DOB filing B01303167-S3
Alteration filing at 1545 Atlantic Avenue
Building record · BIN 3048072
1545 Atlantic Avenue, Brooklyn, NY 11213
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 79 independently sourced records, including 38 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3048072
1545 Atlantic Avenue
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Sep 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 9-story health facility built in 1928, on a 156,900 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 16 open notices on record for this building, out of 296 notices on file; the most recent was issued Sep 23, 2024.
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Issued Feb 7, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
13 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3048072. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 79 alteration filing. Its latest status categories are 2 under review, 36 approved, 41 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1545 Atlantic Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 79 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Remove existing fixtures in phases as indicated on floor plans. Remove piping in phases as indicated on floor plans. Removed existing fire mains and sprinkler in phases as indicated on fire protection floor plans. Work on the 7th & 8th floors per plans. Filing B00317739-I1.
Proposed removal of existing ductwork and associated elements.All as per plans filed herewith. Filing B00317679-I1.
Filing B00317679-I1 reached an approved status.
Plumbing and sprinkler modifications to accommodate alterations to the central pharmacy with in the existing hospital building as indicated on plans filed herewith. Filing B00337834-I1.
Modification to HVAC equipment and ductwork to accommodate alterations to the central pharmacy within the existing hospital building. Filing B00337828-I1.
Filing B00317739-I1 reached an approved status.
Filing B00337834-I1 reached an approved status.
Filing B00337828-I1 reached an approved status.
DOB lists a first permit date for B00317679-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00337828-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00317739-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00337834-I1. That is not by itself confirmation of activity on site.
Modification to HVAC ductwork and piping to accommodate the medical/ surgical room alterations in the existing hospital building. Filing B00384673-I1.
Filing B00384673-I1 reached an approved status.
Plumbing and sprinkler modifications to accommodate the medical/ surgical room alterations in the existing hospital building. Filing B00384703-I1.
Proposed Mechanical work for Interior Renovation. No change to use, Egress, or Occupancy. All as per plans filed herewith. Filing B00359446-I1.
Proposed Plumbing & Sprinkler work for Interior Renovation. No change to use, Egress, or Occupancy. All as per Plans filed herewith. Filing B00359666-I1.
Filing B00359446-I1 reached an approved status.
Filing B00359666-I1 reached an approved status.
DOB lists a first permit date for B00384673-I1. That is not by itself confirmation of activity on site.
Installation of temporary fire sprinklers for partial 8th floor during construction phase. This application is in conjunction with the following DOB PW#'s: 340744886, B00359666 & TMFALM-002999. Filing B00401059-I1.
Filing B00384703-I1 reached an approved status.
Filing B00401059-I1 reached an approved status.
DOB lists a first permit date for B00401059-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00384703-I1. That is not by itself confirmation of activity on site.
Modifications of hvac equipment and ductwork to accommodate ac unit & cooling tower replacement as indicated on plans filed herewith. Filing B00418988-I1.
Filing B00418988-I1 reached an approved status.
DOB lists a first permit date for B00359446-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00359666-I1. That is not by itself confirmation of activity on site.
HVAC modificaitons to accommodate alaterations for the ees decant project. Filing B00422578-I1.
Plumbing modifications to accommodate the ees decant project. Filing B00422591-I1.
Filing B00422591-I1 reached an approved status.
Filing B00422578-I1 reached an approved status.
Modifications of hvac equipment and ductwork to accommodate ac unit & cooling tower replacement as indicated on plans filed herewith. Filing B00418988-P1.
Plumbing modifications to accommodate hvac upgrades. Filing B00419167-I1.
HVAC modification as indicated on plans filed herewith. Filing B00444064-I1.
Filing B00418988-P1 reached an approved status.
The latest status recorded for B00418988-P1 is “Approved.”
Filing B00419167-I1 reached an approved status.
The latest status recorded for B00419167-I1 is “Approved.”
Filing B00444064-I1 reached an approved status.
DOB received filing B00450157-I1.
Filing B00450157-I1 reached an approved status.
Selective roof removal and replacement at the IMC Chapel. Filing B00472643-I1.
