DOB filing B00344958-I1
Alteration filing at 613 Bushwick Avenue
Building record · BIN 3072022
613 Bushwick Avenue, Brooklyn, NY 11206
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 26 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3072022
613 Bushwick Avenue
Bushwick (West), Brooklyn
A consolidated public-record view · updated Nov 3, 2023
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 1-story store building built in 1931, on a 6,751 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3072022. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 26 alteration filing. Its latest status categories are 11 recorded as completed, 15 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 613 Bushwick Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 26 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed installation of wood construction fence as per plans filed herewith. no change to use, egress or occupancy. Filing B00003682-I1.
DOB lists a first permit date for B00003682-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction fence. Filing B00092052-I1.
DOB lists a first permit date for B00092052-I1. That is not by itself confirmation of activity on site.
Mechanical work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344958-I1.
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344971-I1.
Sprinkler system filed in conjunction with Alteration type 1 application 321590710. Filing B00344980-I1.
Structural work as shown on plans in conjunction with Alt-1 321590710. Said Alt-1 application has been filed to meet New Building requirements. Filing B00345051-I1.
Filing B00344958-I1 reached an approved status.
Filing B00344971-I1 reached an approved status.
17' wide Curb Cut application on Bushwick avenue. Filed in conjunction with Alt-1 321590710. Filing B00375392-I1.
17' wide Curb Cut application on Stanwix street. Filed in conjunction with Alt-1 321590710. Filing B00375396-I1.
Filing B00345051-I1 reached an approved status.
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344971-P1.
Filing B00344971-P1 reached an approved status.
Mechanical work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344958-P1.
Filing B00344958-P1 reached an approved status.
Foundation work as shown on plans,. Filed in conjunction with Alt-1 321590710. Support of excavation filed under B00547261. Filing B00529488-I1.
SOE IN CONJUNCTION WITH ALTERATION 321590710 and Foundation # B00529488-I1. Filing B00547261-I1.
Structural work as shown on plans in conjunction with Alt-1 321590710. Said Alt-1 application has been filed to meet New Building requirements. Filing B00345051-P1.
Filing B00547261-I1 reached an approved status.
Filing B00529488-I1 reached an approved status.
Filing B00345051-P1 reached an approved status.
The latest status recorded for B00345051-P1 is “Approved.”
Filing B00375396-I1 reached an approved status.
Filing B00375392-I1 reached an approved status.
DOB lists a first permit date for B00344958-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00345051-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00529488-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00547261-I1. That is not by itself confirmation of activity on site.
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. Filing B00586380-I1.
DOB lists a first permit date for B00586380-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00344971-I1. That is not by itself confirmation of activity on site.
Filing B00344980-I1 reached an approved status.
DOB lists a first permit date for B00344980-I1. That is not by itself confirmation of activity on site.
Structural work as shown on plans in conjunction with Alt-1 321590710. Said Alt-1 application has been filed to meet New Building requirements. Filing B00345051-P7.
Foundation work as shown on plans,. Filed in conjunction with Alt-1 321590710. Support of excavation filed under B00547261. Filing B00529488-P1.
Filing B00529488-P1 reached an approved status.
The latest status recorded for B00529488-P1 is “Approved.”
Filing B00345051-P7 reached an approved status.
The latest status recorded for B00345051-P7 is “Approved.”
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344971-P2.
Filing B00344971-P2 reached an approved status.
The latest status recorded for B00344971-P2 is “Approved.”
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344971-P3.
Filing B00344971-P3 reached an approved status.
The latest status recorded for B00344971-P3 is “Approved.”
DOB recorded a sign-off for B00586380-I1.
The latest status recorded for B00586380-I1 is “LOC Issued.”
DOB recorded a sign-off for B00547261-I1.
The latest status recorded for B00547261-I1 is “LOC Issued.”
DOB recorded a sign-off for B00345051-I1.
The latest status recorded for B00345051-I1 is “LOC Issued.”
DOB recorded a sign-off for B00529488-I1.
The latest status recorded for B00529488-I1 is “LOC Issued.”
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344971-P4.
Sprinkler system filed in conjunction with Alteration type 1 application 321590710. Filing B00344980-P1.
Filing B00344980-P1 reached an approved status.
The latest status recorded for B00344980-P1 is “Approved.”
Filing B00344971-P4 reached an approved status.
The latest status recorded for B00344971-P4 is “Approved.”
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344971-P5.
Filing B00344971-P5 reached an approved status.
The latest status recorded for B00344971-P5 is “Approved.”
DOB lists a first permit date for B00375392-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00375396-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00003682-I1.
The latest status recorded for B00003682-I1 is “LOC Issued.”
Mechanical work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344958-P2.
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344971-P6.
Filing B00344958-P2 reached an approved status.
The latest status recorded for B00344958-P2 is “Approved.”
Sprinkler system filed in conjunction with Alteration type 1 application 321590710. Filing B00344980-P2.
The latest status recorded for B00344971-P1 is “Approved.”
Filing B00344971-P6 reached an approved status.
The latest status recorded for B00344971-P6 is “Approved.”
Filing B00344980-P2 reached an approved status.
The latest status recorded for B00344980-P2 is “Approved.”
DOB recorded a sign-off for B00375392-I1.
The latest status recorded for B00375392-I1 is “LOC Issued.”
DOB recorded a sign-off for B00375396-I1.
The latest status recorded for B00375396-I1 is “LOC Issued.”
DOB recorded a sign-off for B00092052-I1.
The latest status recorded for B00092052-I1 is “LOC Issued.”
Sprinkler system filed in conjunction with Alteration type 1 application 321590710. Filing B00344980-P3.
Filing B00344980-P3 reached an approved status.
The latest status recorded for B00344980-P3 is “Approved.”
DOB recorded a sign-off for B00344980-I1.
The latest status recorded for B00344980-I1 is “LOC Issued.”
DOB recorded a sign-off for B00344971-I1.
The latest status recorded for B00344971-I1 is “LOC Issued.”
Mechanical work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements. Filing B00344958-P3.
The latest status recorded for B00344958-P1 is “Approved.”
Filing B00344958-P3 reached an approved status.
The latest status recorded for B00344958-P3 is “Approved.”
DOB recorded a sign-off for B00344958-I1.
The latest status recorded for B00344958-I1 is “LOC Issued.”