DOB filing B00049397-I1
Alteration filing at 1178 Greene Avenue
Building record · BIN 3075360
1178 Greene Avenue, Brooklyn, NY 11221
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 0 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3075360
1178 Greene Avenue
Bushwick (East), Brooklyn
A consolidated public-record view · updated Dec 28, 2020
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a condominium built in 2019, with 5 homes, on a 1,875 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3075360. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1178 Greene Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00049397-I1.
DOB lists a first permit date for B00049397-I1. That is not by itself confirmation of activity on site.
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00079201-I1.
DOB lists a first permit date for B00079201-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00079201-I1.
DOB recorded a sign-off for B00049397-I1.
The latest status recorded for B00049397-I1 is “LOC Issued.”
The latest status recorded for B00079201-I1 is “LOC Issued.”