DOB filing B00596086-I1
New building at 510 Gates Avenue
Building record · BIN 3051169
510 Gates Avenue, Brooklyn, NY 11216
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 22 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3051169
510 Gates Avenue
Bedford-Stuyvesant (West), Brooklyn
A consolidated public-record view · updated Sep 23, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story care home built in 2024, on a 12,117 sq ft lot.
Owner of record
IMPACCT HOUSING DEVELOPMENT FUND CORPORA TION
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 7 open notices on record for this building, out of 57 notices on file; the most recent was issued Oct 28, 2021.
Issued Oct 28, 2021
Issued Sep 15, 2020
Issued Sep 11, 2019
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3051169. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 22 new building. Its latest status categories are 17 approved, 1 closed or withdrawn, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 510 Gates Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 22 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Propose new 6-story plus cellar building as non-profit institution with sleeping accommodations (use group 3a) as per plan. building as per plan. obtain new c of o. Filing B00596086-I1.
Herewith filing for new installation of plumbing system. Filing B00596086-S5.
Herewith filing for new installation of HVAC system. Filing B00596086-S3.
Filing B00596086-S3 reached an approved status.
Propose structural work constructed with CMU bearing walls and hollow precast concrete plank floors filed in conjunction with NB # B00596086-I1. Filing B00596086-S2.
Propose Cast-in-place concrete foundation wall spread and strip footings work filed in conjunction with NB # B00596086-I1. Filing B00596086-S1.
Filing B00596086-S2 reached an approved status.
Subsequently file SOE work for proposed 6-story plus cellar building filed in conjunction with NB-GC # B00596086-I1. Filing B00596086-S6.
Subsequently filed UNDERPINNING SCOPE of Work in conjunction with NB # B00596086-S7. Filing B00596086-S7.
Herewith filing for new installation of sprinkler and standpipe system. Filing B00596086-S4.
Filing B00596086-S5 reached an approved status.
Filing B00596086-S4 reached an approved status.
Filing B00596086-I1 reached an approved status.
Filing B00596086-S1 reached an approved status.
Filing B00596086-S6 reached an approved status.
Filing B00596086-S7 reached an approved status.
Propose new 6-story plus cellar building as non-profit institution with sleeping accommodations (use group 3a) as per plan. building as per plan. obtain new c of o. Filing B00596086-P2.
Filing B00596086-P2 reached an approved status.
The latest status recorded for B00596086-P2 is “Approved.”
Propose new 6-story plus cellar building as non-profit institution with sleeping accommodations (use group 3a) as per plan. building as per plan. obtain new c of o. Filing B00596086-P4.
Propose Cast-in-place concrete foundation wall spread and strip footings work filed in conjunction with NB # B00596086-I1. Filing B00596086-P5.
Propose structural work constructed with CMU bearing walls and hollow precast concrete plank floors filed in conjunction with NB # B00596086-I1. Filing B00596086-P6.
Filing B00596086-P4 reached an approved status.
The latest status recorded for B00596086-P4 is “Approved.”
Filing B00596086-P5 reached an approved status.
The latest status recorded for B00596086-P5 is “Approved.”
Filing B00596086-P6 reached an approved status.
The latest status recorded for B00596086-P6 is “Approved.”
DOB lists a first permit date for B00596086-S6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596086-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596086-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596086-S1. That is not by itself confirmation of activity on site.
Subsequently file SOE work for proposed 6-story plus cellar building filed in conjunction with NB-GC # B00596086-I1. Filing B00596086-P8.
Filing B00596086-P8 reached an approved status.
The latest status recorded for B00596086-P8 is “Approved.”
Propose structural work constructed with CMU bearing walls and hollow precast concrete plank floors filed in conjunction with NB # B00596086-I1. Filing B00596086-A1.
Filing B00596086-A1 reached an approved status.
The latest status recorded for B00596086-A1 is “Approved.”
DOB lists a first permit date for B00596086-S4. That is not by itself confirmation of activity on site.
Herewith filing for new installation of plumbing system. Filing B00596086-P7.
Filing B00596086-P7 reached an approved status.
The latest status recorded for B00596086-P7 is “Approved.”
DOB lists a first permit date for B00596086-S5. That is not by itself confirmation of activity on site.
Herewith filing for new installation of HVAC system. Filing B00596086-P1.
Filing B00596086-P1 reached an approved status.
The latest status recorded for B00596086-P1 is “Approved.”
DOB lists a first permit date for B00596086-S7. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596086-S3. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00596086-S6.
The latest status recorded for B00596086-S6 is “LOC Issued.”
DOB recorded a sign-off for B00596086-S2.
The latest status recorded for B00596086-S2 is “LOC Issued.”
DOB recorded a sign-off for B00596086-S1.
The latest status recorded for B00596086-S1 is “LOC Issued.”
DOB recorded a sign-off for B00596086-S7.
The latest status recorded for B00596086-S7 is “LOC Issued.”
The latest status recorded for B00596086-S3 is “Permit Entire.”
Herewith filing for new installation of plumbing system. Filing B00596086-A5.
Filing B00596086-A5 reached an approved status.
The latest status recorded for B00596086-A5 is “Approved.”
Herewith filing for new installation of sprinkler and standpipe system. Filing B00596086-A6.
Filing B00596086-A6 reached an approved status.
The latest status recorded for B00596086-A6 is “Approved.”
Propose new 6-story plus cellar building as non-profit institution with sleeping accommodations (use group 3a) as per plan. building as per plan. obtain new c of o. Filing B00596086-A7.
Filing B00596086-A7 reached an approved status.
The latest status recorded for B00596086-A7 is “Approved.”
Propose new 6-story plus cellar building as non-profit institution with sleeping accommodations (use group 3a) as per plan. building as per plan. obtain new c of o. Filing B00596086-A8.
Filing B00596086-A8 reached an approved status.
The latest status recorded for B00596086-A8 is “Approved.”
The latest status recorded for B00596086-S8 is “Filing Withdrawn.”
The latest status recorded for B00596086-S4 is “Permit Entire.”
The latest status recorded for B00596086-S5 is “Permit Entire.”
Propose new 6-story plus cellar building as non-profit institution with sleeping accommodations (use group 3a) as per plan. building as per plan. obtain new c of o. Filing B00596086-A9.
Filing B00596086-A9 reached an approved status.
The latest status recorded for B00596086-A9 is “Approved.”
The latest status recorded for B00596086-I1 is “Permit Entire.”