DOB filing B00472417-I1
Alteration filing at 1329 Willoughby Avenue
Building record · BIN 3072801
1329 Willoughby Avenue, Brooklyn, NY 11237
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 24 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3072801
1329 Willoughby Avenue
Bushwick (West), Brooklyn
A consolidated public-record view · updated Dec 23, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story store building built in 1931, on a 24,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 15 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3072801. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 24 alteration filing. Its latest status categories are 13 recorded as completed, 10 approved, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1329 Willoughby Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 24 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install a new gas meter to connect a existing gas boiler in conjunction with the alt1#320908728 at cellar as per plan, no change in use, egress or occupancy under this application. Filing B00310347-I1.
Filing B00310347-I1 reached an approved status.
DOB lists a first permit date for B00310347-I1. That is not by itself confirmation of activity on site.
Plumbing modifications for interior restaurant. No change to use, egress or occupancy. Filing B00376807-I1.
Modification of HVAC system with ductwork and installation of (5) Units on the roof. Filing B00376868-I1.
Installation of sprinkler system for new restaurant. No change to use, egress or occupancy. Filing B00376821-I1.
Filing B00376868-I1 reached an approved status.
Filing B00376821-I1 reached an approved status.
Filing B00376807-I1 reached an approved status.
DOB lists a first permit date for B00376807-I1. That is not by itself confirmation of activity on site.
To obtain only Equipment Use permit on Rooftop Condensing unit that was filed under Alt 321835653. No work will be performed in this application. Filing B00415100-I1.
Filing B00415100-I1 reached an approved status.
DOB lists a first permit date for B00415100-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00376821-I1. That is not by itself confirmation of activity on site.
Plumbing modifications for interior restaurant. No change to use, egress or occupancy. Filing B00376807-P1.
Installation of sprinkler system for new restaurant. No change to use, egress or occupancy. Filing B00376821-P1.
Filing B00376821-P1 reached an approved status.
Filing B00376807-P1 reached an approved status.
The latest status recorded for B00376807-P1 is “Approved.”
The latest status recorded for B00376821-P1 is “Approved.”
DOB recorded a sign-off for B00310347-I1.
The latest status recorded for B00310347-I1 is “LOC Issued.”
Mechanical work for SPACE #3 - MONKEY KING ONLY. Filing B00441161-I1.
Modification of sprinkler system for SPACE #3 - MONKEY KING ONLY. Filing B00441193-I1.
Plumbing work for SPACE #3 - MONKEY KING ONLY. Filing B00441174-I1.
Structural work for space #3 - MONKEY KING ONLY. In conjunction with alt-2# 340799755. Filing B00460059-I1.
Filing B00441161-I1 reached an approved status.
Filing B00441193-I1 reached an approved status.
Filing B00441174-I1 reached an approved status.
Filing B00460059-I1 reached an approved status.
DOB lists a first permit date for B00441174-I1. That is not by itself confirmation of activity on site.
Modification of plumbing and sprinkler fixtures for space 1 - rigolo presmises only.no change in use, egress or occupancy. Filing B00472417-I1.
Interior renovation for space 1 - rigolo premises only. no change in use, egress or occupancy. Filing B00472377-I1.
DOB lists a first permit date for B00441161-I1. That is not by itself confirmation of activity on site.
Filing B00472417-I1 reached an approved status.
Filing B00472377-I1 reached an approved status.
DOB lists a first permit date for B00441193-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00415100-I1.
The latest status recorded for B00415100-I1 is “LOC Issued.”
DOB lists a first permit date for B00472417-I1. That is not by itself confirmation of activity on site.
Scope of work is to repair previously fire damaged floor joist of the rear portion of the 2nd floor, no change to use egress or occupancy. Monkey King Space 3 only. Filing B00504070-I1.
Filing B00504070-I1 reached an approved status.
DOB lists a first permit date for B00504070-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00504070-I1.
The latest status recorded for B00504070-I1 is “LOC Issued.”
Replace interior plumhing, drainage piping and housetraps. Filing B00534049-I1.
Filing B00534049-I1 reached an approved status.
DOB lists a first permit date for B00534049-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00472377-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00376868-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00534049-I1.
The latest status recorded for B00534049-I1 is “LOC Issued.”
DOB lists a first permit date for B00460059-I1. That is not by itself confirmation of activity on site.
Structural work for space #3 - MONKEY KING ONLY. In conjunction with alt-2# 340799755. Filing B00460059-P1.
Filing B00460059-P1 reached an approved status.
The latest status recorded for B00460059-P1 is “Approved.”
DOB recorded a sign-off for B00460059-I1.
The latest status recorded for B00460059-I1 is “LOC Issued.”
Plumbing work for SPACE #3 - MONKEY KING ONLY. Filing B00441174-P1.
Filing B00441174-P1 reached an approved status.
The latest status recorded for B00441174-P1 is “Approved.”
DOB recorded a sign-off for B00376821-I1.
The latest status recorded for B00376821-I1 is “LOC Issued.”
DOB recorded a sign-off for B00441174-I1.
The latest status recorded for B00441174-I1 is “LOC Issued.”
Modification of sprinkler system for SPACE #3 - MONKEY KING ONLY. Filing B00441193-P1.
Filing B00441193-P1 reached an approved status.
The latest status recorded for B00441193-P1 is “Approved.”
Mechanical work for SPACE #3 - MONKEY KING ONLY. Filing B00441161-P1.
Filing B00441161-P1 reached an approved status.
The latest status recorded for B00441161-P1 is “Approved.”
DOB recorded a sign-off for B00441193-I1.
The latest status recorded for B00441193-I1 is “LOC Issued.”
Mechanical work for SPACE #3 - MONKEY KING ONLY. Filing B00441161-P2.
Filing B00441161-P2 reached an approved status.
The latest status recorded for B00441161-P2 is “Approved.”
DOB recorded a sign-off for B00441161-I1.
The latest status recorded for B00441161-I1 is “LOC Issued.”
Modification of HVAC system with ductwork and installation of (5) Units on the roof. Filing B00376868-P1.
Filing B00376868-P1 reached an approved status.
The latest status recorded for B00376868-P1 is “Approved.”
DOB recorded a sign-off for B00376868-I1.
The latest status recorded for B00376868-I1 is “LOC Issued.”
DOB recorded a sign-off for B00376807-I1.
The latest status recorded for B00376807-I1 is “LOC Issued.”
Interior renovation for space 1 - rigolo premises only. no change in use, egress or occupancy. Filing B00472377-P1.
Filing B00472377-P1 reached an approved status.
The latest status recorded for B00472377-P1 is “Approved.”
The latest status recorded for B00034200-I1 is “Filing Withdrawn.”
Modification of plumbing and sprinkler fixtures for space 1 - rigolo presmises only.no change in use, egress or occupancy. Filing B00472417-P1.
Filing B00472417-P1 reached an approved status.
The latest status recorded for B00472417-P1 is “Approved.”
DOB recorded a sign-off for B00472417-I1.
The latest status recorded for B00472417-I1 is “LOC Issued.”
DOB recorded a sign-off for B00472377-I1.
The latest status recorded for B00472377-I1 is “LOC Issued.”