DOB filing B00317733-I1
Alteration filing at 757 Fulton Street
Building record · BIN 3059340
757 Fulton Street, Brooklyn, NY 11217
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3059340
757 Fulton Street
Fort Greene, Brooklyn
A consolidated public-record view · updated Mar 17, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story mainly residential with some commercial built in 1920, with 4 homes, on a 1,360 sq ft lot.
Owner of record
SUPER SLOTH, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 10 notices on file; the most recent was issued May 22, 2018.
Issued May 22, 2018 — THE DOB INTENDS TO REVOKE ALL PERMITS AND APPROVED UNDER JOB #301843584 DUE TO SUSPENSION OF MASTER PLUMBER'S LICENSE ON ALL PLUMBING WORK. STOP ALL WORK IMMEDIATELY
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3059340. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 3 recorded as completed, 7 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 757 Fulton Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work filed as per plans herewith. In conjunction with Application 321595975. Filing B00317733-I1.
Install mechanical vents in bathrooms. New exhaust hood from hood to roof. Relocate two mini split units to roof. No change to occupancy, use or egress under this application. Filing B00317738-I1.
Filing B00317738-I1 reached an approved status.
Filing B00317733-I1 reached an approved status.
DOB lists a first permit date for B00317738-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00317733-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed as per drawings during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with NYC building code of 2014. Filing B00446485-I1.
DOB lists a first permit date for B00446485-I1. That is not by itself confirmation of activity on site.
Plumbing work filed as per plans herewith. In conjunction with Application 321595975. Filing B00317733-P1.
Installation of heavy duty sidewalk shed as per drawings during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with NYC building code of 2014. Filing B00446485-P1.
Filing B00317733-P1 reached an approved status.
The latest status recorded for B00317733-P1 is “Approved.”
Filing B00446485-P1 reached an approved status.
The latest status recorded for B00446485-P1 is “Approved.”
Installation of heavy duty sidewalk shed as per drawings during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with NYC building code of 2014. Filing B00446485-P2.
Filing B00446485-P2 reached an approved status.
The latest status recorded for B00446485-P2 is “Approved.”
Plumbing work filed as per plans herewith. In conjunction with Application 321595975. Filing B00317733-P2.
Filing B00317733-P2 reached an approved status.
The latest status recorded for B00317733-P2 is “Approved.”
DOB recorded a sign-off for B00446485-I1.
The latest status recorded for B00446485-I1 is “LOC Issued.”
Plumbing work filed as per plans herewith. In conjunction with Application 321595975. Filing B00317733-P3.
Filing B00317733-P3 reached an approved status.
The latest status recorded for B00317733-P3 is “Approved.”
Plumbing work filed as per plans herewith. In conjunction with Application 321595975. Filing B00317733-P4.
Filing B00317733-P4 reached an approved status.
The latest status recorded for B00317733-P4 is “Approved.”
Plumbing work filed as per plans herewith. In conjunction with Application 321595975. Filing B00317733-P5.
Filing B00317733-P5 reached an approved status.
The latest status recorded for B00317733-P5 is “Approved.”
DOB recorded a sign-off for B00317733-I1.
The latest status recorded for B00317733-I1 is “LOC Issued.”
DOB recorded a sign-off for B00317738-I1.
The latest status recorded for B00317738-I1 is “LOC Issued.”