DOB filing B01158934-I1
Alteration filing at 144 Greenpoint Avenue
Building record · BIN 3064831
144 Greenpoint Avenue, Brooklyn, NY 11222
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3064831
144 Greenpoint Avenue
Greenpoint, Brooklyn
A consolidated public-record view · updated Oct 2, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story store building built in 1898, on a 7,600 sq ft lot.
The apartments
50 condominium apartments are assessed on this block, and the typical one is 722 sq ft (67 m²). They run from 49 to 126 m².
The city values the typical one at $187,574. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
Owner of record
EPPY RESIDENCES LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 5, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 5 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3064831. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing. Its latest status categories are 2 under review, 1 approved, 5 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 144 Greenpoint Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Removal of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application. Filing B00597096-I1.
Filing B00597096-I1 reached an approved status.
Removal of all HVAC and associated duct as per plans filed herewith. No change in use, egress or occupancy under this application. Filing B00597865-I1.
Removal of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. Filing B00597869-I1.
Filing B00597865-I1 reached an approved status.
Filing B00597869-I1 reached an approved status.
DOB lists a first permit date for B00597096-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00597869-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00597865-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00597869-I1.
The latest status recorded for B00597869-I1 is “LOC Issued.”
DOB recorded a sign-off for B00597865-I1.
The latest status recorded for B00597865-I1 is “LOC Issued.”
DOB recorded a sign-off for B00597096-I1.
The latest status recorded for B00597096-I1 is “LOC Issued.”
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2022 code. Filing B01235657-I1.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application. Filing B01235690-I1.
DOB lists a first permit date for B01235657-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01235690-I1. That is not by itself confirmation of activity on site.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2022 code. Filing B01411458-I1.
DOB lists a first permit date for B01411458-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B01235657-I1.
The latest status recorded for B01235657-I1 is “LOC Issued.”
DOB recorded a sign-off for B01235690-I1.
The latest status recorded for B01235690-I1 is “LOC Issued.”
The latest status recorded for B01411458-I1 is “Permit Entire.”
Support of Excavation work-type filed in conjunction with Alt-CO NB application; job number: B00651015-I1. Filing B01158931-I1.
Foundation / Earthwork work-types filed subsequent to Alt-CO NB application; job number: B00651015-I1. Filing B01158934-I1.
The latest status recorded for B01158931-I1 is “Objections.”
The latest status recorded for B01158934-I1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”