240 Broadway, Brooklyn, NY 11211
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story office building built in 1910, with 24 homes, on a 8,875 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 5, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 7 open notices on record for this building, out of 38 notices on file; the most recent was issued Dec 1, 2024.
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Issued Feb 2, 2020 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Issued Nov 2, 2019 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
4 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 5, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3059648. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 9 alteration filing. Its latest status categories are 8 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 240 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00353746-I1.
Filing B00353746-I1 reached an approved status.
DOB lists a first permit date for B00353746-I1. That is not by itself confirmation of activity on site.
General construction work on cellar, floor 1 thru 5 and penthouse, in conjunction with change of use on floors 2-5 from residential to office. Filing B00491449-I1.
Filing B00491449-I1 reached an approved status.
DOB lists a first permit date for B00491449-I1. That is not by itself confirmation of activity on site.
Proposed mechanical system in conjunction with Alt-1 321599855. Filing B00491449-S1.
Plumbing, Sprinkler and Standpipe filing. Filing B00491449-S2.
Proposed structural work as per plans. Filing B00491449-S4.
Filing B00491449-S4 reached an approved status.
Filing B00491449-S1 reached an approved status.
Filing B00491449-S2 reached an approved status.
DOB lists a first permit date for B00491449-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00491449-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00491449-S1. That is not by itself confirmation of activity on site.
General construction work on cellar, floor 1 thru 5 and penthouse, in conjunction with change of use on floors 2-5 from residential to office. Filing B00491449-P9.
DOB recorded a sign-off for B00353746-I1.
The latest status recorded for B00353746-I1 is “LOC Issued.”
Filing B00491449-P9 reached an approved status.
The latest status recorded for B00491449-P9 is “Approved.”
The latest status recorded for B00491449-I1 is “Permit Entire.”
The latest status recorded for B00491449-S4 is “Permit Entire.”
Proposed mechanical system in conjunction with Alt-1 321599855. Filing B00491449-A3.
Plumbing, Sprinkler and Standpipe filing. Filing B00491449-A4.
Filing B00491449-A4 reached an approved status.
The latest status recorded for B00491449-A4 is “Approved.”
Filing B00491449-A3 reached an approved status.
The latest status recorded for B00491449-A3 is “Approved.”
The latest status recorded for B00491449-S2 is “Permit Entire.”
Proposed mechanical system in conjunction with Alt-1 321599855. Filing B00491449-A6.
Filing B00491449-A6 reached an approved status.
The latest status recorded for B00491449-A6 is “Approved.”
The latest status recorded for B00491449-S1 is “Permit Entire.”