Building record · BIN 3050557

1073 Bedford Avenue

1073 Bedford Avenue, Brooklyn, NY 11216

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3050557

1073 Bedford Avenue

Bedford-Stuyvesant (West), Brooklyn

A consolidated public-record view · updated Sep 4, 2026

DOB filings
2
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records2
First included filingApr 29, 2026
Latest recorded changeSep 4, 2026

The lot

What is already here?

The lot holds a 4-story walk-up apartment building built in 1931, with 12 homes, on a 4,000 sq ft lot.

Built
1931
Last altered
1996
Floors
4
Residential units
12
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7A
Lot area
4,000 sq ft
Building area
11,520 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 15 notices on file; the most recent was issued Jun 30, 2023.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 8, 2019 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT

  • 4 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3050557. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 29, 2026
Latest recorded change
Sep 4, 2026
Highest proposed story count
4 stories
Highest proposed unit count
11 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1073 Bedford Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Proposed removal, relocation and new installationof plumbing fixtures on floors: partial cellar,1st, 2nd, 3rd & 4th floors. filed to address and cure summons: 35153484k;35153483z. Filing B01392428-S1.

    01
  2. Alteration approved

    Filing B01392428-S1 reached an approved status.

    02
  3. Alteration filed

    Proposed int. reno of existing 4-story over cellar res bldng on cel, 1-4, rof. work includes partitions & installation of 2 condensing units at rof on metal brackets. all work filed to address ecb vios: 5153484k;35153483z;35089671m;35086514p;35086512l. Filing B01392428-I1.

    03
  4. Alteration approved

    Filing B01392428-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B01392428-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration now approved

    The latest status recorded for B01392428-I1 is “Permit Entire.”

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B01392428-S1. That is not by itself confirmation of activity on site.

    07
  8. Alteration now approved

    The latest status recorded for B01392428-S1 is “Permit Entire.”

    08