Filing B00472643-I1 reached an approved status.
Installation of stair tower in compliance with chapter 33 of NYC building code. Filing B00471954-I1.
Installation of medium duty sidewalk shed in compliance with chapter 33 of NYC building code. Filing B00475093-I1.
DOB lists a first permit date for B00418988-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00444064-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00471954-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00475093-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00422591-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00486368-I1.
Filing B00486368-I1 reached an approved status.
DOB lists a first permit date for B00486368-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00450157-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00450157-I1 is “Permit Entire.”
Modification to interior partitions and finishes selective roof replacement and exterior work to accommodate alterations within the existing hospital building as indicated on plans filed herewith. Filing B00511316-I1.
Filing B00511316-I1 reached an approved status.
Plumbing and sprinkler modifications to accommodate the medical/ surgical room alterations in the existing hospital building. Filing B00384703-P1.
Modification to HVAC ductwork and piping to accommodate the medical/ surgical room alterations in the existing hospital building. Filing B00384673-P1.
DOB lists a first permit date for B00511316-I1. That is not by itself confirmation of activity on site.
Filing B00384673-P1 reached an approved status.
The latest status recorded for B00384673-P1 is “Approved.”
DOB lists a first permit date for B00472643-I1. That is not by itself confirmation of activity on site.
Filing B00384703-P1 reached an approved status.
The latest status recorded for B00384703-P1 is “Approved.”
Replacement of 4 units on the roof with a total capacity of 5 tons. no change to egress,use, or occupancy. Filing B00464668-I1.
Modifications of interior partitions to accommodate new electrical closets as indicated on plan filed herewith. Filing B00543254-I1.
DOB lists a first permit date for B00464668-I1. That is not by itself confirmation of activity on site.
Filing B00543254-I1 reached an approved status.
DOB lists a first permit date for B00543254-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00464668-I1.
The latest status recorded for B00464668-I1 is “LOC Issued.”
MODIFICATIONS OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS TO THE EXISTING DATA CENTER. ADDITIONALLY FILING TO OBTAIN EUP (coc) FOR EXISTING HVAC UNITS AT DATA CENTER. Filing B00558775-I1.
Filing B00558775-I1 reached an approved status.
DOB lists a first permit date for B00558775-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00317739-I1 is “Permit Issued.”
East bldg admin offices- modifications to the ductwork to accommodate alterations to the east bldg admin offices. Filing B00561272-I1.
Filing B00561272-I1 reached an approved status.
Plumbing and sprinkler modifications to accommodate alterations to the 4th fl east make ready project. Filing B00580931-I1.
Filing B00580931-I1 reached an approved status.
Removal of hvac equipment and ductwork to accommodate alterations to the 4th fl ease make ready project. Filing B00580933-I1.
Filing B00580933-I1 reached an approved status.
Modifications of interior partitions and finishes to accommodate alterations to the east bldg 1st fl admin offices. Filing B00561245-I1.
Filing B00561245-I1 reached an approved status.
EES RISER - partition modifications to accommodate ees riser project as per plans. Filing B00547140-I1.
Modifications of interior partitions and finishes to accommodate alterations for the md 4th floor make ready project as per plans. Filing B00578352-I1.
Filing B00547140-I1 reached an approved status.
Filing B00578352-I1 reached an approved status.
Proposed removal of existing ductwork and associated elements.All as per plans filed herewith. Filing B00317679-P1.
Remove existing fixtures in phases as indicated on floor plans. Remove piping in phases as indicated on floor plans. Removed existing fire mains and sprinkler in phases as indicated on fire protection floor plans. Work on the 7th & 8th floors per plans. Filing B00317739-P1.
DOB lists a first permit date for B00561245-I1. That is not by itself confirmation of activity on site.
Admin Office - Sprinkler & plumbing modifications to accommodate alterations to the admin office in the existing east bldg. Filing B00587278-I1.
Filing B00317679-P1 reached an approved status.
The latest status recorded for B00317679-P1 is “Approved.”
The latest status recorded for B00317739-P1 is “Objections.”
