DOB filing B01295294-S1
Alteration filing at 295 Flatbush Avenue Extension
Building record · BIN 3058406
295 Flatbush Avenue Extension, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3058406
295 Flatbush Avenue Extension
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story health facility built in 1940, on a 10,500 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 33 open notices on record for this building, out of 81 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
30 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3058406. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 7 approved, 3 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 295 Flatbush Avenue Extension.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install water heater. (replace 3 boilers and 2 burners which is being filed under DOB bis pw1 # 321751065). connect to existing gas lines and meter. no change in use, egress or occupancy. Filing B00193944-I1.
Filing B00193944-I1 reached an approved status.
Replace chimney liner. Filing B00319898-I1.
DOB lists a first permit date for B00319898-I1. That is not by itself confirmation of activity on site.
Mechanical modifications taking place on the Basement & 1st floor as per plans filed herewith. No change in use, egress or occupancy. Filing B00353771-I1.
Plumbing modifications taking place on the basement & 1 floor as per plans filed herewith. No change in use, egress or occupancy. Filing B00353778-I1.
Filing B00353778-I1 reached an approved status.
Sprinkler modifications taking place in the basement as per plans filed herewith. No change in use, egress or occupancy. Filing B00353780-I1.
Filing B00353780-I1 reached an approved status.
Filing B00353771-I1 reached an approved status.
DOB lists a first permit date for B00353778-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00353780-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00353771-I1. That is not by itself confirmation of activity on site.
Sprinkler modifications taking place in the basement as per plans filed herewith. No change in use, egress or occupancy. Filing B00353780-P1.
Filing B00353780-P1 reached an approved status.
Replace chimney liner. Filing B00319898-P1.
Filing B00319898-P1 reached an approved status.
DOB recorded a sign-off for B00353778-I1.
DOB recorded a sign-off for B00353780-I1.
Mechanical modifications taking place on the Basement & 1st floor as per plans filed herewith. No change in use, egress or occupancy. Filing B00353771-P1.
Filing B00353771-P1 reached an approved status.
DOB recorded a sign-off for B00353771-I1.
The latest status recorded for B00193944-I1 is “Approved.”
The latest status recorded for B00319898-I1 is “Permit Entire.”
The latest status recorded for B00319898-P1 is “Approved.”
The latest status recorded for B00353771-I1 is “LOC Issued.”
The latest status recorded for B00353771-P1 is “Approved.”
The latest status recorded for B00353778-I1 is “LOC Issued.”
The latest status recorded for B00353780-I1 is “LOC Issued.”
The latest status recorded for B00353780-P1 is “Approved.”
Fort Greene STI Lab Renovation. Filing B01295294-I1.
Interior plumbing work for laboratory and exam room. Filing B01295294-S1.
Filing B01295294-I1 reached an approved status.
The latest status recorded for B01295294-I1 is “Approved.”
Filing B01295294-S1 reached an approved status.
The latest status recorded for B01295294-S1 is “Approved.”