DOB filing B01408705-S4
Alteration filing at 421 Hart Street
Building record · BIN 3043058
421 Hart Street, Brooklyn, NY 11221
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3043058
421 Hart Street
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Sep 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story two-family home built in 1899, on a 2,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 8 open notices on record for this building, out of 10 notices on file; the most recent was issued Apr 13, 2022.
Issued Apr 13, 2022 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Issued Nov 14, 2019
Issued Nov 14, 2019
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3043058. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 5 alteration filing. Its latest status categories are 1 under review, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 421 Hart Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. Filing B00124225-I1.
DOB lists a first permit date for B00124225-I1. That is not by itself confirmation of activity on site.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00247221-I1.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00247229-I1.
Filing B00247221-I1 reached an approved status.
Filing B00247229-I1 reached an approved status.
The latest status recorded for B00247221-I1 is “Approved.”
The latest status recorded for B00247229-I1 is “Approved.”
The latest status recorded for B00124225-I1 is “Permit Entire.”
Support of Excavation in conjunction with the ALT-I application in BIS 321253558-06. Filing B01408705-I1.
Foundation \ Earthwork in conjunction with the ALT-I application filed in BIS 321253558. Filing B01408705-S4.
Filing B01408705-I1 reached an approved status.
The latest status recorded for B01408705-I1 is “Approved.”
The latest status recorded for B01408705-S4 is “Objections.”