DOB filing B01302613-P1
Alteration filing at 80 Greene Avenue
Building record · BIN 3055929
80 Greene Avenue, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3055929
80 Greene Avenue
Clinton Hill, Brooklyn
A consolidated public-record view · updated Sep 30, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story elevator apartment building built in 1982, with 97 homes, on a 16,875 sq ft lot.
The apartments
78 condominium apartments are assessed on this block, and the typical one is 1,121 sq ft (104 m²). They run from 67 to 263 m².
The city values the typical one at $276,229. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
3 apartments on this tax block changed hands in the year the city last published, at a median of $1,300,000, from 1,070,000 to 1,875,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
435 CLERMONT AVENUE LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 37 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3055929. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 14 alteration filing. Its latest status categories are 1 under review, 13 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 80 Greene Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-I1.
Filing B00544638-I1 reached an approved status.
Replacement of existing 1 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-I1.
Filing B00542558-I1 reached an approved status.
Replacement of existing 2 boiler and install 2 hot water heater in boiler room on 1st floor. mechanical work as per plan. no change in use, egress or occupancy. Filing B00544569-I1.
Filing B00544569-I1 reached an approved status.
DOB lists a first permit date for B00544569-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00542558-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00544638-I1. That is not by itself confirmation of activity on site.
Replacement of existing 2 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-P1.
Replacement of existing 2 boiler and install 2 hot water heater in boiler room on 1st floor. mechanical work as per plan. no change in use, egress or occupancy. Filing B00544569-P1.
Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P1.
Filing B00542558-P1 reached an approved status.
The latest status recorded for B00542558-P1 is “Approved.”
The latest status recorded for B00544569-I1 is “Permit Entire.”
Filing B00544569-P1 reached an approved status.
The latest status recorded for B00544569-P1 is “Approved.”
Filing B00544638-P1 reached an approved status.
The latest status recorded for B00544638-P1 is “Approved.”
Replacement of existing 1 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-P2.
Filing B00542558-P2 reached an approved status.
The latest status recorded for B00542558-P2 is “Approved.”
Replacement of existing 1 boiler and install 2 hot water heater in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00542558-P3.
Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P3.
Filing B00544638-P3 reached an approved status.
The latest status recorded for B00544638-P3 is “Approved.”
The latest status recorded for B00542558-I1 is “Permit Entire.”
Filing B00542558-P3 reached an approved status.
The latest status recorded for B00542558-P3 is “Approved.”
Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P4.
Filing B00544638-P4 reached an approved status.
The latest status recorded for B00544638-P4 is “Approved.”
Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P5.
Filing B00544638-P5 reached an approved status.
The latest status recorded for B00544638-P5 is “Approved.”
Replacement of existing 2 boiler in boiler room on 1st floor. no change in use, egress or occupancy. Filing B00544638-P6.
Filing B00544638-P6 reached an approved status.
The latest status recorded for B00544638-P6 is “Approved.”
The latest status recorded for B00544638-I1 is “Permit Entire.”
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc. Filing B01233662-I1.
DOB lists a first permit date for B01233662-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01233662-I1 is “Permit Entire.”
Structural plans filed herewith to show structural concrete repairs on the terraces. No change to use, egress, or occupancy. Filing B01302613-P1.
The latest status recorded for B01302613-P1 is “Plan Examiner Review.”