Building record · BIN 3044163

811 Lexington Avenue

811 Lexington Avenue, Brooklyn, NY 11221

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 15 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3044163

811 Lexington Avenue

Bedford-Stuyvesant (East), Brooklyn

A consolidated public-record view · updated Jan 21, 2025

DOB filings
15
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings15
Open or active-status records8
First included filingNov 5, 2019
Latest recorded changeJan 21, 2025

The lot

What is already here?

  1. Floors 2–6Nothing on record
  2. Floor 1Street levelStreet level.
  • Street levelThe way in
  • Above the southern skylineFrom about floor 8 — the tallest thing within 60 m to the south is 22.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 19.2 m over about 6 floors, counted at three metres each because the city publishes the height and not the number. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.

The apartments

20 condominium apartments are assessed on this block, and the typical one is 629 sq ft (58 m²). They run from 58 to 107 m².

The city values the typical one at $263,925. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

Owner of record

QB & SON LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 42 notices on file; the most recent was issued Jan 13, 1997.

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3044163. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 15 alteration filing. Its latest status categories are 7 recorded as completed, 8 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 5, 2019
Latest recorded change
Jan 21, 2025
Highest proposed story count
4 stories
Highest proposed unit count
64 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 811 Lexington Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 15 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Propose mechanical work filed in conjunction with nb # 321385023. Filing B00242198-I1.

    01
  2. Alteration filed

    This application is filed only for structural scope / review in conjunction with NB # 321385023. Filing B00243818-I1.

    02
  3. Alteration approved

    Filing B00243818-I1 reached an approved status.

    03
  4. Alteration filed

    Propose plumbing, sprinkler, standpipe scope of work filed in conjunction with nb #321385023. Filing B00239365-I1.

    04
  5. Alteration filed

    Propose new curb cut in conjunction with nb #321385023. Filing B00293189-I1.

    05
  6. Alteration approved

    Filing B00293189-I1 reached an approved status.

    06
  7. Alteration approved

    Filing B00242198-I1 reached an approved status.

    07
  8. Alteration filed

    Propose to install 2 laars hot water boilers, associated vents and combustion air intake ducts, controls, gas piping to boiler,vibration isolators. Filing B00330784-I1.

    08
  9. Alteration approved

    Filing B00330784-I1 reached an approved status.

    09
  10. Alteration approved

    Filing B00239365-I1 reached an approved status.

    010
  11. Alteration filed

    Installation of construction fence to protect site, during full demolition of structure. Filing B00385040-I1.

    011
  12. Alteration approved

    Filing B00385040-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B00385040-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00544516-I1.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00544516-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Installation and use of temporary construction fence as per plans filed herewith. This application is filed in conjunction with NB-321385023. Filing B00577914-I1.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for B00577914-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration signed off

    DOB recorded a sign-off for B00544516-I1.

    018
  19. Alteration now completed

    The latest status recorded for B00544516-I1 is “LOC Issued.”

    019
  20. Alteration filed

    SOE work as per plans filed. This application is filed in conjunction with NB BIS #321385023. Filing B00593500-I1.

    020
  21. Alteration approved

    Filing B00593500-I1 reached an approved status.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for B00593500-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration signed off

    DOB recorded a sign-off for B00385040-I1.

    023
  24. Alteration now completed

    The latest status recorded for B00385040-I1 is “LOC Issued.”

    024
  25. Alteration filed

    This application is filed only for structural scope / review in conjunction with NB # 321385023. Filing B00243818-P1.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B00239365-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration approved

    Filing B00243818-P1 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for B00243818-P1 is “Approved.”

    028
  29. Alteration filed

    Propose plumbing, sprinkler, standpipe scope of work filed in conjunction with nb #321385023. Filing B00239365-P2.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for B00330784-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Propose to install 2 laars hot water boilers, associated vents and combustion air intake ducts, controls, gas piping to boiler,vibration isolators. Filing B00330784-P1.

    031
  32. Alteration approved

    Filing B00239365-P2 reached an approved status.

    032
  33. Alteration now approved

    The latest status recorded for B00239365-P2 is “Approved.”

    033
  34. Alteration approved

    Filing B00330784-P1 reached an approved status.

    034
  35. Alteration now approved

    The latest status recorded for B00330784-P1 is “Approved.”

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for B00242198-I1. That is not by itself confirmation of activity on site.

    036
  37. Alteration signed off

    DOB recorded a sign-off for B00577914-I1.

    037
  38. Alteration now completed

    The latest status recorded for B00577914-I1 is “LOC Issued.”

    038
  39. Alteration signed off

    DOB recorded a sign-off for B00593500-I1.

    039
  40. Alteration now completed

    The latest status recorded for B00593500-I1 is “LOC Issued.”

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for B00243818-I1. That is not by itself confirmation of activity on site.

    041
  42. Alteration signed off

    DOB recorded a sign-off for B00330784-I1.

    042
  43. Alteration now completed

    The latest status recorded for B00330784-I1 is “LOC Issued.”

    043
  44. Permit recorded for alteration

    DOB lists a first permit date for B00293189-I1. That is not by itself confirmation of activity on site.

    044
  45. Alteration now approved

    The latest status recorded for B00293189-I1 is “Permit Entire.”

    045
  46. Alteration filed

    Propose mechanical work filed in conjunction with nb # 321385023. Filing B00242198-P1.

    046
  47. Alteration now approved

    The latest status recorded for B00242198-I1 is “Permit Entire.”

    047
  48. Alteration approved

    Filing B00242198-P1 reached an approved status.

    048
  49. Alteration now approved

    The latest status recorded for B00242198-P1 is “Approved.”

    049
  50. Alteration signed off

    DOB recorded a sign-off for B00243818-I1.

    050
  51. Alteration now completed

    The latest status recorded for B00243818-I1 is “LOC Issued.”

    051
  52. Alteration filed

    Propose plumbing, sprinkler, standpipe scope of work filed in conjunction with nb #321385023. Filing B00239365-P3.

    052
  53. Alteration approved

    Filing B00239365-P3 reached an approved status.

    053
  54. Alteration now approved

    The latest status recorded for B00239365-P3 is “Approved.”

    054
  55. Alteration filed

    Propose plumbing, sprinkler, standpipe scope of work filed in conjunction with nb #321385023. Filing B00239365-P4.

    055
  56. Alteration approved

    Filing B00239365-P4 reached an approved status.

    056
  57. Alteration now approved

    The latest status recorded for B00239365-P4 is “Approved.”

    057
  58. Alteration signed off

    DOB recorded a sign-off for B00239365-I1.

    058
  59. Alteration now completed

    The latest status recorded for B00239365-I1 is “LOC Issued.”

    059