Building record · BIN 3058187

9 Metrotech Center

9 Metrotech Center, Brooklyn, NY 11201

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3058187

9 Metrotech Center

Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn

A consolidated public-record view · updated Feb 7, 2023

DOB filings
12
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings12
Open or active-status records2
First included filingNov 13, 2019
Latest recorded changeFeb 7, 2023

The lot

What is already here?

The lot holds a 8-story office building built in 1996, on a 45,056 sq ft lot.

  1. Floors 2–8Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 32 — the tallest thing within 60 m to the south is 93.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 40.1 m over 8 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1996
Floors
8
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-1A
Lot area
45,056 sq ft
Building area
407,400 sq ft

Owner of record

NEW YORK UNIVERSITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 82 notices on file; the most recent was issued Jun 30, 2023.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3058187. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 12 alteration filing. Its latest status categories are 10 recorded as completed, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 13, 2019
Latest recorded change
Feb 7, 2023
Highest proposed story count
8 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 9 Metrotech Center.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Removal & installation of ductwork on partial 4th floor (FDNY Restack) as per plans filed herewith. No change in use, egress or occupancy. Filing B00250713-I1.

    01
  2. Alteration approved

    Filing B00250713-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00250713-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Garage restoration on sub-cellar & cellar as per plans filed herewith. no change in use, egress or occupancy. Filing B00253188-I1.

    04
  5. Alteration approved

    Filing B00253188-I1 reached an approved status.

    05
  6. Alteration filed

    Modification of sprinkler on 5th floor for (FDNY Cadet) as per plans filed herewith. All work under this application is interior. No change in use, egress or occupancy. Filing B00262065-I1.

    06
  7. Alteration filed

    Modification of ductwork & diffusers/grilles on partial 5th floor (FDNY Cadet) as pr plans. All work under this application is interior only. No change in use, egress or occupancy. Filing B00262418-I1.

    07
  8. Alteration approved

    Filing B00262065-I1 reached an approved status.

    08
  9. Alteration approved

    Filing B00262418-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00262065-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00253188-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00262418-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration signed off

    DOB recorded a sign-off for B00250713-I1.

    013
  14. Alteration signed off

    DOB recorded a sign-off for B00262065-I1.

    014
  15. Alteration signed off

    DOB recorded a sign-off for B00262418-I1.

    015
  16. Alteration filed

    Provide permanent bi-polar ionization systems at each of the 2 central self contained ac units, on 2nd floor (fdny/bhs) as per plans submitted herewith. all work filed under this application is interior only. no change in use egress or occupancy. Filing B00410938-I1.

    016
  17. Alteration approved

    Filing B00410938-I1 reached an approved status.

    017
  18. Alteration now completed

    The latest status recorded for B00250713-I1 is “LOC Issued.”

    018
  19. Alteration now completed

    The latest status recorded for B00262065-I1 is “LOC Issued.”

    019
  20. Alteration now completed

    The latest status recorded for B00262418-I1 is “LOC Issued.”

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B00410938-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Garage restoration on sub-cellar & cellar as per plans filed herewith. no change in use, egress or occupancy. Filing B00253188-P1.

    022
  23. Alteration now approved

    The latest status recorded for B00253188-I1 is “Permit Entire.”

    023
  24. Alteration approved

    Filing B00253188-P1 reached an approved status.

    024
  25. Alteration now approved

    The latest status recorded for B00253188-P1 is “Approved.”

    025
  26. Alteration filed

    Modification to plumbing on 5th floor (fdny bathrooms) as per plans. no change in use, egress or occupancy. Filing B00539720-I1.

    026
  27. Alteration filed

    Interior renovation on 5th floor (fdny bathrooms) as per plans. no change in use, egress or occupancy. Filing B00539693-I1.

    027
  28. Alteration approved

    Filing B00539720-I1 reached an approved status.

    028
  29. Alteration approved

    Filing B00539693-I1 reached an approved status.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for B00539693-I1. That is not by itself confirmation of activity on site.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for B00539720-I1. That is not by itself confirmation of activity on site.

    031
  32. Alteration filed

    Minor removaland installation of interior partitions associated with renovation of core bathrooms and pantries on 3rd & 7th floors as per plans. no change in use, egress or occupancy. all work related to this application is interior work only. Filing B00607735-I1.

    032
  33. Alteration approved

    Filing B00607735-I1 reached an approved status.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for B00607735-I1. That is not by itself confirmation of activity on site.

    034
  35. Alteration filed

    Removal and installation of plumbing fixtures on 3rd & 7th floors as per plans. no change in use, egress or occupancy. Filing B00607811-I1.

    035
  36. Alteration approved

    Filing B00607811-I1 reached an approved status.

    036
  37. Alteration filed

    General construction work associated with installation of turnstiles on 1st floor as per plans. no change in use, egress or occupancy. Filing B00601825-I1.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for B00607811-I1. That is not by itself confirmation of activity on site.

    038
  39. Alteration approved

    Filing B00601825-I1 reached an approved status.

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for B00601825-I1. That is not by itself confirmation of activity on site.

    040
  41. Alteration filed

    Replacing ADA wheelchair lift as per plans filed herewith. all work under this application is interior only. Filing B00640189-I1.

    041
  42. Alteration approved

    Filing B00640189-I1 reached an approved status.

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for B00640189-I1. That is not by itself confirmation of activity on site.

    043
  44. Alteration signed off

    DOB recorded a sign-off for B00601825-I1.

    044
  45. Alteration now completed

    The latest status recorded for B00601825-I1 is “LOC Issued.”

    045
  46. Alteration signed off

    DOB recorded a sign-off for B00640189-I1.

    046
  47. Alteration now completed

    The latest status recorded for B00640189-I1 is “LOC Issued.”

    047
  48. Alteration signed off

    DOB recorded a sign-off for B00539693-I1.

    048
  49. Alteration now completed

    The latest status recorded for B00539693-I1 is “LOC Issued.”

    049
  50. Alteration signed off

    DOB recorded a sign-off for B00539720-I1.

    050
  51. Alteration now completed

    The latest status recorded for B00539720-I1 is “LOC Issued.”

    051
  52. Alteration signed off

    DOB recorded a sign-off for B00607811-I1.

    052
  53. Alteration now completed

    The latest status recorded for B00607811-I1 is “LOC Issued.”

    053
  54. Alteration signed off

    DOB recorded a sign-off for B00607735-I1.

    054
  55. Alteration now completed

    The latest status recorded for B00607735-I1 is “LOC Issued.”

    055
  56. Alteration signed off

    DOB recorded a sign-off for B00410938-I1.

    056
  57. Alteration now completed

    The latest status recorded for B00410938-I1 is “LOC Issued.”

    057