DOB filing B01441849-I1
Alteration filing at 141 Willoughby Street
Building record · BIN 3058246
141 Willoughby Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 65 independently sourced records, including 40 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3058246
141 Willoughby Street
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Sep 29, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 24-story office building built in 2020, on a 18,026 sq ft lot.
The apartments
239 condominium apartments are assessed on this block, and the typical one is 738 sq ft (69 m²). They run from 41 to 183 m².
The city values the typical one at $201,130. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
10 apartments on this tax block changed hands in the year the city last published, at a median of $935,000, from 635,000 to 1,675,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
141 WILLOUGHBY FEE OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 11 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3058246. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 65 alteration filing. Its latest status categories are 40 approved, 25 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 141 Willoughby Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 65 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of a heavy duty sidewalk shed approximately 420' long as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of NYC building code of 2014. Filing B00074950-I1.
Installation of a temporary scaffold as per plans during general construction work. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00074974-I1.
DOB lists a first permit date for B00074950-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00074974-I1. That is not by itself confirmation of activity on site.
Installation of a temporary scaffold as per plans during general construction work. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00074974-P1.
Filing B00074974-P1 reached an approved status.
Proposed installation of 29' curb cut to access loading berths. No change to use, egress or occupancy is proposed. Filing B00185122-I1.
Installation of construction fence in conjunction with nb application 321593316. Filing B00368672-I1.
DOB lists a first permit date for B00368672-I1. That is not by itself confirmation of activity on site.
Installation of fuel oil storage tanks 6000 gal installed in cellar and 330 gal storage tank in roof as indicated on plans filed herewith.mechanical component of generator is filed with nb appication 321593316. Filing B00354205-I1.
Installation of three (3) gas boilers on 24th floor in conjunction with new building application 321593316. Filing B00354200-I1.
Installation of temporary construction standpipe in conjunction with new building application 321593316. Filing B00397311-I1.
DOB lists a first permit date for B00397311-I1. That is not by itself confirmation of activity on site.
Filing B00185122-I1 reached an approved status.
Installation of construction fence in conjunction with nb application 321593316. Filing B00368672-P1.
Filing B00368672-P1 reached an approved status.
Filing B00354205-I1 reached an approved status.
Filing B00354200-I1 reached an approved status.
The latest status recorded for B00368672-P1 is “Approved.”
The latest status recorded for B00074974-P1 is “Approved.”
Installation of three (3) gas boilers on 24th floor in conjunction with new building application 321593316. Filing B00354200-P1.
Installation of fuel oil storage tanks 6000 gal installed in cellar and 330 gal storage tank in roof as indicated on plans filed herewith.mechanical component of generator is filed with nb appication 321593316. Filing B00354205-P1.
Filing B00354200-P1 reached an approved status.
The latest status recorded for B00354200-P1 is “Approved.”
Filing B00354205-P1 reached an approved status.
The latest status recorded for B00354205-P1 is “Approved.”
Gold street hoists: installation of dual 10300 # capacity personnel/material hoists during nb construction, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00466904-I1.
Subgrade hoist: installation of single 5000# capacity personnel/material hoist during nb construction, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00467136-I1.
DOB lists a first permit date for B00466904-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00467136-I1. That is not by itself confirmation of activity on site.
Installation of construction fence in conjunction with nb application 321593316. Filing B00368672-P2.
Filing B00368672-P2 reached an approved status.
The latest status recorded for B00368672-P2 is “Approved.”
Installation of temporary construction standpipe in conjunction with new building application 321593316. Filing B00397311-P1.
Filing B00397311-P1 reached an approved status.
The latest status recorded for B00397311-P1 is “Approved.”
DOB lists a first permit date for B00354200-I1. That is not by itself confirmation of activity on site.
(core shaft-phase 1): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted se. Filing B00496567-I1.
DOB lists a first permit date for B00496567-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-I1.
