DOB filing B00217789-I1
Alteration filing at 1096 Greene Avenue
Building record · BIN 3075282
1096 Greene Avenue, Brooklyn, NY 11221
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3075282
1096 Greene Avenue
Bushwick (East), Brooklyn
A consolidated public-record view · updated Jun 10, 2021
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3075282. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 5 alteration filing. Its latest status categories are 2 recorded as completed, 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1096 Greene Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
At cellar installation of FD at cellar; S/S; Washer-Dryer Combo; sump pump; relocation of kitchen equipment at basement and first floor. Replacement of existing bathroom fixtures on Basement & Second floor. Filing B00217789-I1.
Filing B00217789-I1 reached an approved status.
Installation of mechanical HVAC split system through out building. Filing B00229005-I1.
Filing B00229005-I1 reached an approved status.
DOB lists a first permit date for B00217789-I1. That is not by itself confirmation of activity on site.
At cellar installation of FD at cellar; S/S; Washer-Dryer Combo; sump pump; relocation of kitchen equipment at basement and first floor. Replacement of existing bathroom fixtures on Basement & Second floor. Filing B00217789-P1.
Filing B00217789-P1 reached an approved status.
At cellar installation of FD at cellar; S/S; Washer-Dryer Combo; sump pump; relocation of kitchen equipment at basement and first floor. Replacement of existing bathroom fixtures on Basement & Second floor. Filing B00217789-P2.
Filing B00217789-P2 reached an approved status.
At cellar installation of FD at cellar; S/S; Washer-Dryer Combo; sump pump; relocation of kitchen equipment at basement and first floor. Replacement of existing bathroom fixtures on Basement & Second floor. Filing B00217789-P3.
Filing B00217789-P3 reached an approved status.
DOB lists a first permit date for B00229005-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00217789-P1 is “Approved.”
The latest status recorded for B00217789-P2 is “Approved.”
The latest status recorded for B00217789-P3 is “Approved.”
DOB recorded a sign-off for B00229005-I1.
The latest status recorded for B00229005-I1 is “LOC Issued.”
DOB recorded a sign-off for B00217789-I1.
The latest status recorded for B00217789-I1 is “LOC Issued.”