 is “Approved.”
New plumbing roughing work is to be done throughout the building (floors 1-4), excluding occupied units 8, 9 & 11".install a new direct water heater with an expansion tank and new gas service. Filing B00480418-A3.
Filing B00480418-A3 reached an approved status.
The latest status recorded for B00480418-A3 is “Approved.”
Renovation of building for rearrange partition walls, remove oil tank, replacement of windows & door, new roof membrane, and interior finishes as per plans. See comment#24. Filing B00480418-A4.
Filing B00480418-A4 reached an approved status.
The latest status recorded for B00480418-A4 is “Approved.”
DOB lists a first permit date for B00480418-S1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00480418-S1.
The latest status recorded for B00480418-S1 is “LOC Issued.”
DOB recorded a sign-off for B00480418-S3.
The latest status recorded for B00480418-S3 is “LOC Issued.”
DOB recorded a sign-off for B00480418-S2.
The latest status recorded for B00480418-S2 is “LOC Issued.”
DOB recorded a sign-off for B00480418-I1.
The latest status recorded for B00480418-I1 is “LOC Issued.”