DOB filing B00977949-P2
New building at 910 Bedford Avenue
Building record · BIN 3055002
910 Bedford Avenue, Brooklyn, NY 11205
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3055002
910 Bedford Avenue
Bedford-Stuyvesant (West), Brooklyn
A consolidated public-record view · updated Sep 19, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story warehouse built in 1968, on a 4,800 sq ft lot.
The apartments
232 condominium apartments are assessed on this block, and the typical one is 1,131 sq ft (105 m²). They run from 41 to 460 m².
The city values the typical one at $312,340. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
Owner of record
MYRTLE WOODS 684 LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 26 notices on file; the most recent was issued Mar 21, 2024.
Issued Mar 21, 2024 — BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANTS WITHDRAWAL OF APPLICATION # 321782950.
Issued Oct 19, 2023 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT # 321782950 ON 10/17/23. CONSTRUCTION SUPERINTENDENT WITHDRAWAL
Issued Oct 19, 2023 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT # 321782950 ON 10/17/23. CONSTRUCTION SUPERINTENDENT WITHDRAWAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3055002. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 new building, 1 alteration filing. Its latest status categories are 3 approved, 2 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 910 Bedford Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of a temporary wooden construction fence. Filing B00977949-S3.
Filing B00977949-S3 reached an approved status.
DOB lists a first permit date for B00977949-S3. That is not by itself confirmation of activity on site.
(please assign to dev hub) PROPOSED 7 STORY AND CELLAR 22 UNIT RESIDENTIAL BUILDING. Filing B00977949-P1.
Installation of a temporary wooden construction fence. Filing B00977949-P2.
Installation of new curb cut as per plans. Filing B00977949-P3.
The latest status recorded for B00977949-P3 is “Plan Examiner Review.”
The latest status recorded for B00977949-P1 is “Plan Examiner Review.”
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing B01327889-I1.
DOB lists a first permit date for B01327889-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01327889-I1 is “Permit Entire.”
Filing B00977949-P2 reached an approved status.
The latest status recorded for B00977949-P2 is “Approved.”
The latest status recorded for B00977949-S3 is “Permit Entire.”