DOB filing B00390622-P3
Alteration filing at 370 Adelphi Street
Building record · BIN 3059448
370 Adelphi Street, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 21 independently sourced records, including 19 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3059448
370 Adelphi Street
Fort Greene, Brooklyn
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story walk-up apartment building built in 1930, with 4 homes, on a 2,200 sq ft lot.
Housing violations
59 violations are open against this address under the Housing Maintenance Code. 15 of them are the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
The apartments
27 condominium apartments are assessed on this block, and the typical one is 1,161 sq ft (108 m²). They run from 70 to 256 m².
The city values the typical one at $341,279. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
3 apartments on this tax block changed hands in the year the city last published, at a median of $1,550,000, from 920,000 to 2,425,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
GARRISON IRREVOCABLE TRUST
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 3 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3059448. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 21 alteration filing. Its latest status categories are 1 under review, 2 recorded as completed, 18 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 370 Adelphi Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 21 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Filing herewith legalization of plumbing work for violation # 35141567h & 35141566x installation of a hot water heater gas fired and boiler work. Filing B00424680-I1.
Filing B00424680-I1 reached an approved status.
Installation of HVAC system as indicated on the drawings. no change in use, egress or occupancy. Filing B00354307-I1.
DOB lists a first permit date for B00424680-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00424680-I1 is “Permit Entire.”
PAA being filed for updated floor layouts and field plumbing changes. Filing B00353525-I1.
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00390622-I1.
Filing B00354307-I1 reached an approved status.
Temporary construction fence installation. Filing B00485604-I1.
Filing B00485604-I1 reached an approved status.
DOB lists a first permit date for B00485604-I1. That is not by itself confirmation of activity on site.
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00475194-I1.
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00475137-I1.
Installation of sprinkler system as indicted on the drawings. Filing B00389400-I1.
Filing B00390622-I1 reached an approved status.
DOB lists a first permit date for B00390622-I1. That is not by itself confirmation of activity on site.
Filing B00389400-I1 reached an approved status.
Filing B00353525-I1 reached an approved status.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00577410-I1.
Filing B00577410-I1 reached an approved status.
DOB lists a first permit date for B00577410-I1. That is not by itself confirmation of activity on site.
Installation of sprinkler system as indicted on the drawings. Filing B00389400-P1.
Filing B00389400-P1 reached an approved status.
The latest status recorded for B00389400-P1 is “Approved.”
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00623634-I1.
Filing B00623634-I1 reached an approved status.
DOB lists a first permit date for B00623634-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00623634-I1 is “Permit Entire.”
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00390622-P1.
Filing B00475194-I1 reached an approved status.
Filing B00390622-P1 reached an approved status.
The latest status recorded for B00390622-P1 is “Approved.”
DOB lists a first permit date for B00475194-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00354307-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00353525-I1. That is not by itself confirmation of activity on site.
Filing B00475137-I1 reached an approved status.
DOB lists a first permit date for B00475137-I1. That is not by itself confirmation of activity on site.
PAA being filed for updated floor layouts and field plumbing changes. Filing B00353525-P1.
Filing B00353525-P1 reached an approved status.
The latest status recorded for B00353525-P1 is “Approved.”
The latest status recorded for B00577410-I1 is “Permit Entire.”
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00390622-P2.
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00475194-P1.
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00475137-P1.
The latest status recorded for B00475137-I1 is “Permit Entire.”
Filing B00475137-P1 reached an approved status.
The latest status recorded for B00475137-P1 is “Approved.”
Filing B00475194-P1 reached an approved status.
The latest status recorded for B00390622-I1 is “Permit Entire.”
Filing B00390622-P2 reached an approved status.
The latest status recorded for B00390622-P2 is “Approved.”
The latest status recorded for B00475194-P1 is “Approved.”
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00475194-P2.
The latest status recorded for B00475194-I1 is “Permit Entire.”
Filing B00475194-P2 reached an approved status.
The latest status recorded for B00475194-P2 is “Approved.”
DOB lists a first permit date for B00389400-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00485604-I1 is “Permit Entire.”
Installation of HVAC system as indicated on the drawings. no change in use, egress or occupancy. Filing B00354307-P1.
PAA being filed for updated floor layouts and field plumbing changes. Filing B00353525-P2.
Installation of sprinkler system as indicted on the drawings. Filing B00389400-P2.
Filing B00389400-P2 reached an approved status.
The latest status recorded for B00389400-P2 is “Approved.”
The latest status recorded for B00353525-I1 is “Permit Entire.”
Filing B00353525-P2 reached an approved status.
The latest status recorded for B00353525-P2 is “Approved.”
Filing B00354307-P1 reached an approved status.
The latest status recorded for B00354307-P1 is “Approved.”
DOB recorded a sign-off for B00389400-I1.
The latest status recorded for B00389400-I1 is “LOC Issued.”
DOB recorded a sign-off for B00354307-I1.
The latest status recorded for B00354307-I1 is “LOC Issued.”
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear. Filing B00390622-P3.
The latest status recorded for B00390622-P3 is “Plan Examiner Review.”