DOB filing B01436699-I1
Alteration filing at 180 Chauncey Street
Building record · BIN 3047914
180 Chauncey Street, Brooklyn, NY 11233
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3047914
180 Chauncey Street
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story educational building built in 1955, on a 110,000 sq ft lot.
Owner of record
NYC PARKS DEPT
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 4 open notices on record for this building, out of 60 notices on file; the most recent was issued Apr 28, 1999.
Issued Apr 28, 1999
Issued Jan 13, 1997
Issued Aug 16, 1993
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3047914. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 16 alteration filing. Its latest status categories are 15 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 180 Chauncey Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Renovation of school to add various ADA accessibility upgrades throughout building. Installation of new elevator and shaft. Filing B00568919-I1.
Remove and replace bathroom fixtures for renovation of ADA compliance. Install new sump pump in elevator pit. Filing B00568919-S3.
Mechanical, Ventilation, and related duct piping.,. Filing B00568919-S2.
Installation of ramp and elevator shaft to comply with ADA accessibility. Filing B00568919-S1.
Site Civil Work - Remove and replace asphalt and landscaping as per plans. Filing B00568919-S4.
New footings grade beams and slab, concrete stairs and ramp, elevator pit for addition. Filing B00568919-S6.
Ot-electrical energy code as shown on plans. Filing B00568919-S5.
Installation of Gas Vapor Barrier. Filing B00568919-S8.
Filing B00568919-S3 reached an approved status.
Filing B00568919-S5 reached an approved status.
Filing B00568919-I1 reached an approved status.
Filing B00568919-S1 reached an approved status.
Filing B00568919-S2 reached an approved status.
Filing B00568919-S6 reached an approved status.
Filing B00568919-S8 reached an approved status.
Filing B00568919-S4 reached an approved status.
Sf/ps21k - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to job b00568919. no change in use, occupancy or egress. Filing B00894408-I1.
Filing B00894408-I1 reached an approved status.
DOB lists a first permit date for B00894408-I1. That is not by itself confirmation of activity on site.
Renovation of school to add various ADA accessibility upgrades throughout building. Installation of new elevator and shaft. Filing B00568919-P1.
Filing B00568919-P1 reached an approved status.
The latest status recorded for B00568919-P1 is “Approved.”
New footings grade beams and slab, concrete stairs and ramp, elevator pit for addition. Filing B00568919-P5.
Mechanical, Ventilation, and related duct piping.,. Filing B00568919-P2.
Filing B00568919-P2 reached an approved status.
The latest status recorded for B00568919-P2 is “Approved.”
Remove and replace bathroom fixtures for renovation of ADA compliance. Install new sump pump in elevator pit. Filing B00568919-P3.
Filing B00568919-P3 reached an approved status.
The latest status recorded for B00568919-P3 is “Approved.”
Ot-electrical energy code as shown on plans. Filing B00568919-P4.
Filing B00568919-P4 reached an approved status.
The latest status recorded for B00568919-P4 is “Approved.”
Filing B00568919-P5 reached an approved status.
The latest status recorded for B00568919-P5 is “Approved.”
DOB lists a first permit date for B00568919-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00568919-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00568919-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00568919-S8. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00568919-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00568919-S6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00568919-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00568919-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B00568919-S4 is “Permit Entire.”
The latest status recorded for B00568919-S8 is “Permit Entire.”
Remove and replace bathroom fixtures for renovation of ADA compliance. Install new sump pump in elevator pit. Filing B00568919-P6.
The latest status recorded for B00568919-I1 is “Permit Entire.”
The latest status recorded for B00568919-S1 is “Permit Entire.”
The latest status recorded for B00568919-S2 is “Permit Entire.”
The latest status recorded for B00568919-S6 is “Permit Entire.”
The latest status recorded for B00568919-S5 is “Permit Entire.”
Ch/ps21k - for temporary construction equipment(chute) submitting on behalf of contractor, related to job b01158259. no change in use, occupancy or egress. Filing B01436699-I1.
Filing B00568919-P6 reached an approved status.
The latest status recorded for B00568919-P6 is “Approved.”
The latest status recorded for B00568919-S3 is “Permit Entire.”
DOB recorded a sign-off for B00894408-I1.
The latest status recorded for B00894408-I1 is “LOC Issued.”
Filing B01436699-I1 reached an approved status.
The latest status recorded for B01436699-I1 is “Approved.”