Installation of plywood fence during nb const, filed sep. fence shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this app. dot permits by others for fence installed on sidewalk/roadway. Filing B00502023-I1.
Installation of temporary overhead protection during new bldg construction, filed sep. temporary overhead protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00502946-I1.
DOB lists a first permit date for B00501176-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00502023-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00502946-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P1.
Installation of plywood fence during nb const, filed sep. fence shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this app. dot permits by others for fence installed on sidewalk/roadway. Filing B00502023-P1.
Filing B00501176-P1 reached an approved status.
The latest status recorded for B00501176-P1 is “Approved.”
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P2.
Subgrade hoist: installation of single 5000# capacity personnel/material hoist during nb construction, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00467136-P1.
Filing B00502023-P1 reached an approved status.
The latest status recorded for B00502023-P1 is “Approved.”
Filing B00501176-P2 reached an approved status.
The latest status recorded for B00501176-P2 is “Approved.”
Filing B00467136-P1 reached an approved status.
The latest status recorded for B00467136-P1 is “Approved.”
Gold street hoists: installation of dual 10300 # capacity personnel/material hoists during nb construction, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00466904-P1.
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P3.
Filing B00466904-P1 reached an approved status.
The latest status recorded for B00466904-P1 is “Approved.”
Filing B00501176-P3 reached an approved status.
The latest status recorded for B00501176-P3 is “Approved.”
(core shaft-phase 1): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted se. Filing B00496567-P1.
Filing B00496567-P1 reached an approved status.
The latest status recorded for B00496567-P1 is “Approved.”
(core shaft-phase 1): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted se. Filing B00496567-P2.
Core shaft hoist (phase 3): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application sub sep. Filing B00544307-I1.
Core shaft hoist (phase 4): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application sub sep. Filing B00544310-I1.
Core shaft hoist (phase 5): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application sub sep. Filing B00544314-I1.
Core shaft hoist (phase 2): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application sub sep. Filing B00544301-I1.
DOB lists a first permit date for B00544307-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00544310-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00544314-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00544301-I1. That is not by itself confirmation of activity on site.
Filing B00496567-P2 reached an approved status.
The latest status recorded for B00496567-P2 is “Approved.”
Gold street hoists: installation of dual 10300 # capacity personnel/material hoists during nb construction, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00466904-P2.
Filing B00466904-P2 reached an approved status.
The latest status recorded for B00466904-P2 is “Approved.”
Use of temporary Spyder SPX 527 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-321593316. Filing B00499056-I1.
Use of temporary Jekko JF40 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-321593316. Filing B00497183-I1.
DOB lists a first permit date for B00497183-I1. That is not by itself confirmation of activity on site.
Use of temporary mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-321593316. Filing B00499063-I1.
DOB lists a first permit date for B00499063-I1. That is not by itself confirmation of activity on site.
Subgrade hoist: installation of single 5000# capacity personnel/material hoist during nb construction, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00467136-P2.
Use of temporary Spyder URW094 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-321593316. Filing B00499071-I1.
Filing B00467136-P2 reached an approved status.
The latest status recorded for B00467136-P2 is “Approved.”
(core shaft-phase 1): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted se. Filing B00496567-P3.
Filing B00496567-P3 reached an approved status.
The latest status recorded for B00496567-P3 is “Approved.”
Core shaft hoist (phase 2): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application sub sep. Filing B00544301-P1.
Filing B00544301-P1 reached an approved status.
The latest status recorded for B00544301-P1 is “Approved.”
Installation of temporary scaffold stair tower as per drawings. scaffold stair tower shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00572508-I1.
DOB lists a first permit date for B00572508-I1. That is not by itself confirmation of activity on site.
Subgrade hoist: installation of single 5000# capacity personnel/material hoist during nb construction, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00467136-P3.
Filing B00467136-P3 reached an approved status.
The latest status recorded for B00467136-P3 is “Approved.”
Gold street hoists: installation of dual 10300 # capacity personnel/material hoists during nb construction, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator application submitted sep. Filing B00466904-P3.