Filing B00587278-I1 reached an approved status.
DOB lists a first permit date for B00561272-I1. That is not by itself confirmation of activity on site.
HVAC modification as indicated on plans filed herewith. Filing B00444064-P1.
Filing B00444064-P1 reached an approved status.
The latest status recorded for B00444064-P1 is “Approved.”
Modification to HVAC equipment and ductwork to accommodate alterations to the central pharmacy within the existing hospital building. Filing B00337828-P1.
Imc peds/pulmonary office - modifications of interior partitions and finishes to accommodate alterations to the pediatric & pulmonary offices within the existing hospital building as per plans filed herewith. no change to use, egress or occupancy. Filing B00593772-I1.
Proposed Mechanical work for Interior Renovation. No change to use, Egress, or Occupancy. All as per plans filed herewith. Filing B00359446-P1.
Proposed Plumbing & Sprinkler work for Interior Renovation. No change to use, Egress, or Occupancy. All as per Plans filed herewith. Filing B00359666-P1.
Imc gift shop - modifications of interior partitions andfinishes to accommodate alterations to the gift shop in the exisitng hospital building as per plansfiled herewith. Filing B00593740-I1.
Filing B00337828-P1 reached an approved status.
The latest status recorded for B00337828-P1 is “Approved.”
Filing B00359446-P1 reached an approved status.
The latest status recorded for B00359446-P1 is “Approved.”
Filing B00359666-P1 reached an approved status.
The latest status recorded for B00359666-P1 is “Approved.”
Imc gift shop - sprinkler modificaitons to accommodate alterations to the gift shop within the existing hospital buildings as indicated on plans filed herewith. Filing B00593762-I1.
Imc peds/pulmonary office - modificaitons to HVAC equipment and ductwork to accommodate alterations to the pediatric & pulmonary offices within the existing hospital building as indicated on plans. Filing B00593799-I1.
Filing B00593772-I1 reached an approved status.
Imc gift shop - modifications to HVAC equipment and ductwork to accommodate alterations to the gift shop within the existing hospital building as per plans filed herewith. Filing B00593754-I1.
Imc peds/pulmonary office - plumbing and sprinkler modificaitons to accommodate alterations to the pediatric & pulmonary offices within the existing hospital building as indicated on plans. Filing B00593805-I1.
DOB lists a first permit date for B00578352-I1. That is not by itself confirmation of activity on site.
Filing B00593762-I1 reached an approved status.
Filing B00593799-I1 reached an approved status.
DOB lists a first permit date for B00580931-I1. That is not by itself confirmation of activity on site.
Filing B00593754-I1 reached an approved status.
Filing B00593805-I1 reached an approved status.
DOB lists a first permit date for B00580933-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00593799-I1. That is not by itself confirmation of activity on site.
Filing B00593740-I1 reached an approved status.
DOB lists a first permit date for B00593740-I1. That is not by itself confirmation of activity on site.
Imc gift shop - plumbing modifications to accommodate alterations to the accessory gift shop in the existing hospital. Filing B00593762-S1.
IMC Coder - Modifications to interior partitions and finishes to accommodate alterations for the Coders Suite at partial 3rd floor East Bldg. as per plans. Filing B00619740-I1.
IMC Coder - Modifications to HVAC Equipment and Ductwork to accommodate alterations for the Coders Suite at partial 3rd floor East Bldg. as per plans. Filing B00619751-I1.
Filing B00593762-S1 reached an approved status.
Filing B00619751-I1 reached an approved status.
Filing B00619740-I1 reached an approved status.
DOB lists a first permit date for B00593762-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00593772-I1. That is not by itself confirmation of activity on site.
Structural work to accommodate repairs to the existing EMR bulkhead roof supporting framing, as per plans. No change in use, egress or occupancy. Filing B00578336-I1.
Structural modifications to accommodate repairs to the chapel roof supports as per plans. Filing B00578337-I1.
Filing B00578336-I1 reached an approved status.
Filing B00578337-I1 reached an approved status.
DOB lists a first permit date for B00593754-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00593805-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00593762-S1. That is not by itself confirmation of activity on site.
