Building record · BIN 3055929

80 Greene Avenue

80 Greene Avenue, Brooklyn, NY 11238

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3055929

80 Greene Avenue

Clinton Hill, Brooklyn

A consolidated public-record view · updated Sep 30, 2026

DOB filings
14
Active-status
14
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings14
Open or active-status records14
First included filingSep 1, 2021
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 7-story elevator apartment building built in 1982, with 97 homes, on a 16,875 sq ft lot.

  1. Floors 6–7Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 15.8 m. Nothing on that side reaches this floor.
  2. Floors 2–5Homes97 homes are recorded on this lot — about 16 homes to a floor, and the apartments assessed on this block run to a typical 1,121 sq ft (104 m²). The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes97 recorded · typically 104 m² · valued $276,229
  • Above the southern skylineFrom about floor 6 — the tallest thing within 60 m to the south is 15.8 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 21 m over 7 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1982
Last altered
2024
Floors
7
Residential units
97
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6B
Lot area
16,875 sq ft
Building area
71,470 sq ft
Historic district
Fort Greene Historic District

The apartments

78 condominium apartments are assessed on this block, and the typical one is 1,121 sq ft (104 m²). They run from 67 to 263 m².

The city values the typical one at $276,229. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

3 apartments on this tax block changed hands in the year the city last published, at a median of $1,300,000, from 1,070,000 to 1,875,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

435 CLERMONT AVENUE LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 37 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3055929. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 14 alteration filing. Its latest status categories are 1 under review, 13 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 1, 2021
Latest recorded change
Sep 30, 2026
Highest proposed story count
7 stories
Highest proposed unit count
97 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 80 Greene Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-I1.

    01
  2. Alteration approved

    Filing B00544638-I1 reached an approved status.

    02
  3. Alteration filed

    Replacement of existing 1 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-I1.

    03
  4. Alteration approved

    Filing B00542558-I1 reached an approved status.

    04
  5. Alteration filed

    Replacement of existing 2 boiler and install 2 hot water heater in boiler room on 1st floor. mechanical work as per plan. no change in use, egress or occupancy. Filing B00544569-I1.

    05
  6. Alteration approved

    Filing B00544569-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B00544569-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00542558-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00544638-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Replacement of existing 2 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-P1.

    010
  11. Alteration filed

    Replacement of existing 2 boiler and install 2 hot water heater in boiler room on 1st floor. mechanical work as per plan. no change in use, egress or occupancy. Filing B00544569-P1.

    011
  12. Alteration filed

    Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P1.

    012
  13. Alteration approved

    Filing B00542558-P1 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for B00542558-P1 is “Approved.”

    014
  15. Alteration now approved

    The latest status recorded for B00544569-I1 is “Permit Entire.”

    015
  16. Alteration approved

    Filing B00544569-P1 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00544569-P1 is “Approved.”

    017
  18. Alteration approved

    Filing B00544638-P1 reached an approved status.

    018
  19. Alteration now approved

    The latest status recorded for B00544638-P1 is “Approved.”

    019
  20. Alteration filed

    Replacement of existing 1 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-P2.

    020
  21. Alteration approved

    Filing B00542558-P2 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for B00542558-P2 is “Approved.”

    022
  23. Alteration filed

    Replacement of existing 1 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-P3.

    023
  24. Alteration filed

    Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P3.

    024
  25. Alteration approved

    Filing B00544638-P3 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B00544638-P3 is “Approved.”

    026
  27. Alteration now approved

    The latest status recorded for B00542558-I1 is “Permit Entire.”

    027
  28. Alteration approved

    Filing B00542558-P3 reached an approved status.

    028
  29. Alteration now approved

    The latest status recorded for B00542558-P3 is “Approved.”

    029
  30. Alteration filed

    Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P4.

    030
  31. Alteration approved

    Filing B00544638-P4 reached an approved status.

    031
  32. Alteration now approved

    The latest status recorded for B00544638-P4 is “Approved.”

    032
  33. Alteration filed

    Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P5.

    033
  34. Alteration approved

    Filing B00544638-P5 reached an approved status.

    034
  35. Alteration now approved

    The latest status recorded for B00544638-P5 is “Approved.”

    035
  36. Alteration filed

    Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P6.

    036
  37. Alteration approved

    Filing B00544638-P6 reached an approved status.

    037
  38. Alteration now approved

    The latest status recorded for B00544638-P6 is “Approved.”

    038
  39. Alteration now approved

    The latest status recorded for B00544638-I1 is “Permit Entire.”

    039
  40. Alteration filed

    Installation of heavy duty sidewalk shed. no change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc. Filing B01233662-I1.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for B01233662-I1. That is not by itself confirmation of activity on site.

    041
  42. Alteration now approved

    The latest status recorded for B01233662-I1 is “Permit Entire.”

    042
  43. Alteration filed

    Structural plans filed herewith to show structural concrete repairs on the terraces. No change to use, egress, or occupancy. Filing B01302613-P1.

    043
  44. Alteration now under review

    The latest status recorded for B01302613-P1 is “Plan Examiner Review.”

    044