DOB filing B01100280-I1
Alteration filing at 1426 Freeport Loop
Building record · BIN 3098295
1426 Freeport Loop, Brooklyn, NY 11239
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3098295
1426 Freeport Loop
Spring Creek-Starrett City, Brooklyn
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 4-story garage or fuel station built in 1973, on a 81,900 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 22 notices on file; the most recent was issued Sep 23, 2024.
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3098295. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing. Its latest status categories are 4 approved, 3 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1426 Freeport Loop.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions. Filing B00343162-I1.
Filing B00343162-I1 reached an approved status.
DOB lists a first permit date for B00343162-I1. That is not by itself confirmation of activity on site.
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions. Filing B00343162-P1.
Filing B00343162-P1 reached an approved status.
DOB recorded a sign-off for B00343162-I1.
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00388700-I1.
Filing B00388700-I1 reached an approved status.
DOB lists a first permit date for B00388700-I1. That is not by itself confirmation of activity on site.
Installation of (4) new gas boilers and their prefabricated enclosure. Filing B00388709-I1.
Filing B00388709-I1 reached an approved status.
The latest status recorded for B00343162-I1 is “LOC Issued.”
The latest status recorded for B00343162-P1 is “Approved.”
DOB lists a first permit date for B00388709-I1. That is not by itself confirmation of activity on site.
Installation of (4) new gas boilers and their prefabricated enclosure. Filing B00388709-P1.
Filing B00388709-P1 reached an approved status.
The latest status recorded for B00388709-P1 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00388700-P1.
Filing B00388700-P1 reached an approved status.
The latest status recorded for B00388700-P1 is “Approved.”
DOB recorded a sign-off for B00388700-I1.
The latest status recorded for B00388700-I1 is “LOC Issued.”
DOB recorded a sign-off for B00388709-I1.
The latest status recorded for B00388709-I1 is “LOC Issued.”
Herewith filing localized concrete repair of slabs, columns and walls per plans. no change in use, occupancy or egress under this application. Filing B01100280-I1.
Filing B01100280-I1 reached an approved status.
DOB lists a first permit date for B01100280-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01100280-I1 is “Permit Entire.”