DOB filing B00313430-I1
Alteration filing at 295 Clermont Avenue
Building record · BIN 3059123
295 Clermont Avenue, Brooklyn, NY 11205
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3059123
295 Clermont Avenue
Clinton Hill, Brooklyn
A consolidated public-record view · updated Aug 1, 2024
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story two-family home built in 1867, on a 2,500 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing.
Violation record
No open violations are recorded for this building. 5 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3059123. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 16 alteration filing. Its latest status categories are 7 recorded as completed, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 295 Clermont Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of the scaffolding as per plans filed herewith, no change in use, egress and occupancy. Filing B00329751-I1.
Filing B00329751-I1 reached an approved status.
Renovation of existing wood framed townhouse. New continuous footings, slab on grade and LVL wood beams on floors Cellar, Basement, 1st - 3rd floors and roof. Filed in conjunction with Alt 1 #321595528. No change in use, egress or occupancy. Filing B00313430-I1.
Installation of new sprinkler system filed in conjunction with Alt 1 #321595528. Filing B00313404-I1.
Installation of new VRF based heating and cooling system. Filing B00313391-I1.
Installation of plumbing fixtures and related piping. Filing B00313398-I1.
Installation of construction fence, no change in use, egress and occupancy. Filing B00368709-I1.
Filing B00368709-I1 reached an approved status.
DOB lists a first permit date for B00368709-I1. That is not by itself confirmation of activity on site.
Installation of the scaffolding as per plans filed herewith, no change in use, egress and occupancy. Filing B00329751-P1.
Filing B00329751-P1 reached an approved status.
Filing B00313404-I1 reached an approved status.
Filing B00313398-I1 reached an approved status.
Filing B00313430-I1 reached an approved status.
Filing B00313391-I1 reached an approved status.
DOB lists a first permit date for B00329751-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00313430-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00329751-P1 is “Approved.”
Installation of construction fence, no change in use, egress and occupancy. Filing B00368709-P1.
Filing B00368709-P1 reached an approved status.
The latest status recorded for B00368709-P1 is “Approved.”
DOB lists a first permit date for B00313391-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00464491-I1.
Filing B00464491-I1 reached an approved status.
DOB lists a first permit date for B00464491-I1. That is not by itself confirmation of activity on site.
Installation of temporary 48' high pipe scaffold originating (off grade) as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00508641-I1.
DOB lists a first permit date for B00508641-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00464491-P1.
Filing B00464491-P1 reached an approved status.
The latest status recorded for B00464491-P1 is “Approved.”
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00464491-P2.
Filing B00464491-P2 reached an approved status.
The latest status recorded for B00464491-P2 is “Approved.”
DOB lists a first permit date for B00313398-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00464491-I1 is “Permit Entire.”
DOB lists a first permit date for B00313404-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00508641-I1.
The latest status recorded for B00508641-I1 is “LOC Issued.”
Installation of plumbing fixtures and related piping. Filing B00313398-P1.
Filing B00313398-P1 reached an approved status.
The latest status recorded for B00313398-P1 is “Approved.”
Installation of plumbing fixtures and related piping. Filing B00313398-P2.
Filing B00313398-P2 reached an approved status.
The latest status recorded for B00313398-P2 is “Approved.”
DOB recorded a sign-off for B00329751-I1.
The latest status recorded for B00329751-I1 is “LOC Issued.”
Installation of new sprinkler system filed in conjunction with Alt 1 #321595528. Filing B00313404-P1.
Filing B00313404-P1 reached an approved status.
The latest status recorded for B00313404-P1 is “Approved.”
DOB recorded a sign-off for B00368709-I1.
The latest status recorded for B00368709-I1 is “LOC Issued.”
Installation of new VRF based heating and cooling system. Filing B00313391-P2.
Filing B00313391-P2 reached an approved status.
The latest status recorded for B00313391-P2 is “Approved.”
DOB recorded a sign-off for B00313391-I1.
The latest status recorded for B00313391-I1 is “LOC Issued.”
DOB recorded a sign-off for B00313398-I1.
The latest status recorded for B00313398-I1 is “LOC Issued.”
DOB recorded a sign-off for B00313404-I1.
The latest status recorded for B00313404-I1 is “LOC Issued.”
DOB recorded a sign-off for B00313430-I1.
The latest status recorded for B00313430-I1 is “LOC Issued.”