DOB filing B00344051-I1
Alteration filing at 385 Harman Street
Building record · BIN 3074867
385 Harman Street, Brooklyn, NY 11237
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3074867
385 Harman Street
Bushwick (West), Brooklyn
A consolidated public-record view · updated Dec 21, 2021
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3074867. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 6 recorded as completed, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 385 Harman Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Filed plumbing work in conjunction with nb job #321595662. Filing B00340612-I1.
Filing of mechanical work in conjunction with nb #321595662. Filing B00340635-I1.
Filing B00340612-I1 reached an approved status.
Filing B00340635-I1 reached an approved status.
Install temp. construction fence. filed in conjunction with dm #322009571 and nb#321595662. Filing B00308386-I1.
Filing B00308386-I1 reached an approved status.
DOB lists a first permit date for B00308386-I1. That is not by itself confirmation of activity on site.
Filed structural work for a 4-story with penthouse attached multi-family building. Filing B00391576-I1.
Filing of sprinkler work in conjunction with nb #321595662. Filing B00344051-I1.
Filing B00344051-I1 reached an approved status.
Filing B00391576-I1 reached an approved status.
Installation of heavy duty sidewalk shed during bldg demolition, filed separately. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00397402-I1.
DOB lists a first permit date for B00397402-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00397402-I1.
The latest status recorded for B00397402-I1 is “LOC Issued.”
Filed structural work for a 4-story with penthouse attached multi-family building. Filing B00391576-P1.
Filing B00391576-P1 reached an approved status.
The latest status recorded for B00391576-P1 is “Approved.”
DOB lists a first permit date for B00340612-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00340635-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00391576-I1. That is not by itself confirmation of activity on site.
Filed plumbing work in conjunction with nb job #321595662. Filing B00340612-P1.
Filing of sprinkler work in conjunction with nb #321595662. Filing B00344051-P1.
Filing of mechanical work in conjunction with nb #321595662. Filing B00340635-P1.
Filing B00340635-P1 reached an approved status.
The latest status recorded for B00340635-P1 is “Approved.”
Filing B00340612-P1 reached an approved status.
The latest status recorded for B00340612-P1 is “Approved.”
Filing B00344051-P1 reached an approved status.
The latest status recorded for B00344051-P1 is “Approved.”
DOB lists a first permit date for B00344051-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00308386-I1.
The latest status recorded for B00308386-I1 is “LOC Issued.”
DOB recorded a sign-off for B00340612-I1.
The latest status recorded for B00340612-I1 is “LOC Issued.”
DOB recorded a sign-off for B00340635-I1.
The latest status recorded for B00340635-I1 is “LOC Issued.”
DOB recorded a sign-off for B00391576-I1.
The latest status recorded for B00391576-I1 is “LOC Issued.”
DOB recorded a sign-off for B00344051-I1.
The latest status recorded for B00344051-I1 is “LOC Issued.”