The latest status recorded for B00593805-I1 is “Permit Entire.”
DOB recorded a sign-off for B00337828-I1.
The latest status recorded for B00337828-I1 is “LOC Issued.”
Imc 4e - modification of HVAC equipment and ductwork to accommodate alterations at partial 4th fl east. Filing B00639214-I1.
Imc 4e -sprinkler and plumbing modifications to accommodate alterations at partial 4th fl east. Filing B00639223-I1.
Filing B00639214-I1 reached an approved status.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00486368-P1.
Filing B00486368-P1 reached an approved status.
The latest status recorded for B00486368-P1 is “Approved.”
Filing B00639223-I1 reached an approved status.
DOB lists a first permit date for B00639223-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00639214-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00619751-I1. That is not by itself confirmation of activity on site.
Imc 4e- modification of interior partitions and finishes to accommodate alterations at partial 4th fl. Filing B00639190-I1.
DOB lists a first permit date for B00619740-I1. That is not by itself confirmation of activity on site.
Filing B00639190-I1 reached an approved status.
DOB lists a first permit date for B00639190-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00401059-I1 is “Permit Entire.”
DOB lists a first permit date for B00587278-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00486368-P2.
Filing B00486368-P2 reached an approved status.
The latest status recorded for B00486368-P2 is “Approved.”
The latest status recorded for B00486368-I1 is “Permit Entire.”
Imc ed: structural modifications to accommodate alterations to the existing emergency department. Filing B00561256-I1.
DOB lists a first permit date for B00578337-I1. That is not by itself confirmation of activity on site.
Filing B00561256-I1 reached an approved status.
Imc coder - plumbing and sprinkler modifications to accommodate alterations to the coders suite in the existing hospital building. Filing B00619754-I1.
Filing B00619754-I1 reached an approved status.
DOB lists a first permit date for B00619754-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00619754-I1 is “Permit Entire.”
DOB lists a first permit date for B00578336-I1. That is not by itself confirmation of activity on site.
Imc 4e - structural modification and install new dunnage to accommodate alterations for the med surge suite as per plans. Filing B00639229-I1.
Filing B00639229-I1 reached an approved status.
DOB lists a first permit date for B00639229-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00422578-I1. That is not by itself confirmation of activity on site.
Admin Office - Sprinkler & plumbing modifications to accommodate alterations to the admin office in the existing east bldg. Filing B00587278-P1.
Filing B00587278-P1 reached an approved status.
The latest status recorded for B00587278-P1 is “Approved.”
DOB recorded a sign-off for B00337834-I1.
The latest status recorded for B00337834-I1 is “LOC Issued.”
DOB recorded a sign-off for B00422591-I1.
The latest status recorded for B00422591-I1 is “LOC Issued.”
East bldg admin offices- modifications to HVAC equipment and ductwork to accommodate alterations to the east bldg admin offices. Filing B00561272-P1.
Filing B00561272-P1 reached an approved status.
The latest status recorded for B00561272-P1 is “Approved.”
Imc ed: structural modifications to accommodate alterations to the existing emergency department. Filing B00561256-P1.
Filing B00561256-P1 reached an approved status.
The latest status recorded for B00561256-P1 is “Approved.”
DOB lists a first permit date for B00561256-I1. That is not by itself confirmation of activity on site.
Structural modifications to accommodate supports for ees risers as per plans. Filing B00547157-I1.
Filing B00547157-I1 reached an approved status.
Structural modifications to accommodate supports for ees risers as per plans. Filing B00547157-P1.
Filing B00547157-P1 reached an approved status.
The latest status recorded for B00547157-P1 is “Approved.”
DOB recorded a sign-off for B00471954-I1.
The latest status recorded for B00471954-I1 is “LOC Issued.”
DOB recorded a sign-off for B00475093-I1.
The latest status recorded for B00475093-I1 is “LOC Issued.”
Imc ees int: plumbing and sprinkler modifications to accommodate alterations for the ees riser project as indicated on plans filed herewith. Filing B00547140-S2.
