DOB filing B01480591-I1
Alteration filing at 800 Gates Avenue
Building record · BIN 3044657
800 Gates Avenue, Brooklyn, NY 11221
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3044657
800 Gates Avenue
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Nov 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story educational building built in 1974, on a 95,000 sq ft lot.
Owner of record
DEPARTMENT OF EDUCATION
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 42 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3044657. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 14 alteration filing. Its latest status categories are 7 under review, 6 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 800 Gates Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Minor interior renovation to install new split air conditioning system in 4th floor classrooms. there is no change to the use, occupancy or egress. Filing B00187782-I1.
Filing B00187782-I1 reached an approved status.
DOB lists a first permit date for B00187782-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00187782-I1.
The latest status recorded for B00187782-I1 is “LOC Issued.”
Provide Air Conditioning and Lighting for new Science Rooms. Filing B00803338-I1.
Provide waste, hot & cold water piping and acid waste piping to classroom new sinks and existing eye wash stations. Remove gas lines from classroom and cap at basement level. Filing B00803338-S2.
General Demolition and construction related to the renovation of 2 Science Rooms. Filing B00803338-S1.
Filing B00803338-S2 reached an approved status.
Filing B00803338-S1 reached an approved status.
Filing B00803338-I1 reached an approved status.
Remove and install new walk-in freezer. Run piping through 2nd, 3rd and 4th floor to roof. Install condensing unit on roof for walk-in freezer. Filing B00992916-I1.
Remove and install new walk-in frezer. Construct gyp. bd chase on 2nd, 3rd, and 4th floor. Install new condenser unit on roof. Filing B00992916-S1.
DOB lists a first permit date for B00803338-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00803338-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00803338-I1. That is not by itself confirmation of activity on site.
Filing B00992916-I1 reached an approved status.
Filing B00992916-S1 reached an approved status.
DOB lists a first permit date for B00992916-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00992916-S1. That is not by itself confirmation of activity on site.
Remove and install partitions, doors and frames, ceilings, flooring and furniture and finishes. Filing B00802438-P6.
Remove and install new walk-in freezer. Run piping through 2nd, 3rd and 4th floor to roof. Install condensing unit on roof for walk-in freezer. Filing B00992916-P2.
Filing B00992916-P2 reached an approved status.
The latest status recorded for B00992916-P2 is “Approved.”
The latest status recorded for B00802438-P6 is “Objections.”
The latest status recorded for B00992916-S1 is “Permit Entire.”
The latest status recorded for B00992916-I1 is “Permit Entire.”
K324 Path of Travel related to CTF Room Conversion - Convert Classroom 206 into a Culinary Classroom #206. Related DoB JoB #B01359212. Filing B01480591-I1.
Provide new drinking fountain & associated piping. Filing B01480591-S1.
K267_ CTF Room Conversion - Convert Classroom 206 into a Culinary Classroom #206. Filing B01359212-S3.
Provide new dishwasher, washer, ice maker, sinks, floor drain and associated hot & cold water piping, fittings, traps & sanitary piping. Connect new piping to existing hot, cold & sanitary mains. Filing B01359212-S2.
Provide new make up air unit, duct heater, and associated ductwork. Provide new kitchen hoods and associated exhaust fans & ductwork. Provide new lighting fixtures and associated lighting controls. Filing B01359212-S1.
K267_ CTF Room Conversion - Convert Classroom 206 into a Culinary Classroom #206. Filing B01359212-I1.
The latest status recorded for B00803338-S2 is “Permit Entire.”
The latest status recorded for B00803338-S1 is “Permit Entire.”
The latest status recorded for B00803338-I1 is “Permit Entire.”
The latest status recorded for B01480591-S1 is “Objections.”
The latest status recorded for B01359212-S1 is “Objections.”
The latest status recorded for B01359212-I1 is “Objections.”
The latest status recorded for B01359212-S3 is “Objections.”
The latest status recorded for B01359212-S2 is “Objections.”
The latest status recorded for B01480591-I1 is “Plan Examiner Review.”