(core shaft-phase 1): installation of single 2000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted se. Filing B00496567-P4.
Filing B00466904-P3 reached an approved status.
The latest status recorded for B00466904-P3 is “Approved.”
Filing B00496567-P4 reached an approved status.
The latest status recorded for B00496567-P4 is “Approved.”
Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 150 psf. shed filed under separate application. storage shall comply with ch#33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00583005-I1.
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P4.
DOB lists a first permit date for B00583005-I1. That is not by itself confirmation of activity on site.
Filing B00501176-P4 reached an approved status.
The latest status recorded for B00501176-P4 is “Approved.”
Installation of temporary trolley beam system as per drawings. trolley beam system shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under thisapplication. Filing B00590801-I1.
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P5.
DOB lists a first permit date for B00590801-I1. That is not by itself confirmation of activity on site.
Filing B00501176-P5 reached an approved status.
The latest status recorded for B00501176-P5 is “Approved.”
DOB lists a first permit date for B00499056-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00499071-I1. That is not by itself confirmation of activity on site.
Installation of temporary scaffold stair tower as per drawings. scaffold stair tower shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00572508-P1.
Filing B00572508-P1 reached an approved status.
The latest status recorded for B00572508-P1 is “Approved.”
Installation and use of temporary preston box as per plans filed herewith. This application is filed in conjunction with NB-321593316. Filing B00579221-I1.
DOB lists a first permit date for B00579221-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction standpipe in conjunction with new building application 321593316. Filing B00397311-P2.
Installation of temporary scaffold stair tower as per drawings. scaffold stair tower shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00572508-P2.
Filing B00572508-P2 reached an approved status.
The latest status recorded for B00572508-P2 is “Approved.”
Filing B00397311-P2 reached an approved status.
The latest status recorded for B00397311-P2 is “Approved.”
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P6.
Filing B00501176-P6 reached an approved status.
The latest status recorded for B00501176-P6 is “Approved.”
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P7.
Installation of plywood fence during nb const, filed sep. fence shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this app. dot permits by others for fence installed on sidewalk/roadway. Filing B00502023-P2.
Filing B00501176-P7 reached an approved status.
The latest status recorded for B00501176-P7 is “Approved.”
Filing B00502023-P2 reached an approved status.
The latest status recorded for B00502023-P2 is “Approved.”
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P8.
Filing B00501176-P8 reached an approved status.
The latest status recorded for B00501176-P8 is “Approved.”
Installation of plywood fence during nb const, filed sep. fence shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this app. dot permits by others for fence installed on sidewalk/roadway. Filing B00502023-P3.
Filing B00502023-P3 reached an approved status.
The latest status recorded for B00502023-P3 is “Approved.”
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-P9.
Installation of plywood fence during nb const, filed sep. fence shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this app. dot permits by others for fence installed on sidewalk/roadway. Filing B00502023-P4.
Filing B00501176-P9 reached an approved status.
Filing B00502023-P4 reached an approved status.
The latest status recorded for B00502023-P4 is “Approved.”
The latest status recorded for B00501176-P9 is “Approved.”
Installation of heavy duty sidewalk shed during nb construction, filed separately. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00501176-A1.
Filing B00501176-A1 reached an approved status.
The latest status recorded for B00501176-A1 is “Approved.”
DOB lists a first permit date for B00354205-I1. That is not by itself confirmation of activity on site.
Installation of three (3) gas boilers on 24th floor in conjunction with new building application 321593316. Filing B00354200-P2.
Filing B00354200-P2 reached an approved status.
The latest status recorded for B00354200-P2 is “Approved.”
DOB lists a first permit date for B00185122-I1. That is not by itself confirmation of activity on site.
Installation of plywood fence during nb const, filed sep. fence shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this app. dot permits by others for fence installed on sidewalk/roadway. Filing B00502023-P5.
Filing B00502023-P5 reached an approved status.