Imc ees int: modification of HVAC equipment and ductwork to accommodate alterations for the ees riser project within the existing hospital building. Filing B00547140-S1.
Modifications of interior partitions and finishes to accommodate alterations to the east bldg 1st fl admin offices. Filing B00561245-P1.
East bldg admin offices- modifications to the ductwork to accommodate alterations to the east bldg admin offices. Filing B00561272-P2.
Filing B00561272-P2 reached an approved status.
The latest status recorded for B00561272-P2 is “Approved.”
Filing B00561245-P1 reached an approved status.
The latest status recorded for B00561245-P1 is “Approved.”
DOB recorded a sign-off for B00561272-I1.
The latest status recorded for B00561272-I1 is “LOC Issued.”
DOB recorded a sign-off for B00587278-I1.
The latest status recorded for B00587278-I1 is “LOC Issued.”
DOB recorded a sign-off for B00561245-I1.
The latest status recorded for B00561245-I1 is “LOC Issued.”
DOB recorded a sign-off for B00593740-I1.
The latest status recorded for B00593740-I1 is “LOC Issued.”
DOB recorded a sign-off for B00593754-I1.
The latest status recorded for B00593754-I1 is “LOC Issued.”
Filing B00547140-S2 reached an approved status.
DOB recorded a sign-off for B00593772-I1.
The latest status recorded for B00593772-I1 is “LOC Issued.”
Filing B00547140-S1 reached an approved status.
DOB recorded a sign-off for B00384673-I1.
The latest status recorded for B00384673-I1 is “LOC Issued.”
DOB recorded a sign-off for B00580933-I1.
The latest status recorded for B00580933-I1 is “LOC Issued.”
DOB recorded a sign-off for B00472643-I1.
The latest status recorded for B00472643-I1 is “LOC Issued.”
DOB recorded a sign-off for B00511316-I1.
The latest status recorded for B00511316-I1 is “LOC Issued.”
DOB recorded a sign-off for B00578336-I1.
The latest status recorded for B00578336-I1 is “LOC Issued.”
DOB recorded a sign-off for B00578337-I1.
The latest status recorded for B00578337-I1 is “LOC Issued.”
DOB recorded a sign-off for B00580931-I1.
The latest status recorded for B00580931-I1 is “LOC Issued.”
DOB recorded a sign-off for B00422578-I1.
The latest status recorded for B00422578-I1 is “LOC Issued.”
DOB recorded a sign-off for B00593762-I1.
The latest status recorded for B00593762-I1 is “LOC Issued.”
DOB recorded a sign-off for B00593762-S1.
The latest status recorded for B00593762-S1 is “LOC Issued.”
DOB recorded a sign-off for B00593799-I1.
The latest status recorded for B00593799-I1 is “LOC Issued.”
DOB recorded a sign-off for B00619740-I1.
The latest status recorded for B00619740-I1 is “LOC Issued.”
DOB recorded a sign-off for B00619751-I1.
The latest status recorded for B00619751-I1 is “LOC Issued.”
EES RISER - partition modifications to accommodate ees riser project as per plans. Filing B00547140-P1.
DOB recorded a sign-off for B00543254-I1.
The latest status recorded for B00543254-I1 is “LOC Issued.”
Filing B00547140-P1 reached an approved status.
The latest status recorded for B00547140-P1 is “Approved.”
DOB recorded a sign-off for B00639223-I1.
The latest status recorded for B00639223-I1 is “LOC Issued.”
DOB recorded a sign-off for B00578352-I1.
The latest status recorded for B00578352-I1 is “LOC Issued.”
DOB recorded a sign-off for B00639190-I1.
The latest status recorded for B00639190-I1 is “LOC Issued.”
DOB lists a first permit date for B00547140-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00547140-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00547140-S1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00359446-I1.
The latest status recorded for B00359446-I1 is “LOC Issued.”
DOB recorded a sign-off for B00418988-I1.
The latest status recorded for B00418988-I1 is “LOC Issued.”
DOB recorded a sign-off for B00444064-I1.
The latest status recorded for B00444064-I1 is “LOC Issued.”
DOB recorded a sign-off for B00384703-I1.
