DOB filing B01027713-P2
Alteration filing at 1266 Croton Loop
Building record · BIN 3098293
1266 Croton Loop, Brooklyn, NY 11239
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3098293
1266 Croton Loop
Spring Creek-Starrett City, Brooklyn
A consolidated public-record view · updated Sep 24, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 4-story garage or fuel station built in 1973, on a 72,450 sq ft lot.
Owner of record
NEHEMIAH SPRING CREEK 4C HOUSING DEVELOP MENT FUND
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 10 open notices on record for this building, out of 29 notices on file; the most recent was issued Sep 23, 2024.
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3098293. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 13 alteration filing. Its latest status categories are 9 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1266 Croton Loop.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions. Filing B00343183-I1.
Filing B00343183-I1 reached an approved status.
DOB lists a first permit date for B00343183-I1. That is not by itself confirmation of activity on site.
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions. Filing B00343183-P1.
Filing B00343183-P1 reached an approved status.
DOB recorded a sign-off for B00343183-I1.
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390322-I1.
Filing B00390322-I1 reached an approved status.
DOB lists a first permit date for B00390322-I1. That is not by itself confirmation of activity on site.
Installation of (8) new gas boilers and their prefabricated enclosure. Filing B00390325-I1.
Filing B00390325-I1 reached an approved status.
Reconstruction of concrete guard wall and localized concrete slab repair. Filing B00431393-I1.
Filing B00431393-I1 reached an approved status.
The latest status recorded for B00343183-I1 is “LOC Issued.”
The latest status recorded for B00343183-P1 is “Approved.”
DOB lists a first permit date for B00390325-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00431393-I1. That is not by itself confirmation of activity on site.
Installation of (8) new gas boilers and their prefabricated enclosure. Filing B00390325-P1.
Filing B00390325-P1 reached an approved status.
The latest status recorded for B00390325-P1 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390322-P1.
Filing B00390322-P1 reached an approved status.
The latest status recorded for B00390322-P1 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390322-P2.
Filing B00390322-P2 reached an approved status.
The latest status recorded for B00390322-P2 is “Approved.”
Reconstruction of concrete guard wall and localized concrete slab repair. Filing B00431393-P1.
Filing B00431393-P1 reached an approved status.
The latest status recorded for B00431393-P1 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390322-P3.
Filing B00390322-P3 reached an approved status.
The latest status recorded for B00390322-P3 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390322-P4.
Filing B00390322-P4 reached an approved status.
The latest status recorded for B00390322-P4 is “Approved.”
DOB recorded a sign-off for B00431393-I1.
The latest status recorded for B00431393-I1 is “LOC Issued.”
Herewith filing for strengthening of concrete guard wall and localized concrete slab repair (to address work without a permit violation # 39109773y) per plans. no change in use, occupancy or egress under this application. Filing B01027713-I1.
Filing B01027713-I1 reached an approved status.
DOB recorded a sign-off for B00390322-I1.
The latest status recorded for B00390322-I1 is “LOC Issued.”
DOB recorded a sign-off for B00390325-I1.
The latest status recorded for B00390325-I1 is “LOC Issued.”
DOB lists a first permit date for B01027713-I1. That is not by itself confirmation of activity on site.
Herewith filing for strengthening of concrete guard wall and localized concrete slab repair (to address work without a permit violation # 39109773y) per plans. no change in use, occupancy or egress under this application. Filing B01027713-P2.
Filing B01027713-P2 reached an approved status.
The latest status recorded for B01027713-P2 is “Approved.”
The latest status recorded for B01027713-I1 is “Permit Entire.”