Building record · BIN 3097873

970 Vermont Street

970 Vermont Street, Brooklyn, NY 11207

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3097873

970 Vermont Street

East New York-New Lots, Brooklyn

A consolidated public-record view · updated Sep 10, 2026

DOB filings
10
Active-status
10
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings10
Open or active-status records10
First included filingMar 24, 2021
Latest recorded changeSep 10, 2026

The lot

What is already here?

The lot holds a 3-story educational building built in 1964, on a 98,000 sq ft lot.

Built
1964
Floors
3
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R5
Lot area
98,000 sq ft
Building area
38,706 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 5 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3097873. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 alteration filing. Its latest status categories are 1 under review, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 24, 2021
Latest recorded change
Sep 10, 2026
Highest proposed story count
4 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 970 Vermont Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Oil Tanks Removal, Boiler Room Upgrade. Filing B00488224-I1.

    01
  2. Alteration filed

    Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-S1.

    02
  3. Alteration filed

    Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Boiler Room Upgrade. Filing B00488224-S2.

    03
  4. Alteration approved

    Filing B00488224-S1 reached an approved status.

    04
  5. Alteration approved

    Filing B00488224-S2 reached an approved status.

    05
  6. Alteration approved

    Filing B00488224-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B00488224-S2. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00488224-S1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00488224-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Oil Tanks Removal, Boiler Room Upgrade. Filing B00488224-P1.

    010
  11. Alteration approved

    Filing B00488224-P1 reached an approved status.

    011
  12. Alteration now approved

    The latest status recorded for B00488224-P1 is “Approved.”

    012
  13. Alteration filed

    Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P2.

    013
  14. Alteration approved

    Filing B00488224-P2 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for B00488224-P2 is “Approved.”

    015
  16. Alteration now approved

    The latest status recorded for B00488224-I1 is “Permit Entire.”

    016
  17. Alteration filed

    Boiler Burner Replacement, Oil to Gas Conversion, Chimney Liner, Boiler Room Upgrade. Filing B00488224-P3.

    017
  18. Alteration approved

    Filing B00488224-P3 reached an approved status.

    018
  19. Alteration now approved

    The latest status recorded for B00488224-P3 is “Approved.”

    019
  20. Alteration filed

    Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P4.

    020
  21. Alteration approved

    Filing B00488224-P4 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for B00488224-P4 is “Approved.”

    022
  23. Alteration now approved

    The latest status recorded for B00488224-S2 is “Permit Entire.”

    023
  24. Alteration filed

    Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P5.

    024
  25. Alteration approved

    Filing B00488224-P5 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B00488224-P5 is “Approved.”

    026
  27. Alteration filed

    Subsequent filing for boiler burner conversion work. plumbing work includes but is not limited to: new gas piping, gas meters, city water piping, and rpz. Filing B00488224-P6.

    027
  28. Alteration approved

    Filing B00488224-P6 reached an approved status.

    028
  29. Alteration now approved

    The latest status recorded for B00488224-P6 is “Approved.”

    029
  30. Alteration now approved

    The latest status recorded for B00488224-S1 is “Permit Entire.”

    030
  31. Alteration filed

    Mechanical. Filing B00781248-P2.

    031
  32. Alteration now under review

    The latest status recorded for B00781248-P2 is “Objections.”

    032