The latest status recorded for B00502023-P5 is “Approved.”
DOB recorded a sign-off for B00466904-I1.
The latest status recorded for B00466904-I1 is “LOC Issued.”
DOB recorded a sign-off for B00467136-I1.
The latest status recorded for B00467136-I1 is “LOC Issued.”
DOB recorded a sign-off for B00496567-I1.
The latest status recorded for B00496567-I1 is “LOC Issued.”
DOB recorded a sign-off for B00544301-I1.
The latest status recorded for B00544301-I1 is “LOC Issued.”
Installation of plywood fence during nb const, filed sep. fence shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this app. dot permits by others for fence installed on sidewalk/roadway. Filing B00502023-P6.
Filing B00502023-P6 reached an approved status.
The latest status recorded for B00502023-P6 is “Approved.”
DOB recorded a sign-off for B00074950-I1.
The latest status recorded for B00074950-I1 is “LOC Issued.”
DOB recorded a sign-off for B00074974-I1.
The latest status recorded for B00074974-I1 is “LOC Issued.”
DOB recorded a sign-off for B00501176-I1.
The latest status recorded for B00501176-I1 is “LOC Issued.”
DOB recorded a sign-off for B00397311-I1.
The latest status recorded for B00397311-I1 is “LOC Issued.”
DOB recorded a sign-off for B00502023-I1.
The latest status recorded for B00502023-I1 is “LOC Issued.”
DOB recorded a sign-off for B00502946-I1.
The latest status recorded for B00502946-I1 is “LOC Issued.”
DOB recorded a sign-off for B00544307-I1.
The latest status recorded for B00544307-I1 is “LOC Issued.”
DOB recorded a sign-off for B00544310-I1.
The latest status recorded for B00544310-I1 is “LOC Issued.”
DOB recorded a sign-off for B00544314-I1.
The latest status recorded for B00544314-I1 is “LOC Issued.”
DOB recorded a sign-off for B00583005-I1.
The latest status recorded for B00583005-I1 is “LOC Issued.”
DOB recorded a sign-off for B00590801-I1.
The latest status recorded for B00590801-I1 is “LOC Issued.”
DOB recorded a sign-off for B00354200-I1.
The latest status recorded for B00354200-I1 is “LOC Issued.”
DOB recorded a sign-off for B00497183-I1.
The latest status recorded for B00497183-I1 is “LOC Issued.”
DOB recorded a sign-off for B00499063-I1.
The latest status recorded for B00499063-I1 is “LOC Issued.”
DOB recorded a sign-off for B00579221-I1.
The latest status recorded for B00579221-I1 is “LOC Issued.”
DOB recorded a sign-off for B00368672-I1.
The latest status recorded for B00368672-I1 is “LOC Issued.”
DOB recorded a sign-off for B00499056-I1.
The latest status recorded for B00499056-I1 is “LOC Issued.”
DOB recorded a sign-off for B00499071-I1.
The latest status recorded for B00499071-I1 is “LOC Issued.”
DOB recorded a sign-off for B00572508-I1.
The latest status recorded for B00572508-I1 is “LOC Issued.”
DOB recorded a sign-off for B00354205-I1.
The latest status recorded for B00354205-I1 is “LOC Issued.”
DOB recorded a sign-off for B00185122-I1.
The latest status recorded for B00185122-I1 is “LOC Issued.”
Demolition of existing plumbing fixtures and associated piping. Relocation of existing gas riser. Filing B01313426-S2.
Filing B01313426-S2 reached an approved status.
Demolition of mechanical equipment and associated ductwork/piping. Filing B01313426-S1.
DOB lists a first permit date for B01313426-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B01313426-S2 is “Permit Entire.”
Filing B01313426-S1 reached an approved status.
The latest status recorded for B01313426-S1 is “Approved.”
Installation of construction fence and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing B01441849-I1.
DOB lists a first permit date for B01441849-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01441849-I1 is “Permit Entire.”