Building record · BIN 3071421

225 Seigel Street

225 Seigel Street, Brooklyn, NY 11206

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3071421

225 Seigel Street

East Williamsburg, Brooklyn

A consolidated public-record view · updated Oct 20, 2026

DOB filings
13
Active-status
13
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings13
Open or active-status records13
First included filingApr 13, 2026
Latest recorded changeOct 20, 2026

The lot

What is already here?

The lot holds a 2-story place of worship built in 1931, on a 38,160 sq ft lot.

Built
1931
Last altered
1998
Floors
2
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R6
Lot area
38,160 sq ft
Building area
27,830 sq ft

Owner of record

DEPARTMENT OF EDUCATION

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 8 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3071421. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing, 3 full demolition, 8 new building. Its latest status categories are 5 approved, 8 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 13, 2026
Latest recorded change
Oct 20, 2026
Highest proposed story count
12 stories
Highest proposed unit count
67 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 225 Seigel Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Demolition filed

    Full Demolition of existing building. Filing B01377643-I1.

    01
  2. Alteration filed

    Installation of an 8 foot construction fence. Filing B01377647-I1.

    02
  3. Alteration approved

    Filing B01377647-I1 reached an approved status.

    03
  4. Demolition filed

    Filing Mechanical Equipment Use On Grade In Conjunction with Full Mechanical Demolition Phase Under job# B01377643-I1. Filing B01377643-S1.

    04
  5. Demolition approved

    Filing B01377643-S1 reached an approved status.

    05
  6. Demolition approved

    Filing B01377643-I1 reached an approved status.

    06
  7. New building filed

    Proposed 12 story building community facility and residential hub consultation conducted on 7.13. Filing B01420384-I1.

    07
  8. Demolition filed

    Full Demolition of existing building. Filing B01377643-P1.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B01377647-I1. That is not by itself confirmation of activity on site.

    09
  10. New building filed

    Subsequent filing for SOE work. Filing B01420384-S6.

    010
  11. New building filed

    Subsequent filing for sprinkler and standpipe. Filing B01420384-S5.

    011
  12. New building filed

    Mechanical work. Filing B01420384-S2.

    012
  13. New building filed

    Plumbing work. Filing B01420384-S4.

    013
  14. New building filed

    Structural work. Filing B01420384-S7.

    014
  15. New building filed

    Foundation work. Filing B01420384-S8.

    015
  16. Demolition approved

    Filing B01377643-P1 reached an approved status.

    016
  17. Demolition now approved

    The latest status recorded for B01377643-P1 is “Approved.”

    017
  18. New building filed

    Installation of temporary standpipe system. Filing B01420384-S9.

    018
  19. New building now under review

    The latest status recorded for B01420384-I1 is “Objections.”

    019
  20. New building now under review

    The latest status recorded for B01420384-S8 is “Objections.”

    020
  21. New building now under review

    The latest status recorded for B01420384-S7 is “Objections.”

    021
  22. New building now under review

    The latest status recorded for B01420384-S2 is “Objections.”

    022
  23. New building now under review

    The latest status recorded for B01420384-S4 is “Objections.”

    023
  24. New building now under review

    The latest status recorded for B01420384-S6 is “Plan Examiner Review.”

    024
  25. New building now under review

    The latest status recorded for B01420384-S9 is “Plan Examiner Review.”

    025
  26. New building now under review

    The latest status recorded for B01420384-S5 is “Plan Examiner Review.”

    026
  27. Alteration filed

    Installation of an 8 foot construction fence. Filing B01377647-P2.

    027
  28. Permit recorded for demolition

    DOB lists a first permit date for B01377643-I1. That is not by itself confirmation of activity on site.

    028
  29. Demolition now approved

    The latest status recorded for B01377643-I1 is “Permit Entire.”

    029
  30. Permit recorded for demolition

    DOB lists a first permit date for B01377643-S1. That is not by itself confirmation of activity on site.

    030
  31. Demolition now approved

    The latest status recorded for B01377643-S1 is “Permit Entire.”

    031
  32. Alteration approved

    Filing B01377647-P2 reached an approved status.

    032
  33. Alteration now approved

    The latest status recorded for B01377647-P2 is “Approved.”

    033
  34. Alteration now approved

    The latest status recorded for B01377647-I1 is “Permit Entire.”

    034