Building record · BIN 3059118

317 Clermont Avenue

317 Clermont Avenue, Brooklyn, NY 11205

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3059118

317 Clermont Avenue

Clinton Hill, Brooklyn

A consolidated public-record view · updated May 15, 2026

DOB filings
6
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings6
Open or active-status records6
First included filingOct 16, 2019
Latest recorded changeMay 15, 2026

The lot

What is already here?

The lot holds a 8-story place of worship built in 1906, on a 19,500 sq ft lot.

  1. Floors 6–8Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 16.3 m. Nothing on that side reaches this floor.
  2. Floors 2–5Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 6 — the tallest thing within 60 m to the south is 16.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 34.7 m over 8 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1906
Floors
8
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R6B
Lot area
19,500 sq ft
Building area
54,150 sq ft
Historic district
Fort Greene Historic District

Owner of record

BROOKLYN MASONIC TEMPLE LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 41 open notices on record for this building, out of 139 notices on file; the most recent was issued Aug 28, 2026.

  • Construction

    Issued Aug 28, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXP# 1,2,3 & 4 CRACKED AND SPALLING, OPEN MORTAR JOINTS IN TERRA COTTA AT MULCIPLE LOCATIONS. REMEDY: REMOVE AND/OR REPAIR DAMGED FACADE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Apr 16, 2025 — EMERGENCY WORK ORDER DUE TO PLYWOOD CONSTRUCTION FENCING IS DAMAGED AND FALLING APART. SECTIONS ARE NOT SECURED AND HAVE FALLEN ON SIDEWALK. REMEDY: IMMEDIATELY REPAIR CONSTRUCTION FENCING UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL

  • 38 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3059118. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 6 alteration filing. Its latest status categories are 6 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 16, 2019
Latest recorded change
May 15, 2026
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 317 Clermont Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of temporary 84' high pipe scaffold originating (off grade)for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00247072-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00247072-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of temporary (72'-84') high pipe scaffold at various levels for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00357782-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00357782-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00357772-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00357772-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00357772-P1.

    07
  8. Alteration filed

    Installation of temporary (72'-84') high pipe scaffold at various levels for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00357782-P1.

    08
  9. Alteration approved

    Filing B00357782-P1 reached an approved status.

    09
  10. Alteration approved

    Filing B00357772-P1 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for B00357772-P1 is “Approved.”

    011
  12. Alteration now approved

    The latest status recorded for B00357782-P1 is “Approved.”

    012
  13. Alteration filed

    Install gas fired unit heater. Filing B00476468-I1.

    013
  14. Alteration approved

    Filing B00476468-I1 reached an approved status.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00476468-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration now approved

    The latest status recorded for B00476468-I1 is “Permit Entire.”

    016
  17. Alteration now approved

    The latest status recorded for B00247072-I1 is “Permit Entire.”

    017
  18. Alteration now approved

    The latest status recorded for B00357772-I1 is “Permit Entire.”

    018
  19. Alteration now approved

    The latest status recorded for B00357782-I1 is “Permit Entire.”

    019