DOB filing B00781248-P2
Alteration filing at 970 Vermont Street
Building record · BIN 3097873
970 Vermont Street, Brooklyn, NY 11207
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3097873
970 Vermont Street
East New York-New Lots, Brooklyn
A consolidated public-record view · updated Sep 10, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story educational building built in 1964, on a 98,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 5 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3097873. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 1 under review, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 970 Vermont Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Oil Tanks Removal, Boiler Room Upgrade. Filing B00488224-I1.
Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-S1.
Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Boiler Room Upgrade. Filing B00488224-S2.
Filing B00488224-S1 reached an approved status.
Filing B00488224-S2 reached an approved status.
Filing B00488224-I1 reached an approved status.
DOB lists a first permit date for B00488224-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00488224-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00488224-I1. That is not by itself confirmation of activity on site.
Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Oil Tanks Removal, Boiler Room Upgrade. Filing B00488224-P1.
Filing B00488224-P1 reached an approved status.
The latest status recorded for B00488224-P1 is “Approved.”
Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P2.
Filing B00488224-P2 reached an approved status.
The latest status recorded for B00488224-P2 is “Approved.”
The latest status recorded for B00488224-I1 is “Permit Entire.”
Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Boiler Room Upgrade. Filing B00488224-P3.
Filing B00488224-P3 reached an approved status.
The latest status recorded for B00488224-P3 is “Approved.”
Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P4.
Filing B00488224-P4 reached an approved status.
The latest status recorded for B00488224-P4 is “Approved.”
The latest status recorded for B00488224-S2 is “Permit Entire.”
Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P5.
Filing B00488224-P5 reached an approved status.
The latest status recorded for B00488224-P5 is “Approved.”
Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P6.
Filing B00488224-P6 reached an approved status.
The latest status recorded for B00488224-P6 is “Approved.”
The latest status recorded for B00488224-S1 is “Permit Entire.”
Mechanical. Filing B00781248-P2.
The latest status recorded for B00781248-P2 is “Objections.”