The latest status recorded for B00384703-I1 is “LOC Issued.”
Imc ees int: modification of HVAC equipment and ductwork to accommodate alterations for the ees riser project within the existing hospital building. Filing B00547140-P3.
Imc ees int: plumbing and sprinkler modifications to accommodate alterations for the ees riser project as indicated on plans filed herewith. Filing B00547140-P4.
EES RISER - partition modifications to accommodate ees riser project as per plans. Filing B00547140-P2.
Filing B00547140-P2 reached an approved status.
The latest status recorded for B00547140-P2 is “Approved.”
Structural modifications to accommodate supports for ees risers as per plans. Filing B00547157-P2.
Filing B00547157-P2 reached an approved status.
The latest status recorded for B00547157-P2 is “Approved.”
Filing B00547140-P4 reached an approved status.
The latest status recorded for B00547140-P4 is “Approved.”
Filing B00547140-P3 reached an approved status.
The latest status recorded for B00547140-P3 is “Approved.”
DOB recorded a sign-off for B00558775-I1.
The latest status recorded for B00558775-I1 is “LOC Issued.”
The latest status recorded for B00317679-I1 is “Permit Entire.”
Imc ees int: modification of HVAC equipment and ductwork to accommodate alterations for the ees riser project within the existing hospital building. Filing B00547140-P5.
Filing B00547140-P5 reached an approved status.
The latest status recorded for B00547140-P5 is “Approved.”
DOB recorded a sign-off for B00359666-I1.
The latest status recorded for B00359666-I1 is “LOC Issued.”
DOB lists a first permit date for B00547157-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00639229-I1.
The latest status recorded for B00639229-I1 is “LOC Issued.”
Imc ees int: modification of HVAC equipment and ductwork to accommodate alterations for the ees riser project within the existing hospital building. Filing B00547140-P6.
Filing B00547140-P6 reached an approved status.
The latest status recorded for B00547140-P6 is “Approved.”
DOB recorded a sign-off for B00547140-S1.
The latest status recorded for B00547140-S1 is “LOC Issued.”
Imc 9 fl: - modifications of interior partitions and finsihes at partial 9th floor within the existing hospital buildings as indicated on plans filed herewith. no change to use, egress or occupancy. Filing B01303167-I1.
IMC 9 FL: Structural modifications within the existing hospital building as indicated on plans filed herewith. Filing B01303167-S3.
DOB recorded a sign-off for B00547140-I1.
The latest status recorded for B00547140-I1 is “LOC Issued.”
The latest status recorded for B00561256-I1 is “Permit Entire.”
Filing B01303167-I1 reached an approved status.
Imc ees int: plumbing and sprinkler modifications to accommodate alterations for the ees riser project as indicated on plans filed herewith. Filing B00547140-P7.
DOB lists a first permit date for B01303167-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00639214-I1.
The latest status recorded for B00639214-I1 is “LOC Issued.”
Filing B00547140-P7 reached an approved status.
The latest status recorded for B00547140-P7 is “Approved.”
DOB recorded a sign-off for B00547157-I1.
The latest status recorded for B00547157-I1 is “LOC Issued.”
DOB recorded a sign-off for B00547140-S2.
The latest status recorded for B00547140-S2 is “LOC Issued.”
IMC 6W Demo: Removal of plumbing, sprinkler lines and fixtures; install new temp loop as per plans. No change to use, egress or occupancy. Filing B01352908-S1.
Filing B01352908-S1 reached an approved status.
Imc 9 fl: - modifications of interior partitions and finsihes at partial 9th floor within the existing hospital buildings as indicated on plans filed herewith. no change to use, egress or occupancy. Filing B01303167-P1.
DOB lists a first permit date for B01352908-S1. That is not by itself confirmation of activity on site.
The latest status recorded for B01352908-S1 is “Permit Issued.”
Filing B01303167-P1 reached an approved status.
The latest status recorded for B01303167-P1 is “Approved.”
The latest status recorded for B01303167-I1 is “Permit Entire.”
The latest status recorded for B01303167-S3 is “Plan Examiner Review.”