DOB filing B00228001-I1
Alteration filing at 1536 Fulton Street
Building record · BIN 3053850
1536 Fulton Street, Brooklyn, NY 11216
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 0 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3053850
1536 Fulton Street
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Sep 21, 2021
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3053850. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 3 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1536 Fulton Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Relocate 30 sprinkler heads and add 18 sprinkler heads to existing sprinkler system on 1st floor. Filing B00228667-I1.
Relocate and replace fixtures per plans filed herewith. Filing B00224587-I1.
Rearrange existing ductwork connected to existing ac units on the roof. Filing B00228001-I1.
Filing B00228001-I1 reached an approved status.
DOB lists a first permit date for B00228001-I1. That is not by itself confirmation of activity on site.
Filing B00224587-I1 reached an approved status.
DOB lists a first permit date for B00224587-I1. That is not by itself confirmation of activity on site.
Filing B00228667-I1 reached an approved status.
DOB lists a first permit date for B00228667-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00224587-I1.
The latest status recorded for B00224587-I1 is “LOC Issued.”
DOB recorded a sign-off for B00228667-I1.
The latest status recorded for B00228667-I1 is “LOC Issued.”
DOB recorded a sign-off for B00228001-I1.
The latest status recorded for B00228001-I1 is “LOC Issued.”