Building record · BIN 3061070

488 Broadway

488 Broadway, Brooklyn, NY 11211

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
488 Broadway building dossier graphic showing matched DOB filings and current record counts
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records2
First included filingDec 19, 2025
Latest recorded changeSep 3, 2026

The lot

What is already here?

The lot holds a vacant land on a 6,216 sq ft lot.

Last altered
2025
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
C8-2
Lot area
6,216 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 5, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 19 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • 3 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 5, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3061070. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 new building. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 19, 2025
Latest recorded change
Sep 3, 2026
Highest proposed story count
8 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 488 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Structural work type hereby filed subsequent to the NB GC application: B01081716-I1. Filing B01081716-S5.

    01
  2. New building filed

    Foundation work type hereby filed subsequent to the NB GC application: B01081716-I1. Filing B01081716-S7.

    02
  3. New building approved

    Filing B01081716-S5 reached an approved status.

    03
  4. New building approved

    Filing B01081716-S7 reached an approved status.

    04
  5. Permit recorded for new building

    DOB lists a first permit date for B01081716-S5. That is not by itself confirmation of activity on site.

    05
  6. New building now approved

    The latest status recorded for B01081716-S5 is “Permit Entire.”

    06
  7. Permit recorded for new building

    DOB lists a first permit date for B01081716-S7. That is not by itself confirmation of activity on site.

    07
  8. New building now approved

    The latest status recorded for B01081716-S7 is “Permit Entire.”

    08